• Home
  • Search
  • Improved Flow Shop Schedules with Total Completion Time Criterion
  • https://doi.org/10.1007/978-3-642-39646-5_19Copy DOI Icon

Improved Flow Shop Schedules with Total Completion Time Criterion

  • Jan 1, 2013
  • Dipak Laha +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Similar Papers
Abstract

The paper addresses the permutation flow shop scheduling problem with the minimization of the total completion time objective. Two heuristics are presented combining two note-worthy constructive heuristics. Exhaustive computational results on standard benchmark problems are presented. It is shown that the solutions generated are better than those obtained by the well - known heuristic in the literature. Statistical significance of better results produced by the proposed heuristics is also reported.

Similar Papers
  • Research Article
  • Citations9

A heuristically directed immune algorithm to minimize makespan and total flow time in permutation flow shops

  • Jul 27, 2017
  • The International Journal of Advanced Manufacturing Technology
  • Arindam Chakravorty +1
  • Conference Article
  • Citations3

Minimizing total flow time in permutation flow shop scheduling with improved simulated annealing

  • May 01, 2009
  • Uday K Chakraborty
  • Book Chapter
  • Citations1

Scheduling Unit Execution Time Tasks on Two Parallel Machines with the Criteria of Makespan and Total Completion Time

  • Jan 01, 2005
  • Yakov Zinder +1
  • Research Article
  • Citations1

Permutation flow shop scheduling problem under non-renewable resources constraints

  • Jan 01, 2019
  • International Journal of Mathematical Modelling and Numerical Optimisation
  • Zaki Sari +2
  • Research Article
  • Citations27

A Pareto block-based estimation and distribution algorithm for multi-objective permutation flow shop scheduling problem

  • Jul 14, 2014
  • International Journal of Production Research
  • Anurag Tiwari +3
  • Research Article

An Iterative Greedy Algorithm Involving a Q-Learning Mechanism for Solving the Permutation Flow Shop Scheduling Problem with Sequence-Dependent Setup Times

  • Jan 01, 2025
  • Mathematical Modeling and Computing
  • K Mesmar +2
  • Research Article

An Application of New Heuristic Approach on Small Scale Industry for Flow Shop Environment

  • Jan 01, 2016
  • Asian Journal of Research in Social Sciences and Humanities
  • P Dharmalingam +3
  • Research Article
  • Citations10

A new heuristic for minimizing total completion time objective in permutation flow shop scheduling

  • Sep 01, 2010
  • The International Journal of Advanced Manufacturing Technology
  • Dipak Laha +1
  • Research Article
  • Citations6

Algorithms for bicriteria minimization in the permutation flow shop scheduling problem

  • Jan 01, 2011
  • Journal of Industrial & Management Optimization
  • Ethel Mokotoff
  • Research Article
  • Citations38

A Knowledge-Guided End-to-End Optimization Framework Based on Reinforcement Learning for Flow Shop Scheduling

  • Feb 01, 2024
  • IEEE Transactions on Industrial Informatics
  • Zixiao Pan +3
  • Conference Article

A Plant Growth Simulation Algorithm for Permutation Flow Shop Scheduling Problem

  • Jan 01, 2015
  • Zhenhong He +1
  • Research Article
  • Citations1

A Memetic Gravitation Search Algorithm for Solving Permutation Flow Shop Scheduling

  • Dec 01, 2014
  • Advanced Materials Research
  • Ko Wei Huang +2
  • Conference Article
  • Citations1

New high performing hybrid particle swarm optimization for permutation flow shop scheduling problem with minimization of makespan

  • Dec 01, 2010
  • Y Sun +4
  • Research Article
  • Citations23

Min–max regret criterion-based robust model for the permutation flow-shop scheduling problem

  • May 24, 2019
  • Engineering Optimization
  • Wenzhu Liao +1
  • Research Article
  • Citations50

Memetic algorithm with node and edge histogram for no-idle flow shop scheduling problem to minimize the makespan criterion

  • Jan 19, 2017
  • Applied Soft Computing
  • Weishi Shao +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.