• Home
  • Search
  • Operational excellence in total productive maintenance: statistical reliability as support for planned maintenance pillar
  • Cite Icon10
  • https://doi.org/10.1108/ijqrm-09-2023-0290Copy DOI Icon

Operational excellence in total productive maintenance: statistical reliability as support for planned maintenance pillar

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

PurposeTotal productive maintenance consists of strategies and procedures that aim to guarantee the entire functioning of machines in a production process so that production is not interrupted and no loss of quality in the final product occurs. Planned maintenance is one of the eight pillars of total productive maintenance, a set of tools considered essential to ensure equipment reliability and availability, reduce unplanned stoppage and increase productivity. This study aims to analyze the influence of statistical reliability on the performance of such a pillar.Design/methodology/approachIn this study, we utilized a multi-method approach to rigorously examine the impact of statistical reliability on the planned maintenance pillar within total productive maintenance. Our methodology combined a detailed statistical analysis of maintenance data with advanced reliability modeling, specifically employing Weibull distribution to analyze failure patterns. Additionally, we integrated qualitative insights gathered through semi-structured interviews with the maintenance team, enhancing the depth of our analysis. The case study, conducted in a fertilizer granulation plant, focused on a critical failure in the granulator pillow block bearing, providing a comprehensive perspective on the practical application of statistical reliability within total productive maintenance; and not presupposing statistical reliability is the solution over more effective methods for the case.FindingsOur findings reveal that the integration of statistical reliability within the planned maintenance pillar significantly enhances predictive maintenance capabilities, leading to more accurate forecasts of equipment failure modes. The Weibull analysis of the granulator pillow block bearing indicated a mean time between failures of 191.3 days, providing support for optimizing maintenance schedules. Moreover, the qualitative insights from the maintenance team highlighted the operational benefits of our approach, such as improved resource allocation and the need for specialized training. These results demonstrate the practical impact of statistical reliability in preventing unplanned downtimes and informing strategic decisions in maintenance planning, thereby emphasizing the importance of your work in the field.Originality/valueIn terms of the originality and practicality of this study, we emphasize the significant findings that underscore the positive influence of using statistical reliability in conjunction with the planned maintenance pillar. This approach can be instrumental in designing and enhancing component preventive maintenance plans. Furthermore, it can effectively manage equipment failure modes and monitor their useful life, providing valuable insights for professionals in total productive maintenance.

Similar Papers
  • PDF
  • Research Article
  • Citations17

Overall Equipment Efficiency (OEE) Enhancement in Manufacture of Electronic Components & Boards Industry through Total Productive Maintenance Practices

  • Jan 01, 2018
  • MATEC Web of Conferences
  • Soo-Fen Fam +5
  • Research Article
  • Citations53

Evaluating 8 pillars of Total Productive Maintenance (TPM) implementation and their contribution to manufacturing performance

  • Jan 01, 2018
  • IOP Conference Series: Materials Science and Engineering
  • E Y T Adesta +2
  • Research Article
  • Citations18

Synergising total productive maintenance elements with ISO 9001:2008 standard based quality management system

  • Oct 07, 2014
  • The TQM Journal
  • N.M Sivaram +4
  • Conference Article
  • Citations3

Resource Optimization at Remote Facilities by Leveraging Advance Maintenance Practices TPM (Total Productive Maintenance), ODR (Operator Driven Reliability) and Industry 4.0 Technologies

  • Oct 02, 2023
  • Muhammad Shahzad Ahmed +10
  • Research Article
  • Citations6

Evaluation of total productive maintenance implementation in manufacture

  • Mar 01, 2021
  • IOP Conference Series: Materials Science and Engineering
  • I Rizkya +3
  • Research Article
  • Citations181

A study of total productive maintenance implementation

  • Sep 01, 2001
  • Journal of Quality in Maintenance Engineering
  • F Ireland +1
  • Research Article
  • Citations4

Implementing Total Productive Maintenance in Yemeni Company for Industry and Commerce (YCIC): Case Study

  • Mar 24, 2023
  • Advances in Image and Video Processing
  • A M Badiea +2
  • Research Article

ANALISA TERJADINYA SIX BIG LOSSES PADA MESIN EVAPORATOR DENGAN METODE TPM DI SEKSI REFINERY MSG PT. XXX

  • Apr 30, 2018
  • JKIE (Journal Knowledge Industrial Engineering)
  • Tama Viga +1
  • Book Chapter
  • Citations5

11 - Case studies

  • Jan 01, 2001
  • TPM - A Route to World Class Performance
  • Peter Willmott +1
  • Research Article

Develop Total Productive Maintenance Checklists using Functional Based Approach

  • Jul 09, 2025
  • Jurnal E-Komtek (Elektro-Komputer-Teknik)
  • Nur Muhammad Malikul 'Adil +1
  • Research Article
  • Citations58

Total productive maintenance

  • Feb 17, 2018
  • Total Quality Management & Business Excellence
  • Tina Kanti Agustiady +1
  • Research Article
  • Citations27

Effectiveness of TPM implementation with and without integration with TQM in Indian manufacturing industries

  • Oct 07, 2014
  • Journal of Quality in Maintenance Engineering
  • Kanwarpreet Singh +1
  • Research Article
  • Citations187

Total Productive Maintenance (TPM) Implementation in a Machine Shop: A Case Study

  • Jan 01, 2013
  • Procedia Engineering
  • Ranteshwar Singh +3
  • Research Article
  • Citations22

Reliability analysis and hypothesis testing of critical success factors of total productive maintenance

  • Jan 06, 2022
  • International Journal of Quality & Reliability Management
  • Shyamkumar D Kalpande +1
  • Research Article
  • Citations137

Strategies and success factors for overcoming challenges in TPM implementation in Indian manufacturing industry

  • May 30, 2008
  • Journal of Quality in Maintenance Engineering
  • I.P.S Ahuja +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.