• Home
  • Search
  • Integrated Cemented Inflow-Control-Device System Design
  • https://doi.org/10.2118/0917-0072-jptCopy DOI Icon

Integrated Cemented Inflow-Control-Device System Design

Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

This article, written by JPT Technology Editor Chris Carpenter, contains highlights of paper SPE 183383, “Integrated Off-Bottom Cemented Inflow-Control-Device System Design Toward Well-Delivery Optimization,” by Mohammed A. Al Madan and Mazen Bu Khamseen, Saudi Aramco, and Hedy Suherdiana and Ahmad Al Abdulmohsen, Baker Hughes, a GE company, prepared for the 2016 Abu Dhabi International Petroleum Exhibition and Conference, Abu Dhabi, 7–10 November. The paper has not been peer reviewed. Off-bottom-cementing (OBC) operations are unique to Saudi Arabia and represent a very challenging approach to drilling and workover operations when deployed in combination with inflow-control devices (ICDs) across horizontal sections. The multitasking-valve (MTV) feature in upgraded ICDs offers safe, simple, and cost-effective deployment operations. This paper discusses the first deployment of an ICD system combined with an OBC system for a workover operation in a mature producer well in the Kingdom of Saudi Arabia. Introduction In wells where an OBC liner is required to cover nontargeted formations above the production zone, two methods of deployment can be used: the one-trip system and the two-trip system. These refer, respectively, to whether the OBC components are deployed in a single trip along with the ICD or in a second trip with string in the previously deployed ICD completion. The one-trip OBC ICD completion does not allow an inner-string application. Therefore, circulation while running in hole was ineffective in this producer, which caused deployment problems. The two-trip OBC ICD completion was then considered. The idea was to split the completion into a lower ICD completion, which is dropped off inside the openhole horizontal section with a setting sleeve. The earlier two-trip OBC ICD completion used an inner string, a circulating system, and an openhole-packer-setting tool. This allowed 100% circulation from the shoe during deployment of the lower ICD completion, although circulation rate is limited because of pumping through the small internal diameter (ID). The upgraded ICD with an MTV allows the lower completion to be deployed without an inner string while achieving 100% circulation at the shoe, which smooths operations and saves up to 24 hours of rig time. The MTV temporarily blocks the communication between string and annulus while running in hole. Once reaching the setting depth, MTVs are actuated by hydraulic pressure. All hydraulically set equipment can also be set at this point. Ultimately, in the case outlined in the complete paper, it was decided to combine once again the separated deployment into a single system by use of the MTV feature, which provides important functions for the one-trip OBC ICD completion—the ability to perform 100% circulation from the shoe and to set all hydraulic downhole tools with one setting ball.

Similar Papers
  • Conference Article

Integrated Off-Bottom Cemented Inflow Control Device System Design Toward Well Delivery Optimization

  • Jan 29, 2018
  • Mohammed A Madan +3
  • Conference Article
  • Citations7

Optimum Lower Completion Design and Implementation for a Highly Fractured Carbonate Reservoir

  • Oct 07, 2013
  • Mohammed A Madan +5
  • Conference Article
  • Citations4

Case Study- Real Time Downhole Telemetry CCL and Tension Compression, a Differentiator for Successful Manipulation of ICD's in Horizontal Wells

  • Dec 15, 2021
  • Usman Ahmed +2
  • Conference Article

A Novel Approach for Production Stimulation through Chemical Applications in A Saudi Arabian Offshore field

  • Jan 19, 2014
  • Abdulelah A Balto +2
  • Conference Article
  • Citations6

Redesigning Completions to Overcome Downhole Flow Assurance and Corrosion Impacts in a Giant Field, Offshore Abu Dhabi.

  • Nov 07, 2016
  • Abdel Hakim Aouda +4
  • Conference Article
  • Citations8

Designing, Planning and Installation of an 8-Zone All-Electric Intelligent Completion System in an Extreme Reservoir Contact Well

  • Sep 15, 2015
  • S Jacob +3
  • Conference Article
  • Citations4

New Inflow Control Device Provides Solid-Liner Functionality Throughout Installation and Fluid Loss Control During Completion

  • Sep 19, 2010
  • Morry Infra +4
  • Conference Article
  • Citations21

ICD Well History and Future Use in Giant Offshore Oilfield, Abu Dhabi

  • Nov 10, 2014
  • Graham Edmonstone +9
  • Conference Article

Measurements of the Inorganic Scale Buildup Rate on Downhole Completion Equipment – Debris Barrier Screens

  • Nov 12, 2018
  • Timothy Morrow +6
  • Research Article
  • Citations6

Thermal Effects on Subsea-Wellhead Fatigue During Workover Operations

  • Aug 01, 2016
  • Journal of Petroleum Technology
  • Chris Carpenter
  • Conference Article

Agile Smart Completion Application for Effective Water Production Control in Heterogeneous Carbonate Reservoir in Abu Dhabi Offshore Reservoir

  • Dec 09, 2021
  • Ali Issa Abdelkerim +3
  • Conference Article
  • Citations9

Pinpointing Water Entries in Dead Horizontal Wells

  • Nov 15, 2011
  • Mustafa Abdulrahman Bawazir +3
  • Conference Article
  • Citations4

Reservoir Characterization while Drilling; A Real Time Geosteering Answer to Maximize Well Values. A Case Study, Offshore Abu Dhabi.

  • Nov 07, 2016
  • A M Serry +2
  • Conference Article
  • Citations1

Ultrasonic Borehole Imaging in the Logging While Drilling Domain in All Mud Types, a Case Study in Offshore Abu Dhabi

  • Oct 02, 2023
  • Hassan Mohamed +4
  • Conference Article
  • Citations2

Production Enhancement Using a Multiphase Helico-Axial Pump in a Remote Hilly-Terrain Oil Field in Saudi Arabia

  • Apr 08, 2012
  • Zulkifli B Samsudin +5
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.