Abstract

In practice, activities of the construction multiproject use limited resources in different locations, which requires resources to be transferred frequently between projects or activities. In this study, we simultaneously consider the stochastic resource transfer times and the dynamic arrival of new projects during the multiproject execution and propose the resource-constrained dynamic multiproject scheduling problem with stochastic transfer times (RCDMPSP-STT). Since priority rule (PR)-based heuristic methods can efficiently solve project scheduling problems through real-time decision making in uncertain environments, we evaluate the performance of 72 PR-based heuristic methods based on six objectives from the project, multiproject, and resource perspectives. Each PR-based heuristic method consists of an activity priority rule (APR) and a transfer priority rule (TPR) to determine the sequence of activities and resource transfer. Moreover, based on the resource transfer information, we design eight new APRs. In addition, a hybrid PR-based heuristic method is proposed to select different PR-based heuristic methods for multiproject scheduling based on the arrival time of the new projects. Extensive numerical experiments show that the newly designed resource transfer information-based APRs and composite APRs perform better on the robustness and makespan objectives, respectively, with an improvement of 30.63% and 22.24% compared with the classical APRs. Furthermore, under different objectives and perspectives, better-performing PR-based heuristic methods are recommended for the project and multiproject managers.

Similar Papers
  • Conference Article
  • Citations2

Optimal Task Reallocation in Heterogeneous Distributed Computing Systems with Age-Dependent Delay Statistics

  • Sep 01, 2010
  • Jorge E Pezoa +3
  • Research Article
  • Citations43

Appointment scheduling with multiple providers and stochastic service times

  • Mar 06, 2019
  • European Journal of Operational Research
  • Mohamad Soltani +2
  • Research Article
  • Citations26

Inventory control of raw materials under stochastic and seasonal lead times

  • Dec 01, 2005
  • International Journal of Production Research
  • E A Silver +1
  • Research Article
  • Citations82

Evaluating the Impact of Alternative Hydro-Climate Scenarios on Transfer Agreements: Practical Improvement for Generating Synthetic Streamflows

  • May 21, 2012
  • Journal of Water Resources Planning and Management
  • Brian R Kirsch +2
  • Conference Article
  • Citations1

Communication-Critical Task Duplication for Cloud Workflow Scheduling with Time and Budget Concerns

  • Oct 01, 2019
  • Mohammad Kamyar Arbab +2
  • Research Article
  • Citations12

A heuristic operation sequence-pattern identification method and its applications in the design of a cellular flexible assembly system

  • May 01, 1994
  • International Journal of Computer Integrated Manufacturing
  • Ying-Chin Ho +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.