• Home
  • Search
  • Multi-objective flexible job shop scheduling problem using variable neighborhood evolutionary algorithm
  • Cite Icon11
  • https://doi.org/10.1142/s0217984917400723Copy DOI Icon

Multi-objective flexible job shop scheduling problem using variable neighborhood evolutionary algorithm

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

In this paper, multi-objective flexible job shop scheduling problem (MOFJSP) was studied with the objects to minimize makespan, total workload and critical workload. A variable neighborhood evolutionary algorithm (VNEA) was proposed to obtain a set of Pareto optimal solutions. First, two novel crowded operators in terms of the decision space and object space were proposed, and they were respectively used in mating selection and environmental selection. Then, two well-designed neighborhood structures were used in local search, which consider the problem characteristics and can hold fast convergence. Finally, extensive comparison was carried out with the state-of-the-art methods specially presented for solving MOFJSP on well-known benchmark instances. The results show that the proposed VNEA is more effective than other algorithms in solving MOFJSP.

Similar Papers
  • Conference Article
  • Citations1

A hybrid Pareto-based local search for multi-objective flexible job shop scheduling problem

  • Jul 01, 2010
  • Junqing Li +1
  • Conference Article
  • Citations13

Multi-objective Flexible Job Shop Scheduling Problem Based on Monte-Carlo Tree Search

  • Dec 01, 2013
  • Tung-Ying Wu +2
  • Research Article
  • Citations10

A Pareto archive floating search procedure for solving multi-objective flexible job shop scheduling problem

  • Jan 01, 2014
  • Decision Science Letters
  • J S Sadaghiani +3
  • Research Article
  • Citations72

Particle swarm optimization algorithm embedded with maximum deviation theory for solving multi-objective flexible job shop scheduling problem

  • Nov 17, 2015
  • The International Journal of Advanced Manufacturing Technology
  • Manas Ranjan Singh +3
  • Research Article
  • Citations45

A hybrid Pareto-based local search algorithm for multi-objective flexible job shop scheduling problems

  • Feb 15, 2012
  • International Journal of Production Research
  • Jun-Qing Li +2
  • Conference Article
  • Citations5

Improved nondominated sorting genetic algorithm-II for bi-objective flexible job-shop scheduling problem

  • Dec 01, 2020
  • Shu Luo +2
  • Conference Article
  • Citations6

Multi-objective flexible job shop scheduling problem using differential evolution algorithm

  • Jul 01, 2017
  • Yang Cao +2
  • Research Article
  • Citations73

Using multiple objective tabu search and grammars to model and solve multi-objective flexible job shop scheduling problems

  • Dec 01, 2004
  • Journal of Intelligent Manufacturing
  • Adl Baykasoğlu +2
  • Research Article
  • Citations102

An efficient evolutionary grey wolf optimizer for multi-objective flexible job shop scheduling problem with hierarchical job precedence constraints

  • Jan 09, 2020
  • Computers & Industrial Engineering
  • Zhenwei Zhu +1
  • Conference Article
  • Citations6

A Modified Invasive Weed Optimization Algorithm for MultiObjective Flexible Jobe Shop Scheduling Problems

  • Nov 07, 2014
  • Souad Mekni +1
  • Research Article
  • Citations6

An evolutionary algorithm for the multi-objective flexible job shop scheduling problem with uncertain processing time

  • Apr 01, 2023
  • SCIENTIA SINICA Informationis
  • 小玉 钟 +4
  • Research Article
  • Citations37

Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time

  • Jan 10, 2009
  • Annals of Operations Research
  • Jacomine Grobler +3
  • Research Article
  • Citations8

A hybrid particle swarm optimisation for multi-objective flexible job-shop scheduling problem with dual-resources constrained

  • Jan 01, 2017
  • International Journal of Computing Science and Mathematics
  • Wanliang Wang +3
  • Conference Article
  • Citations1

Multi-objective Flexible Job Shop Schedule Based on Ant Colony Algorithm

  • Aug 01, 2015
  • Jiang Xuesong +1
  • Research Article
  • Citations26

NSGA-II applied to dynamic flexible job shop scheduling problems with machine breakdown

  • Dec 30, 2018
  • Modern Physics Letters B
  • Chao Chen +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.