New Approach for Ship Drawing Planning Based on Their Reliability
- Nov 13, 2020
- Journal of Ship Production and Design
- Rajko Rubesa +3 more
Integration of ship design and ship production is necessary for an efficient shipbuilding process, although it requires very complex documentation planning in particular regarding its level of information and the completion scheduling. Optimally organized documentation planning could largely influence the shipbuilding total cost and lead time. Drawings finished with higher level of unreliability are shortening design phase but could result with major repair and rework activities that could increase production time and cost. On the other hand, insisting on fully completed drawings will increase design-stage time and will minimize repair and rework activities, but not necessarily the shipbuilding cost and lead time. This study researches drawing designing sequence and its unreliability due to designing with unknown, incomplete, or unreliable information. Therefore, analysis of documentation planning is performed based on their interdependence, production requirements, production technology level, and labor costs. Finally, a new approach for ship's drawings planning based on the drawing's reliability is proposed with support of developed computer application. Such approach calculates unreliability of interdependent drawings and proposes optimal documentation package regarding its level of information and lunching sequence toward production process.
- # Lead Time
- # Ship Production
- # Unreliable Information
- # Major Repair
- # Repair Activities
- # Production Requirements
- # Total Lead Time
- # Labor Costs
- # Production Process
- # Optimal Package