• Home
  • Search
  • National Ignition Facility monthly status report--April 2000
  • Open Access IconOpen Access
  • https://doi.org/10.2172/15013113Copy DOI Icon

National Ignition Facility monthly status report--April 2000

  • May 26, 2000
  • E Moses
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

The Project provides for the design, procurement, construction, assembly, installation, and acceptance testing of the National Ignition Facility (NIF), an experimental inertial confinement fusion facility intended to achieve controlled thermonuclear fusion in the laboratory by imploding a small capsule containing a mixture of the hydrogen isotopes, deuterium and tritium. The NIF will be constructed at the Lawrence Livermore National Laboratory (LLNL), Livermore, California as determined by the Record of Decision made on December 19, 1996, as a part of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS). Safety: On Saturday April 29, 2000, while preparing the Ringer crane for operation at the NIF site, a mechanical malfunction was observed by the operator. He stopped work and consulted with line management. They agreed with the operator's assessment, and with the Livermore Emergency Duty Officer, implemented a precautionary evacuation of the area around the crane. DOE was notified of the situation. The crane was then placed in a safe condition. A crane maintenance vendor is inspecting the crane and a management team headed by the Beampath Infrastructure System Associate Project Manager is reviewing the documentation, crane history, and repairs to ensure that the crane is fully safe before reuse. Technical Status: The general status of the technologies underlying the NIF Project remains satisfactory. The issues currently being addressed are (1) cleanliness for installation, assembly, and activation of the laser system by Systems Engineering working groups; (2) laser glass, where a second pilot run at both commercial suppliers is expected to confirm the mitigation steps identified in the first pilot run; and (3) operational costs associated with Final Optics Assembly (FOA) optics components, where methods are being developed to mitigate 3 {omega} damage and to resolve beam rotation issues. Schedule: The project completion schedule remains a major concern for the quarter. Completion of the Beampath Infrastructure System (BIS) design and award of the contract for the Integration Management and Installation (IMI) Contractor are on the critical path schedule. The procurement package has been reviewed with DOE Procurement and NNSA Project organizations. DOE HQ approved moving forward with the request for proposal (RFP) for the IMI on April 24, and LLNL procurement has requested the proposal for the BIS IMI Services contract. The construction status of the Conventional Facilities at the end of March 2000 is 87% complete. Cost: The NIF Project Total Project Cost (TPC) is $1.2B. The Project has obligated 78% of the TPC funds. The remaining contingency is $16.7M. Because of schedule delays and projected increases in the design, construction management, assembly, and installation of the system infrastructure, cost growth of the TPC is anticipated and will remain a major concern until the budget rebaseline process is completed. The cost estimates and schedules were reviewed with the Level 1 and 2 Baseline Change Control Boards (BCCB) in preparation for the Energy Systems Acquisition Advisory Board Meetings scheduled in early May.

Similar Papers
  • Single Report

Containment Chamber Systems Engineering Project

  • Sep 30, 2019
  • Andrew Furmidge
  • Conference Article
  • Citations19

Self-healing pulse capacitors for the National Ignition Facility (NIF)

  • Jun 27, 1999
  • J.B Ennis +3
  • Conference Article
  • Citations7

Preformance and operational modeling of the National Ignition Facility

  • Jan 26, 2004
  • Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE
  • Michael J Shaw +4
  • PDF
  • Research Article
  • Citations23

Inertial confinement fusion ignition achieved at the National Ignition Facility – an editorial

  • Jan 01, 2023
  • High Power Laser Science and Engineering
  • C N Danson +1
  • Single Report

Site selection study for Sandia National Laboratories/New Mexico as an alternative site for the National Ignition Facility

  • Mar 01, 1996
  • D Miller +2
  • Single Report

2013 LLNL Nuclear Forensics Summer Program

  • Sep 26, 2013
  • Anna Kersting
  • Single Report

National Ignition Facility quality assurance plan for laser materials and optical technology

  • May 01, 1996
  • C.R Wolfe
  • Single Report
  • Citations1

National Ignition Facility pollution prevention and waste minimization plan

  • Sep 01, 1998
  • B Cantwell +1
  • Single Report

Engineering Annual Summary 1996

  • Apr 30, 1997
  • S Dimolitsas
  • Research Article
  • Citations20

General design and experiment for separated final optics assembly on high energy laser system

  • Mar 27, 2020
  • Optics & Laser Technology
  • Deyan Zhu +4
  • Conference Article
  • Citations2

Development of CCD cameras for soft x-ray imaging at the National Ignition Facility

  • Sep 26, 2013
  • Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE
  • A T Teruya +11
  • Research Article
  • Citations31

Inertial confinement fusion ablator physics experiments on Saturn and Nova

  • May 01, 1997
  • Physics of Plasmas
  • R E Olson +19
  • Single Report

Nuclear Probing of Dense Plasmas

  • Feb 14, 2007
  • Richard Petrasso
  • Conference Article
  • Citations6

Nuclear weapons effects testing of solar cells using the National Ignition Facility (NIF)

  • Jun 01, 2010
  • Phillip P Jenkins +12
  • Single Report
  • Citations5

High Energy Laser for Space Debris Removal

  • Oct 30, 2009
  • C Barty +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.