- Single Report
- 10.2172/10158535
NPR Physics Startup Testing Program
- Apr 25, 1962
- C.E Bowers
The New Production Reactor, as compared to existing Hanford reactors, employs new and unique design concepts. To properly evaluate these design concepts and their effects on reactor operations, nuclear safety, and reactor life, a comprehensive testing program is planned; this program, with its objectives and restrictions, is discussed in this report. It has been developed along the same line as the C and K Reactors test, programs, and is expected to require a total time of 6--8 weeks of round-the-clock testing. This estimate includes fuel loading time, but does not include time allotments for engineering acceptance tests prior to power operation nor does it include any of the time necessary for engineering and physics tests during the extensive power ascension program. The main body of this report is presented in three parts. The first section describes startup hazards and restrictions, reactor and component safety provisions prior to loading, and the itemized listing of quantities to be measured. The second includes preliminary material and plant conditions and a brief description of the individual tests. The third section (the Appendix), written in procedure language, comprises a rather detailed description of each individual test on a tentative basis; final test details and procedures, which will lie within the boundaries authorized by this document wil1 be established through joint efforts of Operational Physics and NPR Operations sub-section personnel.
Read more