• Home
  • Search
  • Integrated scheduling of part, tool and automated guided vehicles in a flexible manufacturing system using modified genetic algorithm
  • Cite Icon2
  • https://doi.org/10.1504/ijise.2019.10022773Copy DOI Icon

Integrated scheduling of part, tool and automated guided vehicles in a flexible manufacturing system using modified genetic algorithm

Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

Scheduling of part and tools without considering material handling devices may result into non-implementable results as the material handling system constraints affect the overall scheduling. In this paper, an attempt has been made for the simultaneous scheduling of part, tool and two automated guided vehicles (AGVs) in a flexible manufacturing system which has identical machines with no on-board tool magazine. All the tools are stored in a common tool magazine and are shared among different machines through a material handling system. Each tool type is single in number. The problem has two interrelated problems; one as loading and scheduling of part and tool and other as scheduling of AGVs. Two heuristics namely priority dispatching rules (PDRs) and modified genetic algorithm (MGA) with three parent crossover are used to find the optimal solution to the integrated scheduling problem. Both PDRs and MGA use an algorithm based on the concept of Giffler and Thompson procedure and a heuristic approach to generate the active feasible schedule. The performance of the two proposed algorithm is compared for the results of makespan. It was found that the MGA gives better results.

Similar Papers
  • Research Article
  • Citations12

Integrated optimization of automated guided vehicles and yard cranes considering charging constraints

  • Nov 25, 2023
  • Engineering Optimization
  • Xiaoju Zhang +2
  • Research Article
  • Citations22

Practical simultaneous scheduling of machines, AGVs, tool transporter and tools in a multi machine FMS using symbiotic organisms search algorithm

  • Jan 18, 2021
  • International Journal of Computer Integrated Manufacturing
  • N Sivarami Reddy +3
  • Research Article
  • Citations36

Controlling the navigation of automatic guided vehicle (AGV) using integrated fuzzy logic controller with programmable logic controller (IFLPLC)—stage 1

  • Apr 03, 2009
  • The International Journal of Advanced Manufacturing Technology
  • Mehdi Yahyaei +2
  • Research Article
  • Citations18

Design and analysis of optimal material distribution policies in flexible manufacturing systems using a single AGV

  • Jan 01, 2002
  • International Journal of Production Research
  • Bharadwaj Veeravalli +2
  • Book Chapter
  • Citations6

An Intelligent Algorithm for AGV Scheduling in Intelligent Warehouses

  • Jan 01, 2021
  • Xue Wu +2
  • PDF
  • Research Article

Efficient Simulator Based on Meta-Heuristic for FMS and AGV Systems Design and Control

  • Jan 01, 2005
  • Journal of Computer Science
  • Slim Ben Saoud +2
  • Research Article
  • Citations26

The Selection of the Best Control Rule for a Multiple‐Load AGV System Using Simulation and Fuzzy MADM in a Flexible Manufacturing System

  • Jan 01, 2010
  • Modelling and Simulation in Engineering
  • Parham Azimi +2
  • Research Article
  • Citations48

Novel methodology for optimising the design, operation and maintenance of a multi-AGV system

  • Jun 03, 2018
  • Reliability Engineering & System Safety
  • Rundong Yan +2
  • PDF
  • Research Article
  • Citations25

A Hybrid Dynamic Method for Conflict-Free Integrated Schedule Optimization in U-Shaped Automated Container Terminals

  • Aug 25, 2022
  • Journal of Marine Science and Engineering
  • Bowei Xu +5
  • Research Article
  • Citations42

Intelligent agent framework to determine the optimal conflict-free path for an automated guided vehicles system

  • Jan 01, 2002
  • International Journal of Production Research
  • S P Singh +1
  • Conference Article
  • Citations16

A hybrid genetic-heuristic algorithm for scheduling of automated guided vehicles and quay cranes in automated container terminals

  • Jul 01, 2009
  • S.M Homayouni +4
  • Conference Article
  • Citations10

Multi-criteria Intelligent Dispatching Control of Automated Guided Vehicles in FMS

  • Jun 01, 2006
  • N Umashankar +1
  • Research Article
  • Citations15

Use of timed petri net and activity cycle diagram methodologies for modelling tandem AGVs in FMSs and their performance evaluation

  • Jan 01, 2001
  • International Journal of Computer Integrated Manufacturing
  • M K Tiwari +2
  • Research Article
  • Citations7

The application of Analytic Process of Resource in an AGV scheduling

  • Oct 01, 1998
  • Computers & Industrial Engineering
  • W.U Xiao Bing
  • Research Article
  • Citations1

AGV System with Dual Motor Drive by Distributed Control

  • Nov 15, 2005
  • Key Engineering Materials
  • Yon Sang Cho +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.