Abstract

The maintenance of any system can be categorized in two ways: failure based maintenance (corrective maintenance) and life based maintenance (preventive maintenance). The time interval at which the preventive maintenance could be scheduled is dependent on both the life distribution of the subsystems/components and the total cost involved in the maintenance activity. However, the corrective maintenance cannot be avoided when a random failure of a component occurs. The total cost of the maintenance depends on the number of components replaced during the entire operating period of the system and the respective cost involved in maintenance actions. In this paper the preventive maintenance schedule (t/sub 0/) is calculated taking the failure distribution of a component as Weibull. The variation in (t/sub 0/) with respect to the shape parameter (/spl beta/) and characteristic life (/spl alpha/) of the Weibull distribution was studied by the author for a given preventive maintenance cost and corrective maintenance cost. The ratio of the corrective maintenance cost to the preventive maintenance cost (R/sub cp/) has a significant effect on the maintenance schedule (t/sub 0/). Thus the variation of (t/sub 0/) with (R/sub cp/) is addressed in this paper. The ratio is varied between 10 and 1.5. It is found that the (t/sub 0/) value increases as shape parameter increases when the ratio is 10 whereas the (to) value decreases when the ratio is 1.5. This shows that as we decrease the cost ratio (R/sub cp/) the frequency of preventive maintenance decreases with shape parameter. This in turn implies that the frequency of the preventive maintenance schedule can be kept at minimum by bringing down the cost of corrective maintenance. Sensitivity analysis carried out on the (t/sub 0/) values indicates that the variation in the cost of maintenance is about 5 to 8 percent :in all the cases even when the value of (t/sub 0/) is increased. by 50% over the optimum value. This indicates, while the optimum value of (to) obtained may be of academic interest, one can 'in practice' choose a convenient value near the optimum without appreciably affecting the advantage in terms of cost.

Similar Papers
  • PDF
  • Research Article
  • Citations5

Jet Engine Optimal Preventive Maintenance Scheduling Using Golden Section Search and Genetic Algorithm

  • Jul 13, 2022
  • Journal of Prognostics and Health Management
  • Sajad Saraygord Afshari +4
  • Research Article
  • Citations2

An integrated optimization framework for multi-cycle environmental stress screening tests and preventive maintenance scheduling

  • Sep 28, 2016
  • Proceedings of the Institution of Mechanical Engineers, Part E: Journal of Process Mechanical Engineering
  • Ming-Yi You
  • Research Article
  • Citations21

Analysis of maintenance cost for an asset using the genetic algorithm

  • Mar 26, 2016
  • International Journal of System Assurance Engineering and Management
  • Mohammad Asjad +1
  • Research Article

Two-stage maintenance of a production system with exponentially distributed On- and Off-periods

  • Jan 10, 1998
  • International Transactions in Operational Research
  • Gerhard Van Dijkhuizen +1
  • PDF
  • Book Chapter
  • Citations14

Definition of Maintenance and Maintenance Types with Due Care on Preventive Maintenance

  • Apr 05, 2023
  • Hikmet Erbiyik
  • Research Article
  • Citations17

Opportunistic preventive maintenance scheduling for multi-unit reusable rocket engine system based on the variable maintenance task window method

  • Jan 14, 2022
  • Aerospace Science and Technology
  • Ping Jin +4
  • Research Article
  • Citations18

An approach for evaluating preventive maintenance scheduling cost

  • Aug 01, 2006
  • International Journal of Quality & Reliability Management
  • S.A Oke +1
  • Research Article
  • Citations8

Maintenance class-based cost-effective preventive maintenance scheduling of coal-fired power plants

  • Jan 01, 2013
  • International Journal of Reliability and Safety
  • Debasis Das Adhikary +3
  • Research Article
  • Citations1

ANALISIS PEMELIHARAAN MESIN RIDGER PALIR DI PT GREAT GIANT PINEAPPLE

  • Mar 01, 2018
  • Industrika: Jurnal Ilmiah Teknik Industri
  • Burhan Nudin
  • Research Article
  • Citations24

(s,Q) Spare Parts Provisioning Strategy for Periodically Replaced Systems

  • Mar 01, 2008
  • IEEE Transactions on Reliability
  • C Diallo +2
  • Conference Article

Integrated Scheduling of Maintenance Workers and Activities for Nuclear Power Plant Subsystem

  • Oct 01, 2018
  • Mengyu Du +2
  • Conference Article
  • Citations7

Outage performance improvement by Preventive Maintenance optimization

  • Jan 01, 2012
  • Teresa E Tutt +3
  • Research Article
  • Citations1

Maintenance Avoidance and Maintenance Reduction

  • Jan 01, 1997
  • Naval Engineers Journal
  • K S Jacobs +1
  • Research Article

Integrated Maintenance Methodologies for Energy Sector Facilities: Bridging Predictive, Preventive, and Corrective Approaches

  • Jan 01, 2023
  • International Journal of Artificial Intelligence Engineering and Transformation
  • Godwin Uchechukwu Uke
  • Conference Article

Evaluation of demand side behaviors in cost-emission based PM scheduling under restructured environment

  • May 01, 2016
  • Mojgan Mollahassani-Pour +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.