Abstract

The aim of this paper is to present the proactive strategy for resource-constrained project scheduling problems under a fuzzy random environment with activity splitting, i.e. activities can be split one or more times in scheduling process. After giving the motivation and justification for employing fuzzy random variables, a mathematical formulation model for preemption resource-constrained project scheduling problems (PRCPSP) with fuzzy random duration and resource availabilities is built. In this model, the objective is to maximize the sum of free slack which contains two parts: one is the time buffer that the start time of some activities can be delayed, the other is the shortage of resource is allowed. Since the difficulties of dealing with fuzzy random variables, the model is transformed into an equivalent crisp one. A numerical example is finally applied to demonstrate the efficiency of the proposed model and proactive strategy, and the generated results verify the robustness for PRCPSP.

Similar Papers
  • Research Article
  • Citations32

Modeling data envelopment analysis by chance method in hybrid uncertain environments

  • Nov 13, 2009
  • Mathematics and Computers in Simulation
  • Rui Qin +1
  • Research Article
  • Citations36

Structural reliability analysis with fuzzy random variables using error principle

  • Oct 13, 2017
  • Engineering Applications of Artificial Intelligence
  • Haibin Li +1
  • Research Article
  • Citations5

Fuzzy Reliability Analysis With Fuzzy Random Variables Based on Perturbation Principle

  • Jan 01, 2019
  • IEEE Access
  • Xiaobo Nie +1
  • Book Chapter

A Dynamic Programming-Based Genetic Algorithm for a Joint Pricing Construction Materials Procurement Problem with Uncertainties

  • Aug 24, 2016
  • Kai Kang +3
  • Research Article
  • Citations43

A class of random fuzzy programming and its application to supply chain design

  • Oct 14, 2008
  • Computers & Industrial Engineering
  • Jiuping Xu +2
  • Research Article
  • Citations84

A new evaluation of mean value for fuzzy numbers and its application to American put option under uncertainty

  • Jun 05, 2006
  • Fuzzy Sets and Systems
  • Yuji Yoshida +3
  • Research Article
  • Citations3

Ordered fuzzy random variables: Definition and the concept of normality

  • Sep 09, 2020
  • Information Sciences
  • Adam Marszałek +1
  • Research Article
  • Citations19

Managing Uncertainty and Disruptions in Resource Constrained Project Scheduling Problems: A Real-Time Reactive Approach

  • Jan 01, 2021
  • IEEE Access
  • Md Humyun Fuad Rahman +2
  • Research Article
  • Citations3

Some inequalities and limit theorems for fuzzy random variables adopted with $$\alpha $$-values of fuzzy numbers

  • Jun 19, 2019
  • Soft Computing
  • Gholamreza Hesamian +2
  • Research Article
  • Citations3

Bilevel linear programming with fuzzy random variables through absolute deviation minimisation

  • Jan 01, 2016
  • International Journal of Operational Research
  • Masatoshi Sakawa +1
  • Book Chapter
  • Citations1

A Fuzzy Random Variable Approach to Life Insurance Pricing

  • Jan 01, 2012
  • Jorge De Andrés-Sánchez +1
  • Research Article
  • Citations9

Material transportation problems in construction projects under an uncertain environment

  • Mar 23, 2015
  • KSCE Journal of Civil Engineering
  • Fang Yan +2
  • Book Chapter

Proposing a Pre-emptive Resource Constrained Project Scheduling Problem (PRCPSP) Model to Optimize Manpower and Project Delivery Time (A Case Study)

  • Oct 26, 2020
  • Arman Saeidi +3
  • Research Article
  • Citations271

Fuzzy Random Variables: A Scalar Expected Value Operator

  • Jun 01, 2003
  • Fuzzy Optimization and Decision Making
  • Yian-Kui Liu +1
  • Research Article
  • Citations26

A fuzzy chance-constrained programming model with type 1 and type 2 fuzzy sets for solid waste management under uncertainty

  • Sep 21, 2016
  • Engineering Optimization
  • Xiaolin Ma +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.