  • Process Control Ladder Logic Trouble Shooting Techniques Fundamentals
  • Cite Icon27
  • https://doi.org/10.36548/jsws.2019.4.001Copy DOI Icon

Process Control Ladder Logic Trouble Shooting Techniques Fundamentals

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Programmable Logic Controller (PLC) based process control automation projects are a multiphase task requiring months of planning, specification documentation, design, implementation, debugging, and final commissioning. Debugging real time process control implementation is a three-phase process; logic simulation debugging, field static checkout, and in plant final testing and tuning. This paper briefly discusses the fundamental techniques used in the first two stages of implemented ladder logic debugging [5, 6]. A wastewater treatment facility for the processing of high flow storm rainwater using the Allen Bradley (AB) SLC 500 PLC is used to illustrate the concepts discussed. The rainwater is channeled to two large wet wells, the east wet well and the west wet well. The water is pumped to the river from the two connected wells at constant rate using a predefined process sequence control. Pumping station with multi motors deriving constant speed immersed pumps are used to regulate the discharge water flow and the level in the two wells. Only two pumps are assumed here; one in the east wet well and the other in the west wet well. The motors provide an input discrete signal indicating if the motor is running or not. The motors can also start by activating the Push Button located on the local panel if the AUTO/MAN switch is in Manual. Three float switches are used to provide an accurate indication of the water level at three prespecified critical east / west wet well locations. The Low-Level Float switch triggers the stopping of the running pump. The High-level Float switch triggers the starting of the scheduled pump. If the scheduled pump fails to start within more than 5 seconds, a backup pump is selected and started (not shown in this paper). An alarm must be issued in order to alert the operator of any motor failure. The Very High-level float switch triggers the starting of both pumps. If either of the two pumps fails to start the corresponding alarm is activated by the control. Pumps are scheduled to run according to an operator pre-defined calendar. This input is expected in hours of accumulated total pump run time. The two pumps must alternate while the water level is below the Very High Level and above the Low Level. Cascaded timers are not altered during the time when the two pumps are running. This paper shows the static and simulation debugging an abbreviated version of the typical original system used in wastewater facilities.

Similar Papers
  • Research Article
  • Citations25

Different Applications of Programmable Logic Controller (PLC)

  • Feb 28, 2014
  • International Journal of Computer Science, Engineering and Information Technology
  • Maha M Lashin
  • Conference Article
  • Citations2

Automated Translation of Safety Critical Application Software Specifications into PLC Ladder Logic

  • Mar 01, 2008
  • Proceedings - IEEE Aerospace Conference
  • Kurt W Leucht +1
  • Conference Article

Aeroservoelasticity’s Digital Simulation Using PLC

  • Apr 29, 2024
  • K Sudha Deepthi +1
  • Conference Article

Research on Welding Machine Control System

  • Jan 01, 2015
  • Jiandong Yang +1
  • PDF
  • Research Article
  • Citations10

Software Architecture and Framework for Programmable Logic Controllers: A Case Study and Suggestions for Research

  • Jun 22, 2016
  • Machines
  • E Walters +1
  • Research Article
  • Citations2

Automatic Water Level and Pressure Control System Prototype Design Using Programmable Logic Controller and Human Machine Interface

  • Jul 20, 2023
  • International Journal of Advanced Science Computing and Engineering
  • Ibnu Hajar +2
  • Book Chapter

7 - Troubleshooting control circuits

  • Jan 01, 2004
  • Practical Troubleshooting of Electrical Equipment and Control Circuits
  • Mark Brown +2
  • PDF
  • Research Article
  • Citations3

Applied methods to detect and prevent vulnerabilities within PLC alarms code

  • Apr 01, 2022
  • SN Applied Sciences
  • Abraham Serhane +3
  • Conference Article
  • Citations10

A Review Of Programmable Logic Controllers In Control Systems Education

  • Sep 03, 2020
  • Michael Foster +2
  • Research Article
  • Citations11

Low-cost and Portable Process Control Laboratory Kit

  • Feb 01, 2018
  • TELKOMNIKA (Telecommunication Computing Electronics and Control)
  • Ade Gafar Abdullah +4
  • Conference Article
  • Citations4

Water Level Control System using Programmable Logic Controller (PLC): Rujban Water Supply System

  • Apr 21, 2021
  • Yousef M K Ali +3
  • Research Article

Rancang Bangun Sistem Pengisian Tangki Air Otomatis Berbasis PLC Siemens S7-200 Dengan Sensor Proximity Kapasitif

  • Jan 24, 2026
  • Jurnal Teknik dan Sistem Komputer
  • Jaenal Rizki +2
  • Conference Article
  • Citations2

Improvement of control and monitoring of industrial processes using PLC by implementing asynchronous bidirectional communications and UMI

  • Nov 01, 2019
  • Ramón A Mendoza +1
  • Research Article

Анализ возможности использования программируемых контроллеров при управлении водораспределением в Донском магистральном канале

  • Jan 01, 2023
  • Land Reclamation and Hydraulic Engineering
  • Alexander А Tkachev +4
  • Conference Article
  • Citations4

Is the role of applied programming languages changing?

  • Nov 06, 1996
  • J.W Honchell +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.