• Cite Icon2
  • https://doi.org/10.4043/4913-msCopy DOI Icon

Hutton TLP Installation

  • May 6, 1985
  • H Bradshaw +2 more
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

ABSTRACT Installation of the Hutton TLP required precise simultaneous control of several complex systems. This paper describes the equipment and operations involved in the deployment and connection of the sixteen tension legs, and the documentation used for control. The equipment trials and personnel training programmes undertaken to ensure the first-time success of this unique operation are presented. The paper concludes with an appraisal of the installation process and the significance of the principles employed to the development of deep water TLPs. INTRODUCTION Installation of the Hutton Tension Leg Platform, a new concept in oilfield development(l), was carried out in under four days. The process of installation involved translation of the free floating vessel into a vertically restrained platform. This operation was unprecedented in its reliance on multiple systems, novel equipment and specially trained personnel. It entailed the assembly and deployment of sixteen tension legs, their connection to four pre-installed foundations, and the application of 13,000 tonnes of tension. These unique operations required the deve1opment of detail ed procedures to control the installation systems and activities. The use of equipment unproven in service and personnel inexperienced in the special operations necessitated intensive trials and training programmes to ensure a safe and efficient installation. The installation of the TLP, 90 miles north-east of the Shetland islands and in a water depth of 148 metres, was completed on 15th July and first oil produced on 6th August, 1984. PRINCIPLES OF INSTALLATION The TLP is a compliant structure where the vertical motions of heave, pitch and roll are suppressed by leg tension. The tension is induced by an excess of buoyancy over platform weight. This concept can be represented by the equation of static equilibrium:(Equation available in full paper) The static 'pre-tension' must be sufficient to maintain the legs in tension for all operating conditions and extreme environmental events. Approximate values are:(Equation available in full paper) This condition is achieved by restraining the platform approximately 10 metres deeper in the water than its free floating draft. Significant changes in operating loads, riser tensions and platform centre of gravity can be accommodated by the transfer of ballast. Installation requirements were a major factor influencing the design of the mooring system, thus engineering for installation proceeded in parallel with mooring system design. An early decision in the design process was the method of 'stabbing' the legs into the foundation mooring sleeves. Unaided stabbing was considered the most reliable, efficient and easily engineered method, provided the platform position could be maintained within acceptable tolerances. The design environmenta1 conditions were established as a wind speed of 10 m/s and a sea state typically of 2m significant wave height and 7s period. Analyses and model tests demonstrated acceptable leg motions and established a vessel positioning tolerance requirement of 1.5m during stabbing.

Similar Papers
  • Conference Article

Experimental Validation of a Numerical Model for a Dry-Tree Semisubmersible in Benign Environments

  • Jun 08, 2014
  • Bruce Martin +2
  • Research Article
  • Citations1

Quayside Mooring System Design of Prelude FLNG for Extreme Environmental Condition

  • Feb 28, 2018
  • Journal of Ocean Engineering and Technology
  • Jin-Woog Cho +5
  • Book Chapter

Optimal mooring system deployment in line breakage condition

  • Jul 08, 2021
  • Mingxiao Liang +3
  • Conference Article
  • Citations2

SS: Fiber Moorings, Recent Experiences and Research: Analysis, Design and Installation of Polyester Rope Mooring Systems in Deep Water

  • May 03, 2010
  • Omar P De Andrade +1
  • Research Article
  • Citations108

Review of Wave Energy Converter and Design of Mooring System

  • Oct 07, 2020
  • Sustainability
  • Dongsheng Qiao +4
  • Conference Article

Shallow Water STL Mooring and Riser System

  • Jan 01, 2009
  • Qinzheng Yang +2
  • Conference Article

Optimization of Taut Mooring System for Deepwater Floating Platform Based on Real Data

  • Oct 21, 2025
  • OTC Brasil
  • Bingzhen Gao +6
  • Conference Article

Production Techniques From Tension Leg Platforms

  • May 07, 1978
  • Chester B Falkner +1
  • PDF
  • Research Article
  • Citations2

Research on Replacing Numerical Simulation of Mooring System with Machine Learning Methods

  • May 31, 2024
  • Applied Sciences
  • Qiang Sun +5
  • Conference Article
  • Citations2

Experiences in Classification of Deepwater Mooring Systems for Floating Installations

  • May 04, 1998
  • Ken Huang +1
  • Conference Article
  • Citations3

Design and Manufacture of Couplings for the Hutton TLP Mooring System

  • May 06, 1985
  • F Skilbeck +2
  • Conference Article

Intelligent Optimization Design of a Deepwater Semi-Submersible Platform Mooring System Based on Multi-Task Shared Neural Networks

  • Apr 28, 2025
  • Hong Zhu +6
  • Conference Article
  • Citations2

Liuhua 11-1 FPS Dry-dock Upgrade and Life Extension - Mooring System Evaluation and Optimization

  • May 06, 2013
  • Wen Jun Zhong +4
  • Conference Article
  • Citations1

System Development and Use to Position Mooring System and Semisubmersible Platform In 2,910 ft of Water

  • Apr 27, 1987
  • P Gabrielsen +2
  • Research Article
  • Citations33

Mooring design of offshore aquaculture platform and its dynamic performance

  • Mar 13, 2023
  • Ocean Engineering
  • Jun Yu +5
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.