• Home
  • Search
  • New Hydrajet Tool Offers Better Horizontal Well Fracturing
  • Cite Icon4
  • https://doi.org/10.2118/96-05-03Copy DOI Icon

New Hydrajet Tool Offers Better Horizontal Well Fracturing

Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

Abstract A new hydrajet tool initiates horizontal well fractures more successfully by creating directional cuts in formations that cause fractures to be precisely aligned with perforations for better production fluid flow. Tortuous fracture paths to the wellbore are eliminated or reduced because the tool creates radial, fan-shaped slots behind the casing, and the tool produces small enough slots in the casing that casing integrity is maintained. Stimulation, damage-bypass treatments, and treatment of separate zones will be improved by the new tool. Introduction Horizontal wells are attractive to the industry because of their potential to improve oil production rates in many reservoirs. Advanced technology for drilling and completing horizontal wells makes horizontal wells economically feasible, and field experience demonstrates that re-entering an existing vertical wellbore to drill a horizontal segment is economically advantageous(l,2,3). Although many technologies designed for use in vertical wells can be used in horizontal wells, special problems arise in adapting them to the different characteristics of horizontal wells. Many of the differences between vertical and horizontal well treatment results are caused by the borehole position relative to the gravitational force. For example, correct placement of cement or stimulation fluids can be much more difficult in horizontal wells than in vertical wells. Hydrated cement particles tend to settle to the bottom "side" of the borehole annulus. Overburden forces act vertically, and thus are perpendicular to the axis of the horizontal wellbore. Reservoirs are positioned horizontally, and fractures, both pressure-induced and naturally occurring, are usually vertical, especially in the deeper wells. Horizontal Well Fracturing Problems Horizontal well fracturing is affected by the method of well completion. The method of completion used on the well determines the fracturing characteristics that influence injection rates. Three types of completions are described below. Open-hole Completions If borehole stability is not a problem, open-hole completions are often selected because of their low cost. However, open-hole completions provide few options for future remedial work, and they do not allow for abandoning the well effectively. These wells may be costly to manage during the later stages of well life. Slotted-liner Completions These completions offer better protection against wellbore collapse than open-hole completions, and they are relatively inexpensive. However, slotted-liner completions, like open-hole completions, provide few options for remedial procedures. Cemented-casing Completions Although cemented-casing completions are more expensive than the other completions, they offer the most options for remedial treatments, such as effective stimulation treatments and isolation of zones. They also allow for effective well abandonment. Cemented-casing completions, while initially more expensive, are cost effective throughout the life of the well. The best completion to use when fracture stimulations are required is a cemented-casing completion. In open-hole and slotted- casing completions, it is difficult to avoid creating multiple parallel fractures without using tools to isolate areas within the length of the well. With too many fractures opening, the injection rate into each one is insufficient to create a fracture of adequate width and length. Other complications are caused by the well fracture geometries of horizontal wells.

Similar Papers
  • Conference Article

Numerical Simulation of Infill Drilling With Horizontal and Vertical Wells: A Case Study of Partial Bottom Water Drive Reservoir

  • Nov 18, 1996
  • Gokhan Coskuner +1
  • Research Article
  • Citations33

Field Test of Electrical Heating With Horizontal And Vertical Wells

  • Mar 01, 1999
  • Journal of Canadian Petroleum Technology
  • B.C.W Mcgee +2
  • Conference Article
  • Citations164

Theoretical Study of Coning Toward Horizontal and Vertical Wells in Anisotropic Formations: Subcritical and Critical Rates

  • Oct 05, 1986
  • I Chaperon
  • Conference Article
  • Citations33

Simulation of Carbon Dioxide Flooding Using Horizontal Wells

  • Oct 04, 1992
  • M T Lim +3
  • Conference Article
  • Citations31

Transient Pressure Behaviour of Selectively Completed Horizontal Wells

  • Sep 25, 1994
  • Turhan Yildiz +1
  • PDF
  • Research Article
  • Citations29

On the coupled unsaturated–saturated flow process induced by vertical, horizontal, and slant wells in unconfined aquifers

  • Mar 02, 2017
  • Hydrology and Earth System Sciences
  • Xiuyu Liang +3
  • Conference Article
  • Citations11

Performance of Horizontal Wells in Gas Condensate Reservoirs, Djebel Bissa Field, Algeria

  • Jun 19, 2000
  • A Dehane +1
  • Conference Article
  • Citations6

Evaluation of Factors in Horizontal Well Recovery in the Pattani Basin in the Gulf of Thailand

  • Nov 15, 2011
  • Michael Scott Harr +4
  • Book Chapter
  • Citations1

Well Design and Construction

  • Oct 15, 2004
  • Water Encyclopedia
  • Nikolay Voutchkov
  • Conference Article

The Design and Effectiveness Assessment of Acidizing for Horizontal Wells

  • Nov 25, 2025
  • Baghir A Suleimanov +1
  • Conference Article
  • Citations109

Performance of Slanted and Horizontal Wells on an Anisotropic Medium

  • Oct 21, 1990
  • J Besson
  • Conference Article

Simple But Accurate Equations to Evaluate Wellbore Pressure Drawdown for Horizontal and Vertical Wells

  • Jun 08, 1997
  • Liang-Biao Ouyang +3
  • Conference Article
  • Citations4

Review of a Multi-Lateral Drilling and Stimulation Program

  • Nov 23, 1997
  • D.K Triolo +1
  • Research Article
  • Citations9

Comparative evaluation of pressure distribution between horizontal and vertical wells in a reservoir (edge water drive)

  • Apr 21, 2017
  • Nigerian Journal of Technology
  • I Eiroboyi +1
  • Conference Article
  • Citations10

Horizontal Versus Vertical Wells: Assessment of Sweep Efficiency in a Multi-Layered Reservoir Based on Consecutive Inter-Well Tracer Tests - A Comparison Between Water Injection and Polymer EOR

  • Oct 18, 2021
  • Bogdan-George Davidescu +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.