• Home
  • Search
  • Key Indicators for Linguistic Action Perspective in the Last Planner® System
  • Cite Icon12
  • https://doi.org/10.3390/su12208728Copy DOI Icon

Key Indicators for Linguistic Action Perspective in the Last Planner® System

Show More
  • Abstract
  • Highlights & Summary
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Since 2001, a link has been established between the Last Planner® System (LPS) and Linguistic Action Perspective (LAP). However, to date, it has not been studied in sufficient depth. This research developed a system of indicators to measure and control the management of commitments, through the Design Science Research (DSR) methodology, and thus contribute to the development of the social dimension of sustainability that is often neglected in construction management research. The main contributions of this paper are a proposal of five main activities to apply the DSR method, a checklist to analyze the engagement of meeting participants, a notebook for last planners, delve into the variations that can occur to the basic movements of LAP, and the creation of a system of indicators hence updating the Percent Plan Complete (PPC) with a reliability indicator. The main limitation of this research is that the system was only validated in two South American countries that implemented LPS. In future studies, we propose to apply case studies in weekly planning meetings in other industries worldwide and to determine the recommended values to improve communication and achieve the proper implementation of LAP with LPS and without LPS.

Similar Papers
  • Research Article
  • Citations1

Integrating lean production and agile project management: a planning and control model for multi-project environments in construction

  • Oct 17, 2024
  • International Journal of Construction Management
  • Douglas Comassetto Hamerski +2
  • Research Article
  • Citations7

Enhancing medical radiation science education through a design science research methodology

  • Mar 05, 2021
  • Journal of Medical Imaging and Radiation Sciences
  • Sibusiso Mdletshe +2
  • Conference Article
  • Citations6

Design Science Research Methodology and Its Application to Developing a New Timetabling Algorithm

  • Jun 16, 2022
  • I Gusti Agung Premananda +2
  • Research Article
  • Citations7

Design science research in construction management: multi-disciplinary collaboration on the SightPlan system

  • Feb 03, 2020
  • Construction Management and Economics
  • Iris D Tommelein
  • Research Article

A Cloud Implementation Assessment System for SMEs

  • Oct 30, 2025
  • Asian Journal of Research in Computer Science
  • Jesse Atuah +4
  • PDF
  • Research Article
  • Citations9

Design Science Research Framework for Performance Analysis Using Machine Learning Techniques

  • Aug 11, 2022
  • Electronics
  • Mihaela Muntean +1
  • Research Article
  • Citations2

Optimization of purchasing business process in Moroccan public universities based on COBIT and artificial intelligence techniques

  • Feb 20, 2023
  • Kybernetes
  • Zakaria Sakyoud +2
  • PDF
  • Research Article
  • Citations6

Augmented Reality Applied to Identify Aromatic Herbs Using Mobile Devices

  • Aug 13, 2024
  • AgriEngineering
  • William Aparecido Celestino Lopes +6
  • Research Article
  • Citations5

Measuring the digital transformation maturity level independently with the design science research methodology

  • Aug 09, 2023
  • Systems Engineering
  • Tining Haryanti +2
  • Book Chapter
  • Citations5

Detailed Design Science Research and Its Impact on the Quality of Design Artefacts

  • Jan 01, 2012
  • Łukasz Ostrowski
  • Book Chapter
  • Citations3

Using Design Science Research to Develop a Modeling Technique for Service Design

  • Jan 01, 2012
  • Lysanne Lessard +1
  • Research Article

Improving course evaluation processes in higher education institutions: a modular system approach

  • Aug 28, 2025
  • PeerJ Computer Science
  • İlker Kocaoğlu +1
  • Research Article
  • Citations6

Towards design theory for community collaboration support system during crises: from conceptualisation to validation

  • May 05, 2024
  • Journal of Decision Systems
  • Alexander Nejinski +1
  • Research Article

A Framework of IT Governance for Higher Educational Institutions in the Philippines Amid and Beyond COVID-19 Pandemic

  • May 08, 2022
  • International Journal of Emerging Trends in Engineering Research
  • Jessevim R Galeon
  • Research Article
  • Citations15

Practical assessment of the nature of business processes

  • Feb 25, 2021
  • Information Systems and e-Business Management
  • Marek Szelągowski
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.