  • Logic-based Benders Decomposition for Alternative Resource Scheduling with Sequence Dependent Setups
  • Cite Icon33
  • https://doi.org/10.3233/978-1-61499-098-7-774Copy DOI Icon

Logic-based Benders Decomposition for Alternative Resource Scheduling with Sequence Dependent Setups

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

We study an unrelated parallel machines scheduling problem with sequence and machine dependent setup times. A logic-based Benders decomposition approach is proposed to minimize the makespan. This approach is a hybrid model that makes use of a mixed integer programming master problem and a specialized solver for travelling salesman subproblems. The master problem is used to assign jobs to machines while the subproblems obtain optimal schedules on each machine given the master problem assignments. Computational results show that the Benders model is able to find optimal solutions up to six orders of magnitude faster as well as solving problems six times the size previously possible with a mixed integer programming model in the literature and twice the size that a branchand-bound algorithm can solve for similar problems. We further relax the Benders decomposition to accept suboptimal schedules and demonstrate the ability to parameterize solution quality while out-performing state-of-the-art metaheuristics both in terms of solution quality and mean run-time.

Similar Papers
  • Research Article
  • Citations15

Unrelated parallel machine scheduling problem with special controllable processing times and setups

  • Aug 12, 2022
  • Computers & Operations Research
  • Shijin Wang +3
  • Conference Article
  • Citations13

Scheduling a two-stage hybrid flow shop with dedicated machines, time lags and sequence-dependent family setup times

  • Oct 01, 2016
  • H Harbaoui +2
  • Research Article
  • Citations101

Joint rolling-horizon scheduling of materials processing and lot-sizing with sequence-dependent setups

  • Apr 27, 2007
  • Journal of Heuristics
  • Silvio A De Araujo +2
  • PDF
  • Research Article
  • Citations3

Minimizing the Total Weighted Completion Time of a Single Machine With Flexible Maintenance

  • Jan 01, 2019
  • IEEE Access
  • Shenquan Huang +4
  • Research Article
  • Citations25

MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups

  • Apr 29, 2009
  • International Journal of Production Research
  • M Mohammadi +3
  • Research Article
  • Citations28

Critical-Path-Search Logic-Based Benders Decomposition Approaches for Flexible Job Shop Scheduling

  • Aug 02, 2021
  • INFORMS Journal on Optimization
  • Bahman Naderi +1
  • Research Article
  • Citations37

A cutting plane algorithm for the site layout planning problem with travel barriers

  • Jan 16, 2017
  • Computers & Operations Research
  • Ahmed W.A Hammad +2
  • Research Article
  • Citations8

Bi-objective unrelated parallel machines scheduling problem with worker allocation and sequence dependent setup times considering machine eligibility and precedence constraints

  • Jan 01, 2023
  • Journal of Industrial and Management Optimization
  • Reza Alizadeh Foroutan +2
  • Book Chapter

Scheduling Jobs with Sequence Dependent Setups on Coupled Lines

  • Jan 01, 1998
  • E C Sewell +1
  • Research Article

Evacuation network design under road capacity improvement and uncertainty: second-order cone programming reformulations and Benders decomposition

  • Apr 01, 2025
  • European Journal of Operational Research
  • Qing-Mi Hu +3
  • Research Article
  • Citations51

Capacitated lot sizing and sequence dependent setup scheduling: an iterative approach for integration

  • Dec 23, 2009
  • Journal of Scheduling
  • Geraldo R Mateus +3
  • Research Article
  • Citations10

Rolling horizon-based heuristics for solving a production-routing problem with price-dependent demand

  • Aug 01, 2022
  • Computers & Operations Research
  • Somayeh Torkaman +3
  • Research Article

Multi-agent scheduling models and methods for manufacturing as a service systems

  • Feb 28, 2026
  • International Journal of Production Research
  • Ege Duran +2
  • Conference Article
  • Citations1

Scheduling policies in multi-product manufacturing systems with sequence-dependent setup times

  • Dec 01, 2011
  • Wei Feng +2
  • Research Article
  • Citations6

Determining ideal fabric cutting times for apparel manufacturing by using mixed integer programming and a heuristic method

  • Jan 01, 2014
  • European J. of Industrial Engineering
  • Yi Feng Hung +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.