Intermittent Renewable Management Pilot Phase 2

  • Apr 1, 2015
  • Sila Kiliccote +3 more
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets. The customer had the option of committing to either three contiguous hour blocks for 24 days or six contiguous hours for 12 days a month with day-ahead notification that aligned with the CAISO integrated forward market. As a result of their being available, the customer was paid $10/ kilowatt (kW)-month for capacity in addition to CAISO energy settlements. The participants were limited to no more than a 2 megawatt (MW) capacity with a six-month commitment. Four participants successfully engaged in the pilot. In this report, we provide the description of the pilot, participant performance results, costs and value to participants as well as outline some of the issues encountered through the pilot. Results show that participants chose to participate with storage and the value of CAISO settlements were significantly lower than the capacity payments provided by the utility as incentive payments. In addition, this pilot revealed issues both on the participant side and system operations side. These issues are summarized in the report.The Intermittent Renewable Management Pilot - Phase 2 (IRM2) was designed to study the feasibility of demand-side resources to participate into the California Independent System Operator (CAISO) wholesale market as proxy demand resources (PDR). The pilot study focused on understanding the issues related with direct participation of third-parties and customers including customer acceptance; market transformation challenges (wholesale market, technology); technical and operational feasibility; and value to the rate payers, DR resource owners and the utility on providing an enabling mechanism for DR resources into the wholesale markets.

Similar Papers
  • Research Article
  • Citations13

Aggregating Distributed Energy Resources: Efficiency and Market Power

  • Mar 01, 2024
  • Manufacturing & Service Operations Management
  • Zuguang Gao +2
  • Single Report
  • Citations21

Demand Response Spinning Reserve Demonstration -- Phase 2 Findings from the Summer of 2008

  • Apr 30, 2009
  • Joseph H Eto +7
  • Research Article
  • Citations14

Robust bidding strategy for aggregation of distributed prosumers in flexiramp market

  • Apr 08, 2022
  • Electric Power Systems Research
  • Mohammad Khoshjahan +1
  • Single Report
  • Citations3

Providing Ramping Service with Wind to Enhance Power System Operational Flexibility

  • Mar 01, 2020
  • Xin Fang +5
  • Research Article
  • Citations30

California electric restructuring; a broad description of the development of the California ISO

  • Jan 01, 1998
  • IEEE Transactions on Power Systems
  • Z Alaywan +1
  • Conference Article
  • Citations5

Consideration of Hourly Flexible Ramping Products in Stochastic Day-Ahead Scheduling of Integrated Wind and Storage Systems

  • Nov 01, 2018
  • Mohammad Amin Mirzaei +3
  • Research Article
  • Citations28

Consolidated Dynamic Pricing of Power System Regulation

  • Nov 01, 2013
  • IEEE Transactions on Power Systems
  • Joshua A Taylor +3
  • Single Report

Comparison of CAISO-run Plexos output with LLNL-run Plexos output

  • Dec 20, 2011
  • A Schmidt +2
  • Conference Article
  • Citations20

New real time market applications at the California independent system operator (CAISO)

  • Oct 10, 2004
  • J Huang +4
  • Conference Article
  • Citations4

A comparative assessment of demand response and energy storage resource economic and emission impacts

  • Aug 01, 2013
  • Kai Van Horn +1
  • Single Report
  • Citations1

RAVIS: Resource Forecast and Ramp Visualization for Situational Awareness - An Introduction to the Open-Source Tool and Use Cases

  • May 01, 2021
  • Paul Edwards +2
  • Research Article
  • Citations7

A Coordinated Performance of Power System Operated with Participants in Demand Response Programs Considering Environmental Pollution Constraints

  • Oct 16, 2020
  • Journal of Electrical Engineering & Technology
  • Payam Qaderi-Baban +3
  • Supplementary Content

Decomposition Methods and NetworkDesign Problems

  • Apr 03, 2014
  • AMS Dottorato Institutional Doctoral Theses Repository (University of Bologna)
  • Tiziano Parriani
  • Single Report
  • Citations75

Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas

  • Jun 30, 2008
  • Yuri V Makarov +8
  • Conference Article
  • Citations5

Opportunities and Trends for Energy Storage Plus Solar in CAISO: 2014-2018

  • Aug 02, 2020
  • Raymond H Byrne +5
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.