• Home
  • Search
  • Modeling and solving for bi-objective cutting parallel machine scheduling problem
  • Cite Icon20
  • https://doi.org/10.1007/s10479-019-03208-zCopy DOI Icon

Modeling and solving for bi-objective cutting parallel machine scheduling problem

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper addresses a bi-objective cutting parallel machine scheduling problem aiming to minimize the total makespan and total tardiness. This problem is inspired from a structural metal-cutting plant that combines identical and unrelated parallel machine scheduling problems. To formulate this complicated problem, a new mixed-integer programming (MIP) model is presented in consideration of total makespan and total tardiness. The machine-job-dependent processing times are considered along with the setup times, pickup times, different delivery times, and machine eligibility constraints. Owing to the complex characteristics of the problem, an appropriate non-dominated sorting Genetic Algorithm III (NSGAIII) with an embedded variable neighborhood structure strategy (VNSGAIII) is developed. A number of randomly generated datasets are used to test the performance of VNSGAIII in comparison with NSGAII, and NSGAIII on solving the engineering problem addressed herein. The experimental results demonstrate that the suggested VNSGAIII statistically outperforms the compared algorithms, especially in the distribution of Pareto solutions. The e-constrained method is implemented in the direct MIP model by CPLEX for comparison with the proposed evolutionary algorithms. The proposed algorithm performs efficiently when obtaining the Pareto solutions.

Similar Papers
  • Research Article

Identical Parallel Machine Scheduling Problem with Additional Resources and Partial Confirmed Orders in Make-to-Stock Strategy

  • Aug 01, 2024
  • Applied Sciences
  • Yiyo Kuo +1
  • Research Article
  • Citations15

Unrelated parallel machine scheduling problem with special controllable processing times and setups

  • Aug 12, 2022
  • Computers & Operations Research
  • Shijin Wang +3
  • Book Chapter
  • Citations2

Identical Parallel-Machine Scheduling and Worker Assignment Problem Using Genetic Algorithms to Minimize Makespan

  • Jan 01, 2011
  • Imran Ali Chaudhry +1
  • Research Article
  • Citations122

Reformulations and an exact algorithm for unrelated parallel machine scheduling problems with setup times

  • Aug 08, 2018
  • Computers & Operations Research
  • Luis Fanjul-Peyro +2
  • PDF
  • Research Article
  • Citations53

Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times

  • Jul 05, 2018
  • PLoS ONE
  • Absalom E Ezugwu +2
  • Research Article
  • Citations8

Bi-objective unrelated parallel machines scheduling problem with worker allocation and sequence dependent setup times considering machine eligibility and precedence constraints

  • Jan 01, 2023
  • Journal of Industrial and Management Optimization
  • Reza Alizadeh Foroutan +2
  • Research Article
  • Citations9

Many-objective flexible job shop scheduling using NSGA-III combined with multi-attribute decision making

  • Dec 30, 2018
  • Modern Physics Letters B
  • Chun Wang +2
  • Research Article
  • Citations8

An imperialist competitive algorithm for a bi-objective parallel machine scheduling problem with load balancing consideration

  • Apr 01, 2013
  • international journal of industrial engineering computations
  • Mansooreh Madani-Isfahani +4
  • Dissertation

Hybrid Ant Colony Optimization For Fuzzy Unrelated Parallel Machine Scheduling Problems

  • Apr 04, 2016
  • Po An Su
  • Research Article
  • Citations26

A scatter search algorithm with a novel solution representation for flexible open shop scheduling: a multi-objective optimization

  • Apr 20, 2021
  • The Journal of Supercomputing
  • J Behnamian +2
  • PDF
  • Research Article
  • Citations3

An Evolutionary Variable Neighbourhood Search for the Unrelated Parallel Machine Scheduling Problem

  • Jan 01, 2021
  • IEEE Access
  • Salwani Abdullah +3
  • Conference Article
  • Citations2

Energy- and Cost-Aware Scheduling for Task- Dependency Applications in Mobile Edge Computing

  • May 04, 2022
  • Qinghua Zhu +2
  • PDF
  • Research Article
  • Citations9

Improved firefly algorithm with courtship learning for unrelated parallel machine scheduling problem with sequence-dependent setup times

  • Mar 12, 2022
  • Journal of Cloud Computing
  • Xingwang Huang +5
  • Research Article
  • Citations46

A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times

  • Mar 06, 2015
  • Applied Mathematical Modelling
  • Esmaeil Mehdizadeh +2
  • Research Article
  • Citations40

An artificial bee colony algorithm approach for unrelated parallel machine scheduling with processing set restrictions, job sequence-dependent setup times, and due date

  • Nov 30, 2014
  • The International Journal of Advanced Manufacturing Technology
  • Erdal Caniyilmaz +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.