Abstract

The management of Stress Corrosion Cracking (SCC) represents one of the challenges for pipeline operating companies with pipelines potentially susceptible to SCC. In order to help better support the management of SCC, a graded performance specification for the high-resolution Electro-Magnetic Acoustical Transducer (EMAT) In-Line Inspection (ILI) technology is derived which provides higher levels of confidence for detection of crack-field anomalies with critical dimensions. This paper presents the process used to derive the graded performance values for the EMAT ILI technology with regard to SCC. The process covers the Probability of Detection (POD) and Probability of Identification (POI). A blind test was carried out to derive the graded performance specification. Test data set was compiled comprising EMAT data for several joints containing relevant anomalies and neighboring joints, some containing additional shallow SCC. These joints had been dug based on EMAT ILI data and all of the joints were evaluated with 360 degree Non-Destructive Examination (NDE) followed by destructive testing. For each target joint with relevant anomalies to be assessed, four additional joints were added in random order to generate a realistic density and distribution of anomalies. Furthermore, pipe joints with non-crack like anomalies, as well as pipe joints with mixed populations were included in the blind test data set to ensure a realistic feature population and to assess POI without side effects of a weighed feature population inside set of composed ILI data. The data set was then evaluated by multiple analysts and result from each analyst were evaluated and utilized to derive the POD and POI values for the graded specification. In addition, the full process of data analysis including team lead review was carried out for one of the analysts for comparison to the individual analyst results. Anomaly dimensions were compared against the true population to derive the POD and POI values. Furthermore, length and depth sizing performance was assessed.

Similar Papers
  • Conference Article
  • Citations1

The Use of Hydrotesting and EMAT Inline Inspection Technology for the Integrity Management of Stress Corrosion Cracking (SCC) in Gas Pipelines

  • Sep 26, 2016
  • Pedro M Hryciuk +5
  • Single Report

PR-366-173814-R02 Assessment of SCC with Advances in NDE including EMAT and IWEX Imaging

  • Jun 23, 2020
  • Bruce Nestleroth +3
  • Conference Article

Utilization of a Probabilistic Function to Describe the Performance of In-Line Crack Inspection Systems and a Possible Application in Hydrogen Service

  • Sep 26, 2022
  • Timo Moritz +2
  • Conference Article
  • Citations1

Practical Method of Updating Stochastic Remaining Life of Pipelines Using ILI Data

  • Jan 01, 2004
  • Margarita G Malyukova +2
  • Conference Article
  • Citations1

Effect of Calibration of Measurements on Integrity Reliability Analysis

  • Sep 26, 2016
  • Karmun Cheng +3
  • Research Article
  • Citations11

Bayesian Updating and Reliability Analysis for High-pH Stress Corrosion Cracking in Gas Pipelines

  • May 04, 2020
  • Journal of Engineering Mechanics
  • Kong Fah Tee +1
  • Conference Article
  • Citations2

Managing the Threat of Selective Seam Weld Corrosion Using a State of the Art ILI System

  • Sep 28, 2020
  • Christopher Davies +2
  • Conference Article

Stress Corrosion Cracking “Like-in-Kind” Reliability Approach for Pipelines Without Crack Tool In-Line Inspection

  • Sep 28, 2020
  • Amal Elsisi +3
  • Conference Article
  • Citations1

Corrosion Growth Modeling by Learning a Dynamic Bayesian Network From Multiple In-Line Inspection Data

  • Sep 24, 2018
  • Wei Xiang +1
  • Conference Article
  • Citations6

Validation of Corrosion Growth Rate Models

  • Mar 26, 2017
  • Yanping Li +3
  • Single Report

L51575 Mechanics-Based Analysis of SCC in a Carbonate-Bicarbonate Environment

  • Aug 01, 1988
  • Leis +1
  • Conference Article

A Pro-Active Approach Towards Management of Cracks in Steel Pipelines

  • Sep 10, 2025
  • Sameera Naib +1
  • Conference Article

Numerical Assessment of Dented Pipe Using Inline Inspection Data

  • Sep 28, 2020
  • Parththeeban Murugathasan +4
  • Conference Article
  • Citations4

Cathodic Protection, Coatings That Shield Cathodic Protection, Stress Corrosion Cracking and Corrosion Assessment in Aging Coated Pipe Lines and Buried Utility Structures

  • Apr 15, 2018
  • Mehrooz Zamanzadeh +2
  • Single Report

PR-244-173856-WEB ILI Crack Tool Reliability and Performance Evaluation

  • Sep 11, 2019
  • Smitha Koduru
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.