Impacts of Matched Batch Sizes on Time Reduction in Construction Projects

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Batching production is to process products in lots rather than by the piece and most activities in repetitive construction projects are performed by batching production. Batch size is a key factor which affects duration of construction project and it is recommended to use small batch size for early completion of construction projects. However, it is possible that batch sizes are different each other between activities, and no research about impacts of batch size matching has been conducted. This paper is to examine the impacts of batch size matching on construction duration. A computer simulation model which includes two activities was developed. Two hypotheses were tested under the Monte-Carlo simulation method: 1) small batch sizes which are not matched each other can reduce time depending on productivities and 2) synchronized batch sizes leads to earlier completion of project than unsynchronized batch sizes irrespective of productivities. The results identify an advantage of matching batch sizes with regard to project duration and show that batch size matching needs consideration of compatibility between productivities also.

Similar Papers
  • Research Article
  • Citations3

Batch size: go big or go home? Counterintuitive improvement in medical autoencoders with smaller batch size.

  • Apr 03, 2023
  • Proceedings of SPIE--the International Society for Optical Engineering
  • Cailey I Kerley +6
  • Book Chapter
  • Citations41

Momentum Batch Normalization for Deep Learning with Small Batch Size

  • Jan 01, 2020
  • Hongwei Yong +4
  • Research Article
  • Citations20

A GA optimization model for workgroup-based repetitive scheduling (WoRSM)

  • Jun 11, 2008
  • Advances in Engineering Software
  • Rong-Yau Huang +1
  • Research Article
  • Citations166

Optimal Planning and Scheduling for Repetitive Construction Projects

  • Jan 01, 2006
  • Journal of Management in Engineering
  • Khalied Hyari +1
  • Conference Article
  • Citations13

Taming the Noisy Gradient: Train Deep Neural Networks with Small Batch Sizes

  • Aug 01, 2019
  • Yikai Zhang +3
  • PDF
  • Research Article
  • Citations2

Improving Supervisory Consultant Performance in Construction Projects: Assessments in the LKPP's SIKaP Application for Enhanced Efficiency

  • Aug 03, 2024
  • Sustainable Civil Building Management and Engineering Journal
  • Yudha Pracastino Heston +2
  • Conference Article
  • Citations4

Ramifications of Evolving Misbehaving Convolutional Neural Network Kernel and Batch Sizes

  • Nov 01, 2018
  • Mark Coletti +4
  • Research Article

Resource Utilization and Repetitive Construction Scheduling using the Discrete Event Simulation Method

  • Apr 03, 2025
  • Engineering, Technology & Applied Science Research
  • Adnan Fadjar +2
  • Conference Article

NanoAdapt: Mitigating Negative Transfer in Test Time Adaptation with Extremely Small Batch Sizes

  • Aug 01, 2024
  • Younghyun Kim +5
  • Research Article
  • Citations22

System development for non-unit based repetitive project scheduling

  • Jun 04, 2005
  • Automation in Construction
  • Rong-Yau Huang +1
  • Research Article
  • Citations13

A Multi Criteria Decision Making Model for Prioritizing the Non-Critical Activities in Construction Projects

  • Sep 14, 2018
  • KSCE Journal of Civil Engineering
  • Gholamreza Heravi +1
  • Research Article
  • Citations1

Assessing air pollution emission from construction project activities

  • Mar 25, 2025
  • Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
  • Amina Nazif +4
  • Book Chapter

Improving Visual Reinforcement Learning with Discrete Information Bottleneck Approach

  • Sep 28, 2023
  • Frontiers in artificial intelligence and applications
  • Haitao Wang +1
  • Research Article
  • Citations1

A surcharge pricing policy for supply chain coordination under the just-in-time (JIT) environment in the presence of backordering

  • Feb 09, 2021
  • OPSEARCH
  • Abhishek Chakraborty
  • Research Article
  • Citations42

Adaptive learning rate clipping stabilizes learning

  • Mar 01, 2020
  • Machine Learning: Science and Technology
  • Jeffrey M Ede +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.