Job-shop scheduling: limits of the binary disjunctive formulation

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

SUMMARY The deterministic job-shop scheduling problem exhibits the fundamental computational difficulty implicit in determining an optimal timetable for sharing production resources among competing production activities. While adaptation of the formal model to industrial practice is fraught with difficulties, we show that the underlying binary-disjunctive formulation itself is more robust than might be immediately apparent. Straightforward extensions of the underlying model are sufficient to capture such practical problem features as assembly and disassembly sequences, due-dates and out-processing operations, scheduled maintenance, nonzero release times and dispatch operations, certain sequence-dependent set-ups and materials handling delays, and a great range of operational side-constraints. Technological sequences need not be total orders, job priorities can be assigned explicitly or implicitly, and any regular measure of performance can be represented. The principal structural limitation is that machin...

Similar Papers
  • Book Chapter
  • Citations15

A New Approach for Product Design by Integrating Assembly and Disassembly Sequence Structure Planning

  • Jan 01, 2015
  • Samyeon Kim +3
  • Single Report
  • Citations10

Assembly sequencing with toleranced parts

  • Feb 21, 1995
  • J.C Latombe +1
  • Research Article
  • Citations86

Using Genetic Algorithms and Heuristics for Job Shop Scheduling with Sequence-Dependent Setup Times

  • Oct 01, 2001
  • Annals of Operations Research
  • Waiman Cheung +1
  • Research Article
  • Citations15

Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups

  • Jan 01, 2007
  • European J. of Industrial Engineering
  • Xuefeng Yu +2
  • Conference Article

SCHEDULING OPTIMIZATION IN AN ACTUAL JOB-SHOP

  • Jan 01, 2023
  • C Sheahan +2
  • Book Chapter
  • Citations10

A Heuristic Rule-Based Approach for Dynamic Scheduling of Flexible Manufacturing Systems

  • Dec 01, 2007
  • Gonca Tuncel
  • PDF
  • Research Article

Research Method of Assembly Sequence Planning Based on Assembly Constraint Relationship Analysis

  • Jan 01, 2018
  • MATEC Web of Conferences
  • Yang Yi +4
  • Book Chapter
  • Citations7

A Job-Shop Scheduling Problem with Fuzzy Processing Times

  • Jan 01, 2001
  • Feng-Tse Lin
  • PDF
  • Research Article
  • Citations60

Assembly and Disassembly Planning by using Fuzzy Logic & Genetic Algorithms

  • Jun 01, 2004
  • International Journal of Advanced Robotic Systems
  • L M Galantucci +2
  • Research Article
  • Citations5

回転機能部品の部品展開手法に関する研究(第2報)

  • Jan 01, 1987
  • Journal of the Japan Society for Precision Engineering
  • Hiroshi Sekiguchi +3
  • Conference Article
  • Citations3

A Comparative Study of Genetic Algorithms for Integrated Predictive Maintenance and Job Shop Scheduling

  • Jan 01, 2023
  • Book Chapter

Preventive Maintenance and Job Shop Scheduling: An Approach to React to Unplanned Events and Minimizing Unused Time Slots in Production Control

  • Jan 01, 2025
  • Alexandra Maierhofer +2
  • Research Article

Risk-Constrained Optimization Framework for Generation and Transmission Maintenance Scheduling Under Economic and Carbon Emission Constraints

  • Dec 30, 2025
  • Energies
  • Huihang Li +7
  • PDF
  • Research Article
  • Citations25

Cap-dependent translation initiation monitored in living cells

  • Nov 02, 2022
  • Nature Communications
  • Valentina Gandin +7
  • Research Article

Deterministic job-shop scheduling problems with capacity focus

  • Mar 01, 1993
  • Computing
  • W K Heuser
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.