• Home
  • Search
  • Optimal preventive maintenance planning for multiple elevators
  • Cite Icon11
  • https://doi.org/10.1108/13552510110397430Copy DOI Icon

Optimal preventive maintenance planning for multiple elevators

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The purpose of this paper is to properly plan the preventive maintenance schedule for multiple elevators and optimize the number of maintenance workers.The total amount of the maintenance cost consisting of the labor cost, the part cost, and the quality cost (the loss evaluated in terms of cost, to be incurred when an elevator breaks down) is to be minimized.The method is presented of setting up the optimal preventive maintenance schedule on a long‐term basis by rescheduling the contents of schedule dynamically and flexibly in accordance with the ever‐changing maintenance conditions, taking the possibility of the future occurrence of failure into consideration. From numerical experiments, the validity of the proposal procedure for planning the preventive maintenance schedule and the effectiveness of considering the possibility of the future occurrence of failure in planning the schedule are shown, and the optimal number of maintenance workers can be decided.

Similar Papers
  • PDF
  • Research Article
  • Citations5

Jet Engine Optimal Preventive Maintenance Scheduling Using Golden Section Search and Genetic Algorithm

  • Jul 13, 2022
  • Journal of Prognostics and Health Management
  • Sajad Saraygord Afshari +4
  • Research Article
  • Citations9

Stress-reducing preventive maintenance model for a unit under stressful environment

  • Jul 05, 2012
  • Reliability Engineering & System Safety
  • J.H Park +2
  • Book Chapter

Optimal Policy Study on Reliability-Centered Preventive Maintenance for a Single-Equipment System

  • Nov 30, 2014
  • Q M Liu +2
  • Research Article
  • Citations11

Condition‐based preventive maintenance with a yield rate threshold for deteriorating repairable systems

  • Aug 23, 2022
  • Quality and Reliability Engineering International
  • Yeu‐Shiang Huang +2
  • Research Article
  • Citations49

An optimal dynamic interval preventive maintenance scheduling for series systems

  • Apr 18, 2015
  • Reliability Engineering & System Safety
  • Yicong Gao +3
  • Research Article
  • Citations17

Opportunistic preventive maintenance scheduling for multi-unit reusable rocket engine system based on the variable maintenance task window method

  • Jan 14, 2022
  • Aerospace Science and Technology
  • Ping Jin +4
  • Research Article
  • Citations42

Bayesian failure-rate modeling and preventive maintenance optimization

  • Apr 15, 2017
  • European Journal of Operational Research
  • Dmitriy Belyi +3
  • Research Article

An Optimal Preventive Maintenance Model for a Structure

  • Mar 27, 2012
  • Advanced Materials Research
  • Xiao Li Zou
  • Research Article
  • Citations46

Several objective criteria for optimal generator preventive maintenance scheduling

  • May 01, 1977
  • IEEE Transactions on Power Apparatus and Systems
  • H.H Zurn +1
  • Research Article
  • Citations2

An Optimal Scheduling for Medical Equipment Preventive Maintenance Over a Finite Planning Horizon Using Ant Colony Algorithm

  • Jul 01, 2017
  • Journal of Clinical Engineering
  • Neven Saleh +4
  • Conference Article
  • Citations11

Optimal preventive maintenance interval and spare parts number in a rolling stock system

  • Jun 01, 2012
  • Won Young Yun +2
  • Conference Article
  • Citations7

Outage performance improvement by Preventive Maintenance optimization

  • Jan 01, 2012
  • Teresa E Tutt +3
  • Research Article
  • Citations23

Optimal scheduling of power transformers preventive maintenance with Bayesian statistical learning and influence diagrams

  • Mar 07, 2020
  • Journal of Cleaner Production
  • Petar Sarajcev +2
  • Research Article
  • Citations4

Optimal maintenance planning with special emphasis on deterioration process and vessel routing for offshore wind systems

  • Jan 18, 2022
  • Energy & Environment
  • Shuo-Yan Chou +3
  • Conference Article

Evaluation of demand side behaviors in cost-emission based PM scheduling under restructured environment

  • May 01, 2016
  • Mojgan Mollahassani-Pour +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.