- Conference Article
- 10.1063/1.41120
The design of ESRF Front Ends
- Jan 01, 1991
- AIP conference proceedings
- Trevor Mairs + 1 more +1
As part of phase 1 the ESRF will be installing 15 Front Ends in 1992, which will be split into 7 insertion device Fronts Ends and 8 bending magnet Front Ends. The design of the Front Ends is limited by the high power loads (500 W/mm2 at 13 m from the source and a total of 10 KW per Front End) and the time restrictions imposed by a short time schedule. The ESRF has adopted a standardised approach where all insertion device Front Ends are identical and capable of handling the high power densities of undulators and/or the high total power of wigglers. This simplifies the manufacture and installation of such a large number of Front Ends in the short time available. This approach has necessitated the use of some novel compromises. The design choices made for high power absorbers, beryllium windows, vacuum protection systems and other vacuum equipment within the Front End are described. Future possible developments on phase 2 beamlines at the ESRF are discussed.
Read more