The contract between the DOE and the utilities specifies that the DOE will receive spent fuel from the nuclear utilities in 1998. This study investigates the feasibility of employing a simple Transfer Facility which can be constructed quickly, and operate while the full-scale MRS facilities are being constructed. The Transfer Facility is a hot cell designed only for the purpose of transferring spent fuel assemblies from the Office of Civilian Radioactive Waste Management (OCRWM) transport casks (shipped from the utility sites) into onsite concrete storage casks. No operational functions other than spent fuel assembly transfers and the associated cask handling, opening, and closing would be performed in this facility. Radioactive waste collected in the Transfer Facility during operations would be stored until the treatment facilities in the full-scale MRS facility became operational, approximately 2 years after the Transfer Facility started operation. An alternate wherein the Transfer Facility was the only waste handling building on the MRS site was also examined and evaluated. 6 figs., 26 tabs.

Similar Papers
  • Single Report
  • Citations1

Siting of an MRS facility: identification of a geographic region that reduces transportation requirements

  • Apr 01, 1985
  • G.M Holter +1
  • Single Report

Nuclear Waste Fund fee adequacy: An assessment: Nuclear Waste Policy Act

  • Jun 01, 1987
  • Not Available
  • Single Report

DOE Office of Civilian Radioactive Waste Management (OCRWM) system studies digest

  • Jun 01, 1992
  • N.B Mcleod +3
  • Single Report

Mescalero Apache Tribe Monitored Retrievable Storage (MRS). Phase 1 feasibility study report

  • Mar 13, 1992
  • F Peso
  • Single Report

MONITOR: A computer model for estimating the costs of an integral monitored retrievable storage facility

  • Dec 01, 1986
  • P.W Reimus +3
  • Research Article
  • Citations2

Prospects For Monitored Retrievable Storage Of High-Level Nuclear Waste

  • Dec 01, 1991
  • Review of Policy Research
  • Amy Mccabe +1
  • Single Report
  • Citations6

Draft Mission Plan Amendment

  • Sep 01, 1991
  • Usdoe Office Of Civilian Radioactive Waste Management, Washington, Dc (United States)
  • Single Report

Information services directory

  • Jan 01, 1991
  • Usdoe Office Of Civilian Radioactive Waste Management, Washington, Dc (United States)
  • Single Report

MRS system study for the repository: Yucca Mountain Site Characterization Project; Volume 2

  • Dec 01, 1990
  • T Sinagra +1
  • Single Report

Facility Interface Capability Assessment (FICA) summary report

  • May 01, 1992
  • J Viebrock +2
  • Single Report

Planning Document for Spent Nuclear Fuel (SNF) Cleanliness Inspection Process (OCRWM)

  • Feb 14, 2000
  • A.L Pitner
  • Single Report
  • Citations1

World nuclear outlook 1994

  • Dec 01, 1994
  • Single Report

Office Civilian Waste Management Transportation Institutional Program Update on Collaborative Efforts with Key Stakeholders

  • Dec 29, 2004
  • E Saris +2
  • Research Article

3.3.2 Design Concept Evaluation Using System Throughput Model

  • Jun 01, 2004
  • INCOSE International Symposium
  • Gary Sequeira +1
  • Research Article
  • Citations16

Characteristics of potential repository wastes: Oak Ridge National Laboratory. U.S. Dept. of Commerce, Springfield, VA. 22161; 1992. Vols. 1–4, (DOE/RW-0184-R1) softcover

  • Jan 01, 1993
  • Environment International
  • K.J Notz
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.