• Home
  • Search
  • Interactive Decomposition Multiobjective Optimization Via Progressively Learned Value Functions
  • Cite Icon60
  • https://doi.org/10.1109/tfuzz.2018.2880700Copy DOI Icon

Interactive Decomposition Multiobjective Optimization Via Progressively Learned Value Functions

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This is the author accepted manuscript. The final version is available from IEEE via the DOI in this record

Similar Papers
  • Research Article
  • Citations67

Does Preference Always Help? A Holistic Study on Preference-Based Evolutionary Multiobjective Optimization Using Reference Points

  • Dec 01, 2020
  • IEEE Transactions on Evolutionary Computation
  • Ke Li +4
  • Conference Article
  • Citations29

Progressively interactive evolutionary multi-objective optimization method using generalized polynomial value functions

  • Jul 01, 2010
  • Ankur Sinha +3
  • PDF
  • Research Article
  • Citations80

Integration of Preferences in Decomposition Multiobjective Optimization

  • Aug 20, 2018
  • IEEE Transactions on Cybernetics
  • Ke Li +3
  • Conference Article

Hyperheuristics for indirect elicitation of outranking model’s parameters in Project Portfolio Optimization

  • Jan 06, 2019
  • Nelson Rangel-Valdez +4
  • Research Article
  • Citations242

An Interactive Evolutionary Multiobjective Optimization Method Based on Progressively Approximated Value Functions

  • Oct 01, 2010
  • IEEE Transactions on Evolutionary Computation
  • Kalyanmoy Deb +3
  • Research Article
  • Citations36

A posterior preference articulation approach to dual-response-surface optimization

  • Nov 30, 2009
  • IIE Transactions
  • Dong-Hee Lee +2
  • Research Article
  • Citations3

IP‐MRSO: An iterative posterior preference articulation method to multiple response surface optimization

  • Apr 07, 2017
  • Quality and Reliability Engineering International
  • Dong‐Hee Lee +1
  • Research Article
  • Citations25

Two kinds of explicit preference information oriented capacity identification methods in the context of multicriteria decision analysis

  • Nov 01, 2017
  • International Transactions in Operational Research
  • Jian‐Zhang Wu +2
  • Book Chapter
  • Citations28

Progressive Preference Learning: Proof-of-Principle Results in MOEA/D

  • Jan 01, 2019
  • Ke Li
  • Research Article
  • Citations62

Fuzzy multiattribute decision-making models and methods with incomplete preference information

  • Aug 05, 1999
  • Fuzzy Sets and Systems
  • Dengfeng Li
  • Research Article
  • Citations72

PROJECTION METHOD FOR UNCERTAIN MULTI-ATTRIBUTE DECISION MAKING WITH PREFERENCE INFORMATION ON ALTERNATIVES

  • Sep 01, 2004
  • International Journal of Information Technology & Decision Making
  • Zeshui Xu +1
  • PDF
  • Conference Article

A review of some methods that incorporate decision-maker preferences in multi-objective evolutionary optimization using a multi-criteria classification method

  • Jan 14, 2019
  • Julia Patricia Sanchez-Solis +4
  • Research Article
  • Citations42

On decomposition methods in interactive user-preference based optimization

  • Oct 11, 2016
  • Applied Soft Computing
  • Jinhua Zheng +4
  • Research Article
  • Citations4

A many‐objective evolutionary algorithm incorporating decision maker's preference and its application to management of the electricity distribution network

  • May 01, 2019
  • Journal of Multi-Criteria Decision Analysis
  • Shinya Sekizaki +2
  • Conference Article
  • Citations5

On the Unbounded External Archive and Population Size in Preference-based Evolutionary Multi-objective Optimization Using a Reference Point

  • Jul 12, 2023
  • Ryoji Tanabe
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.