Heuristics for Unrelated Parallel Machine Scheduling with Secondary Resource Constraints

  • Dec 1, 2007
  • Jeng-Fung Chen
Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

This research deals with the problem of scheduling N jobs on M unrelated parallel machines. Each job has a due date and requires a single operation. A setup that includes detaching one die and attaching another from the appropriate die type is incurred if the type of the job scheduled is different from the last job on that machine. Due to the mechanical structure of machines and the fitness of dies to each, the processing time for a job depends on the machine on which the job is processed, and some jobs are restricted to be processed on certain machines. Furthermore, the required detaching and attaching times depend on both the die type and the machine. This type of problems may be encountered, for example, in plastics forming industry where unrelated parallel machines are used to process different components and setups for auxiliary equipment (e.g., dies) are necessary. This type of scheduling problems is also frequently encountered in injection molding departments where many different parallel machines are also used to produce different components and for which setups are required for attaching or detaching molds. In general, the dies (or molds) are quite expensive (tens of thousands dollars each) and thus the number of each type of dies available is limited. Therefore, dies should be considered as secondary resources, the fact of which distinguishes this research from many past studies in unrelated parallel-machine scheduling in which secondary resources are not restricted. This type of problems is NP-hard (So, 1990). When dealing with a large instance encountered in industry, in the worst case, it may not be able to obtain an optimal solution in a reasonable time. In this research heuristics based on guided search, record-to-record travel, and tabu lists from the tabu search (TS) are presented to minimize the maximum completion time (i.e., makespan or Cmax) and maximum tardiness (i.e., Tmax), respectively, to promote schedule performance. Computational characteristics of the proposed heuristics are evaluated through extensive experiments. The rest of this research is organized in six sections. Previously related studies on parallel machine scheduling are reviewed in Section 2. The record-to-record travel and tabu lists are briefly described in Section 3. The proposed heuristic to minimize makespan and the computational results are reported in Section 4. The proposed heuristic to minimize maximum tardiness and the computational results are reported in Section 5. Conclusions and suggestions for future research are discussed in Section 6. O pe n A cc es s D at ab as e w w w .ite ch on lin e. co m

Similar Papers
  • Research Article
  • Citations29

An integrated three-stage maintenance scheduling model for unrelated parallel machines with aging effect and multi-maintenance activities

  • Mar 02, 2015
  • Computers & Industrial Engineering
  • Madjid Tavana +2
  • Research Article
  • Citations160

Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective

  • Mar 21, 2001
  • International Journal of Production Economics
  • Michael X Weng +2
  • PDF
  • Research Article
  • Citations53

Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times

  • Jul 05, 2018
  • PLoS ONE
  • Absalom E Ezugwu +2
  • Conference Article
  • Citations30

Solving Optimization Problems with Diseconomies of Scale via Decoupling

  • Oct 01, 2014
  • Konstantin Makarychev +1
  • Research Article
  • Citations235

Unrelated parallel machine scheduling with setup times using simulated annealing

  • Feb 05, 2002
  • Robotics and Computer-Integrated Manufacturing
  • Dong-Won Kim +3
  • Conference Article
  • Citations8

Unrelated parallel machine scheduling with multi-maintenance activities using CPLEX

  • Jan 01, 2019
  • AIP conference proceedings
  • V Poongothai +2
  • PDF
  • Research Article
  • Citations1

Hybrid Metaheuristics for the Unrelated Parallel Machine Scheduling to Minimize Makespan and Maximum Just-in-Time Deviations

  • Jan 01, 2012
  • International Journal of Advanced Research in Artificial Intelligence
  • Chiuh Cheng +1
  • Research Article
  • Citations58

Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem

  • Aug 14, 2014
  • Computers & Operations Research
  • Veronique Sels +3
  • Book Chapter
  • Citations8

Makespan Minimization on Unrelated Parallel Machines with a Few Bags

  • Jan 01, 2018
  • Daniel R Page +1
  • Dissertation

A scheduling in flexible flow shop problem with unrelated parallel machines and sequence-dependent setup times

  • Jan 01, 2007
  • Jitti Jungwattanakit
  • Conference Article
  • Citations1

Local Search Heuristic for Multiple Objective Coil Scheduling Problem on Unrelated Parallel Machines

  • Apr 01, 2009
  • Yang Yang +1
  • Research Article
  • Citations5

Algorithms for hierarchical and semi-partitioned parallel scheduling

  • Apr 15, 2021
  • Journal of Computer and System Sciences
  • Vincenzo Bonifaci +2
  • Research Article
  • Citations13

Scheduling in a two-stage flowshop with parallel unrelated machines at each stage and shared resources

  • Sep 24, 2018
  • Computers & Industrial Engineering
  • Ewa Figielska
  • Peer Review Report

Peer Review #2 of "A mathematical formulation and an NSGA-II algorithm for minimizing the makespan and energy cost under time-of-use electricity price in an unrelated parallel machine scheduling (v0.1)"

  • Feb 03, 2022
  • Conference Article

An MIP-based heuristic approach to determine production lot size for capacitated single-stage production processes with stochastic demand on parallel machines

  • Mar 01, 2017
  • Supatchaya Chotayakul +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.