Abstract

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem becomes a flexible flow shop problem (FFSP). FFSP which contains all the complexities involved in a simple flow shop and parallel machine scheduling problems is a well-known NP-hard (Non-deterministic polynomial time) problem. Owing to high computational complexity involved in solving these problems, it is not always possible to obtain an optimal solution in a reasonable computation time. To obtain near-optimal solutions in a reasonable computation time, a large variety of meta-heuristics have been proposed in the past. However, tuning algorithm-specific parameters for solving FFSP is rather tricky and time consuming. To address this limitation, teaching–learning-based optimization (TLBO) and JAYA algorithm are chosen for the study because these are not only recent meta-heuristics but they do not require tuning of algorithm-specific parameters. Although these algorithms seem to be elegant, they lose solution diversity after few iterations and get trapped at the local optima. To alleviate such drawback, a new local search procedure is proposed in this paper to improve the solution quality. Further, mutation strategy (inspired from genetic algorithm) is incorporated in the basic algorithm to maintain solution diversity in the population. Computational experiments have been conducted on standard benchmark problems to calculate makespan and computational time. It is found that the rate of convergence of TLBO is superior to JAYA. From the results, it is found that TLBO and JAYA outperform many algorithms reported in the literature and can be treated as efficient methods for solving the FFSP.

Loading PDF

Similar Papers
  • Research Article
  • Citations43

A swarm optimization approach for flexible flow shop scheduling with multiprocessor tasks

  • Dec 04, 2011
  • The International Journal of Advanced Manufacturing Technology
  • Manas Ranjan Singh +1
  • Research Article
  • Citations11

Combined column generation and constructive heuristic for a proportionate flexible flow shop scheduling

  • Aug 03, 2007
  • The International Journal of Advanced Manufacturing Technology
  • Yueh-Min Huang +1
  • Research Article
  • Citations32

Scheduling of multi-component products in a two-stage flexible flow shop

  • Mar 25, 2015
  • Applied Soft Computing
  • Fatemeh Nikzad +3
  • PDF
  • Research Article
  • Citations3

Three Algorithms for Flexible Flow-shop Scheduling

  • Nov 01, 2007
  • American Journal of Applied Sciences
  • Hong
  • Research Article
  • Citations1

A Fuzzy CDS-based Scheduling Algorithm for More Than Two Machine Centers

  • Jul 20, 2001
  • Journal of Advanced Computational Intelligence and Intelligent Informatics
  • Tzung-Pei Hong +2
  • Research Article
  • Citations16

A new memetic global and local search algorithm for solving hybrid flow shop with multiprocessor task scheduling problem

  • Nov 23, 2020
  • SN Applied Sciences
  • Batuhan Eren Engin +1
  • Book Chapter
  • Citations1

Minimizing Makespan in Flow Shop Scheduling Using a Network Approach

  • Jan 11, 2012
  • Amin Sahraeian
  • Research Article
  • Citations66

Group scheduling in flexible flow shops: a hybridised approach of imperialist competitive algorithm and electromagnetic-like mechanism

  • Aug 15, 2011
  • International Journal of Production Research
  • N Karimi +2
  • Research Article
  • Citations15

Effective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problem

  • Feb 06, 2023
  • Computers & Operations Research
  • Shuang Zheng +4
  • Research Article
  • Citations1

A control method to save machine energy in production

  • Jul 01, 2018
  • IOP Conference Series: Materials Science and Engineering
  • Wei Weng +2
  • Research Article
  • Citations12

A constraint programming approach for resource-constrained flexible assembly flow shop scheduling problem with batch direct delivery

  • Sep 24, 2024
  • Computers and Operations Research
  • Chuangfeng Zeng +2
  • Dissertation

A scheduling in flexible flow shop problem with unrelated parallel machines and sequence-dependent setup times

  • Jan 01, 2007
  • Jitti Jungwattanakit
  • Research Article
  • Citations2

Solving flexible flow-shop problems by LPT and LN scheduling algorithms

  • Jan 01, 2006
  • International Mathematical Forum
  • Tzung-Pei Hong +3
  • Conference Article
  • Citations3

Metaheuristics for two-stage no-wait flexible flow shop scheduling problem

  • Mar 01, 2015
  • Mageed A Ghaleb +2
  • Research Article
  • Citations6

A Flow Shop Scheduling Problem with Transportation Time and Separated Setup Time of Jobs

  • Jan 01, 2012
  • Procedia Engineering
  • S Agrawal +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.