Integrated Global Optimization Model for Electrical Cables in Offshore Wind Farms

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

A MILP program for integrated global optimization of electrical cables systems in Offshore Wind Farms (OWFs) is presented. Electrical cables encompass the cable layout in collection systems to interconnect Wind Turbines (WTs), and transmission systems to couple Offshore Substations (OSSs) to the Onshore Connection Point (OCP). The program is solved through a modern branch-and-cut solver, demonstrating the ability to tackle large-scale instances with hundreds of WTs and several OSSs. The model supports as objective function the initial investment plus economic losses due to total electrical power losses. The importance and functionality of incorporating electrical losses is demonstrated, along with the need to simultaneously optimize the cable layout, OSSs location, and transmission cables. The method is tested for three case studies. The results show that (i) points near the global optimum, with an imposed maximum tolerance, are calculable within reasonable computational time and effort, and (ii) the integrated model can be much more efficient than a benchmark approach based on enumeration, i.e., exhaustive evaluation of all possible optimization problems derived from unique OSSs locations.

Similar Papers
  • PDF
  • Research Article
  • Citations68

Electrical Cable Optimization in Offshore Wind Farms—A Review

  • Jan 01, 2019
  • IEEE Access
  • Juan-Andres Perez-Rua +1
  • Research Article
  • Citations17

Experimental and numerical research on the wet-towing of wide-shallow bucket jacket foundation for offshore substation

  • Mar 14, 2023
  • Ocean Engineering
  • Haijun Wang +5
  • Research Article
  • Citations24

Reliability‐based topology optimization for offshore wind farm collection system

  • Jun 07, 2021
  • Wind Energy
  • Juan‐Andrés Pérez‐Rúa +3
  • Conference Article
  • Citations22

Offshore substation locating in wind farms based on prim algorithm

  • Jul 01, 2015
  • Peng Hou +2
  • Peer Review Report

Reply on CC1

  • Jan 28, 2022
  • Juan-Andrés Pérez-Rúa
  • PDF
  • Peer Review Report

Review of wes-2021-47

  • Jan 18, 2022
  • Michael Muskulus
  • PDF
  • Peer Review Report

Comment on wes-2021-47

  • Nov 09, 2021
  • Juan‐Andrés Pérez‐Rúa +1
  • Research Article
  • Citations38

Overall Optimization for Offshore Wind Farm Electrical System

  • Dec 05, 2016
  • Wind Energy
  • Peng Hou +3
  • Conference Article
  • Citations6

Combined approach based on ACO with MTSP for optimal internal electrical system design of large offshore wind farm

  • Jan 01, 2018
  • Ramu Srikakulapu +1
  • Preprint Article
  • Citations2

Current Source Converter Based Offshore Wind Farm: Configuration and Control

  • May 22, 2021
  • Miteshkumar Nandlal Popat
  • Single Book
  • Citations9

Offshore Wind Power Reliability, availability and maintenance

  • Oct 01, 2021
  • Peter Tavner
  • Conference Article
  • Citations13

Optimal design of collector topology for offshore wind farm based on ant colony optimization approach

  • Dec 01, 2016
  • Ramu Srikakulapu +1
  • Conference Article
  • Citations1

Offshore Wind Turbine in China: Overview, Research Trends, and Challenges

  • Apr 24, 2023
  • Chengxi Li +5
  • Book Chapter
  • Citations1

Preliminary Study of Offshore Wind Turbine Foundation in Malaysia

  • Aug 11, 2022
  • M A N Mutasim +2
  • Research Article
  • Citations3

Predicting Loads and Dynamic Responses of An Offshore Jacket Wind Turbine in A Nonlinear Sea

  • Sep 01, 2020
  • China Ocean Engineering
  • Ying-Guang Wang
Cactus Communications logo