Multistage Fracturing System: Improving Operational Efficiency and Production

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Abstract Over the last several years there have been many technical developments in horizontal completion methods. These developments have been designed to better stimulate the entire horizontal interval. For cased and cemented applications, composite plugs have provided the ability to segment the horizontal wellbore into sections and divert the stimulation as designed. However, the process of setting a plug on coiled tubing (CT), perforating, stimulating and then repeating the process for the required number of stages to optimize production and then running back in with CT to remove the plugs can take weeks to complete. For open hole applications, horizontal stimulations have relied solely on bullheading in stages in an attempt to generate multiple fractures. This has proven in many cases to only stimulate certain sections of the wellbore leaving much of the horizontal section unstimulated. A new completion system has been deployed in over 300 wellbores in various producing formations, such as sandstone, limestone, shale, dolomite and coal. This system uses a series of mechanical open hole packers deployed on the production liner with fracturing or stimulation ports located between the packers that allow for stimulation in each desired interval. Without the requirement of cementing the liner in place, all the problematic issues associated with cementing are eliminated. Additionally, the use of mechanical packers provides positive mechanical diversion at high differential fracturing pressures. The system has also been designed, so all of the fracturing or stimulation treatments along the horizontal wellbore can be pumped in one continuous operation, thus minimizing the associated risks and optimizing the efficiencies of both the personnel and equipment needed to perform the work. This paper will detail the operational efficiencies and reliability of this novel completion system, as well as analyze the cost benefits and production increases that have been noted.

Similar Papers
  • Conference Article
  • Citations4

Enhancing Intervention Efficiency and Eliminating Uncertainty — First Ever Successful Conveyance of MWD Tools on CT for Multilateral Well Stimulation in a Middle Eastern Gas Well

  • Oct 25, 2016
  • Adrian Buenrostro +7
  • Conference Article
  • Citations7

Ultradeep Extended-Reach Stimulations

  • Mar 20, 2007
  • Taylor Tongs +3
  • Conference Article

Correction Routines for Production Logs in High Productivity Wells with Open Hole Completions and Screens

  • Nov 18, 1996
  • D Mustad +2
  • Conference Article
  • Citations1

First Worldwide Slim Coiled Tubing Logging Tractor Deployment

  • Mar 15, 2021
  • Laurie S Duthie +4
  • Conference Article

Successful Multi-Stage Hydraulic Fracturing of Openhole Horizontal Wells in Hassi Messaoud Oilfield

  • Dec 07, 2009
  • Olubiyi Akinkunmi Olaoye +4
  • Conference Article
  • Citations6

The Evolution, Optimization & Experience of Multistage Frac Completions in a North Sea Environment

  • Oct 27, 2014
  • T R Koløy +3
  • Conference Article
  • Citations2

Deployment of One of Its Kind Slim Coiled Tubing Tractor to Overcome Reach Issue in Extended Reach Restricted Smart Completed Wells

  • Nov 12, 2020
  • Shoaib Murtaza +3
  • Conference Article
  • Citations3

First Successful Autonomous ICD Pilot for GOR Management Across ADNOC Offshore

  • Dec 09, 2021
  • Fazeel Ahmad +12
  • Research Article
  • Citations2

Coiled-Tubing Telemetry Intervention in Shut-In Conditions

  • Jun 01, 2018
  • Journal of Petroleum Technology
  • Chris Carpenter
  • Conference Article
  • Citations4

Successful Deep Liner Cementing in South Texas

  • Feb 27, 1990
  • P Rae +2
  • Conference Article
  • Citations11

Targeted Annular Hydraulic Fracturing Using CT-Enabled Frac Sleeves: A Case History from Montana's Bakken Formation

  • Sep 30, 2013
  • Luis A Castro +2
  • Conference Article
  • Citations8

A Force to be Reckoned with: The Effects of Extended Reach Tools on Plug Mill-Out Operations

  • Mar 16, 2020
  • Jason M Skufca
  • Conference Article

Novel Technology of Concentric Coiled Tubing Enhances Ultra-Low Pressure Reservoir Wellbore Cleanouts in Kuwait

  • Nov 12, 2018
  • Mohammed Almatar +2
  • Conference Article
  • Citations3

Optimization of Milling Plugs With Coil Tubing on the Pinedale Anticline

  • Mar 31, 2009
  • B Perry +1
  • Conference Article
  • Citations3

Next Generation Relative Permeability Modifier Application in Acid Stimulation Treatments: An Effective Water Management Strategy for Mature Fields in Ecuador

  • Apr 21, 2014
  • Sumit Bhaduri +6
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.