Abstract Industry advances continue to enable pursuit of more challenging drilling targets with complex well bore trajectories. Many of these targets are in costly deepwater and/or remote operating areas. Demand for a practical, field-proven drill pipe fatigue management system has grown as drill string failures due to fatigue contribute to a significant amount of non-productive time and cost. The response to this demand has been the development of an engineered approach that combines pipe section positioning and inspection scheduling based on estimated fatigue damage rather than rotating hours or footage drilled. Successful real-time field implementation with ongoing drilling programs demonstrates that the cumulative fatigue damage technique is a valuable and proven tool for risk mitigation and cost reduction. The cumulative fatigue damage technique and its implementation have been introduced in previous literature [1,3,8,10]. This method of monitoring fatigue damage due to rotary operations allows the pipe to be evaluated under real-time operating conditions along a specific section or the entire length of the drill pipe. Monitoring begins at spud and is performed on each joint of drill pipe as it traverses along the well path to total depth (TD). This not only allows a quantitative measure of the relative fatigue damage accumulated joint by joint for the drill pipe, but also provides the opportunity to manage logistics, forecast pipe inspections and position pipe sections to minimize cumulative drill string fatigue damage. The cumulative fatigue damage technique has been successfully applied in the field[1,10]. Hind casting, pre-drill planning and real-time analyses have been utilized for assessing drill string design as well as pipe management. The current case study further demonstrates the methodology introduced in the previous literature and illustrates the modeling and management of fatigue damage over a three well project. The subject operator originally anticipated that pipe inspection may be required before each well to mitigate costly historical drill pipe failures. However, the cost and logistical challenges of mid-program pipe inspection in remote operations could not be ignored. Described is the pipe management strategy employed to complete the drilling program without drill pipe failures and without the need for any mid-program inspections. In addition, the inspection results post TD of the third programmed well have been evaluated and correlated back to expected pipe damage, making this an excellent case study for the further deployment of this technology.

Similar Papers
  • Research Article
  • Citations1

Cumulative fatigue damages of nonstructural members under repeated cyclic wind actions

  • Jan 01, 1992
  • Wind Engineers, JAWE
  • Naotsune Taga +2
  • Conference Article
  • Citations8

The Effect Of Hole Curvature On Drill Pipe While Drilling Inside Casing Or Open Hole

  • Oct 09, 1977
  • Tommy Warren
  • Conference Article
  • Citations4

High Performance, Slim-hole Drilling with 4 in. Drill Pipe and a Streamline Connection

  • Sep 13, 2004
  • Guillaume J Plessis +3
  • Research Article
  • Citations7

Fatigue Damage Evaluation of Pile‐Supported Bridges under Stochastic Ice Loads

  • Jan 01, 2020
  • Advances in Civil Engineering
  • Tianyu Wu +2
  • Conference Article

Vibration wave characteristics in Conventional and Periodic Drill string models

  • Jan 01, 2016
  • Fesmi Abdul Majeed +1
  • Book Chapter

Prediction Fatigue Life of Dumpers with Cumulative Fatigue Damage Approach and Finite Element Model

  • Jan 01, 2007
  • Computational Mechanics
  • Lijuan Cao +1
  • Research Article

Cumulative Fatigue Damage by Block Loading with p-Distribution (2 nd Report)

  • Jan 01, 1982
  • Journal of the Society of Naval Architects of Japan
  • Kunihiro Iida +1
  • Research Article
  • Citations1

Research on Fatigue Strength of Polar Icebreaker Structures Considering Ice Loads Based on Discrete Ice Element Model

  • Aug 12, 2025
  • Journal of Marine Science and Engineering
  • Lizhi Chen +1
  • Abstract

Electrical resistivity of an incrementally fatigued lead alloy: Lawson, L. and Meshii, M. Scr. Metall. Mater. July 1991 25, (7), 1713–1717

  • Jul 01, 1992
  • International Journal of Fatigue
  • Research Article
  • Citations91

On some basic problems of fatigue research in engineering

  • Sep 07, 2001
  • International Journal of Fatigue
  • Xiulin Zheng
  • Research Article
  • Citations6

Prediction of cumulative fatigue damage

  • Sep 01, 1985
  • Journal of Materials Science
  • Muhammad Aslam +1
  • Preprint Article
  • Citations2

The effect of temperature on fatigue strength and damage of FRP composite laminates

  • May 22, 2021
  • Hossein Mivehchi
  • Research Article
  • Citations24

Frequency based fatigue analysis and temperature effect

  • Jun 24, 2011
  • Materials & Design
  • Aleš Zalaznik +1
  • Conference Article
  • Citations2

Fatigue life simulation of rotary tiller blades synthetic using experimental and finite elements analysis tools

  • Jan 01, 2011
  • 2011 Louisville, Kentucky, August 7 - August 10, 2011
  • Dong Ming Gao +3
  • Research Article
  • Citations15

System reliability analysis of mooring system for floating offshore wind turbine based on environmental contour approach

  • Jul 19, 2023
  • Ocean Engineering
  • Guanhua Zhao +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.