Jackup Operations: New Operational Recommended Practices

  • Apr 30, 2007
  • W.p Hedrick +1 more
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Abstract The 2005 U.S. Gulf of Mexico hurricane season validated the industry's practice of "shut-in and evacuate". Successful application of this practice resulted in no fatalities or serious injuries as well as limited pollution events related to Jackup operations. However, infrastructure (hull) losses in regards to the Jackup fleet were unprecedented and demanded operational alterations by industry in advance of the 2006 hurricane season. Prior to the 2006 Hurricane Season, Jackup owner/operators did not have a consensus on a recommended practice or specification document to utilize in order to adhere to minimum operational requirements to mitigate hurricane damage. The International Association of Drilling Contractors' (IADC) Jackup Rig Committee has been diligently engaged in producing the Gulf of Mexico Annex to the Society of Naval Architects and Marine Engineers' (SNAME) Technical and Research Bulletin 5-5A, Guidelines for Site Specific Assessment of Mobile Jack-up Units [1]. The committee was not at a stage where scientific studies had been completed and a consensus had not been achieved, consequently the document was not available for general use. Because of this, an interim operational-based solution was necessary. Shortly after the conclusion of the 2005 hurricane season, industry met with its government partners, Minerals Management Service (MMS) and U.S. Coast Guard to preliminarily determine the primary causes of the losses, the impact on the fleet population and to assess opportunities for performance improvement in advance of the 2006 Gulf of Mexico hurricane season. This strategic partnership led to the development of API Recommended Practice (RP) 95J, Interim Guidance for Jackup Operations in the Gulf of Mexico During Hurricane Season [2]. Use of the RP essentially became mandatory as the MMS adopted the operational recommendations and promulgated its Notice to Lessees (NTL) No. 2006-G09 [3] in advance of the 2006 hurricane season. The results of the operational alterations have not been tested as the 2006 Gulf of Mexico hurricane season was unusually mild. MMS has advised industry that it intends on reissuing the NTL in same or similar form for the 2007 Gulf of Mexico hurricane season. Introduction As reflected in Figure 1, hurricanes Katrina and Rita severely impacted the Central Gulf of Mexico, which contained much of this nation's offshore energy infrastructure, including the majority of the domestic Jackup fleet. Historically, Jackup operators have sustained minimal hull losses due to hurricanes. Between 1992 and 2005, three (3) units lost stationkeeping in Gulf of Mexico hurricanes. In recent years, deeper prospects, increased drilling rig demands, customer demands, and jackup water depth working capacity have placed units in deeper water depths throughout the Gulf of Mexico area. In retrospect, this trend, in certain instances, placed jackups at or near their maximum water depth capacity and outdated metocean criteria, contributed to the loss of stationkeeping of eight (8) such units during the 2005 hurricane season. Preliminary analysis of the losses to the Jackup fleet and those units that survived indicates the likely causes to be wave inundation and/or foundation failure leading to hull wave inundation.

Similar Papers
  • Conference Article
  • Citations10

A Comparative Risk Analysis of FPSO's with Other Deepwater Production Systems in the Gulf of Mexico

  • Apr 30, 2001
  • R.B Gilbert +2
  • Conference Article

The Future of Regulations for the Deepwater GOM

  • May 06, 1996
  • J Regg +3
  • Conference Article
  • Citations8

Fixed Platform Performance During Recent Hurricanes: Comparison to Design Standards

  • Apr 30, 2007
  • Peter Maxwell +2
  • Conference Article
  • Citations3

An Overview of API RP 75 and RP 14J

  • May 01, 1995
  • P.K Velez +2
  • Conference Article
  • Citations19

Small-Scale Testing of Damaged Synthetic Fiber Mooring Ropes

  • May 06, 2002
  • Jerry G Williams +3
  • Research Article

MODU Performance in Hurricane Ivan

  • Apr 01, 2007
  • Journal of Petroleum Technology
  • Karen Bybee
  • Conference Article
  • Citations1

Deepwater Environmental Concerns

  • May 04, 1998
  • Robert P Labelle
  • Conference Article
  • Citations13

Development of Revised Gulf of Mexico Metocean Hurricane Conditions for Reference by API Recommended Practices

  • Apr 30, 2007
  • E.P Berek +6
  • Conference Article
  • Citations11

Design And Installation Of Auger Pipelines

  • May 02, 1994
  • Frans Kopp +1
  • Conference Article

The Evolving Regulatory Scheme Applicable to Offshore Renewable Energy Facilities in the United States

  • May 02, 2011
  • William Houston Daughdrill +1
  • Research Article
  • Citations24

Dynamic Regionalization of the Gulf of Mexico based on normalized radiances (nLw) derived from MODIS-Aqua

  • Feb 17, 2012
  • Continental Shelf Research
  • Mariana Callejas-Jimenez +4
  • Research Article
  • Citations1

MMS acoustic studies in the Gulf of Mexico, FY 2000

  • Aug 01, 2000
  • The Leading Edge
  • William Lang
  • Research Article

Deepwater Gulf of Mexico and the MMS

  • Apr 01, 1999
  • The Leading Edge
  • Jim Regg
  • Conference Article
  • Citations20

Gulf of Mexico Gas Hydrate Joint Industry Project Leg II: LWD Logging Program Design, Data Acquisition and Evaluation

  • May 03, 2010
  • Stefan Mrozewski +6
  • Conference Article
  • Citations3

Operator's Perspective on Gulf of Mexico Jackup MODU Designs

  • Apr 27, 1987
  • M.L Payne +6
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.