• Home
  • Search
  • Modelling critical risk factors for Indian construction project using interpretive ranking process (IRP) and system dynamics (SD)
  • Cite Icon44
  • https://doi.org/10.1108/ijqrm-09-2015-0140Copy DOI Icon

Modelling critical risk factors for Indian construction project using interpretive ranking process (IRP) and system dynamics (SD)

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

PurposeThe purpose of this paper is to employ an integrated approach of interpretive ranking process (IRP) and system dynamics (SD) for modelling the key risk factors for a typical construction project.Design/methodology/approachThe risk parameters and performance measures applicable in the construction industry have been identified through extensive literature review and discussions with experts from the construction industry. Based on the literature review, a questionnaire was designed and 64 responses were considered. The list of 20 risk parameters and 32 performance measures relevant for a construction industry is reduced to five risk factors and five performance measure factors using factor analysis. IRP modelling is employed to examine the contextual relationships among risk factors and to rank them with respect to performance measure factors. Subsequently, the results of IRP model were utilised as inputs to SD analysis. The SD analysis is conducted for two models, namely, risk factor model and risk variable model to understand the impact of interventions offered by project management team on risk reduction and mitigation.FindingsThe developed IRP model shows that the risk factor dimension “construction management” has a high likeliness to occur during the construction phase.Research limitations/implicationsThe research demonstrates an application of proposed approach for a typical construction environment and hence the results cannot be generalised.Originality/valueThis research addresses real life complexities in construction project by modelling critical risk factors using an integrate approach of IRP and SD. The proposed approach would facilitate project managers to devise appropriate risk mitigation strategies for a construction project.

Similar Papers
  • Book Chapter

Suggestions for implementing geotechnical risk management

  • Jun 01, 2009
  • Martin Th Van Staveren
  • Research Article
  • Citations1

Critical success factors of lean manufacturing for Indian ceramic industries: Modelling through interpretive ranking process

  • Jan 01, 2021
  • Indian Journal of Engineering and Materials Sciences
  • Jagdish Bhadu +2
  • Research Article
  • Citations40

Analysis of barriers of cyber-physical system adoption in small and medium enterprises using interpretive ranking process

  • Oct 11, 2021
  • International Journal of Quality & Reliability Management
  • Vishal Ashok Wankhede +1
  • Research Article
  • Citations2

Mitigation Approach for Significant Causes of Contractor’s Delays in Construction Projects in Sri Lanka

  • Sep 29, 2021
  • Proceedings of International Conference on Business Management
  • P Tharsan +2
  • Research Article
  • Citations53

Theoretical review on critical risk factors in oil and gas construction projects in Yemen

  • Jul 30, 2020
  • Engineering, Construction and Architectural Management
  • Mukhtar A Kassem +2
  • Research Article
  • Citations45

Selection and evaluation of third party logistics service provider (3PLSP) by using an interpretive ranking process (IRP)

  • Aug 07, 2017
  • Benchmarking: An International Journal
  • Balkrishna Eknath Narkhede +4
  • Research Article

Exploring the Mitigation Actions of the Epidemic Impacts on Construction Projects in the Kingdom of Saudi Arabia

  • Jul 26, 2024
  • The Open Civil Engineering Journal
  • Abdullah M Abdullatif +3
  • Research Article
  • Citations6

Factors influencing municipal construction project performance

  • Jun 01, 2014
  • Proceedings of the Institution of Civil Engineers - Municipal Engineer
  • Saleh Alsulamy +2
  • Research Article
  • Citations4

Effect of SCF on automobile industry performance during sales promotional schemes

  • Aug 25, 2020
  • International Journal of Productivity and Performance Management
  • Sricharan Chirra +1
  • PDF
  • Research Article

Project management of constructions by stakeholders in the event of opposition uncertainty

  • Dec 29, 2018
  • Bulletin of the National Technical University «KhPI» Series: New solutions in modern technologies
  • Iraida Stanovska +1
  • Research Article
  • Citations361

Developing project management competency: perspectives from the construction industry

  • Mar 13, 2000
  • International Journal of Project Management
  • F.T Edum-Fotwe +1
  • Research Article

NEURO-LINGUISTIC PROGRAMMING IN THE PROFESSIONAL COMMUNICATION OF A CONSTRUCTION AND ARCHITECTURE PROJECT MANAGER

  • May 15, 2025
  • MODELING THE DEVELOPMENT OF THE ECONOMIC SYSTEMS
  • Anastasiia Mykhalko +2
  • Research Article
  • Citations32

Critical project management success factors analysis for the construction industry of Bangladesh

  • Jan 31, 2023
  • International Journal of Building Pathology and Adaptation
  • Shuvo Dip Datta +7
  • Research Article
  • Citations25

Interpretive multi-criteria ranking of production systems with ordinal weights and transitive dominance relationships

  • Jun 20, 2018
  • Annals of Operations Research
  • Sushil
  • Conference Article

A Bibliometric Review of Disputes in The Construction Projects

  • Jan 01, 2024
  • Aynur Hurriyet Turkyilmaz +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.