• Home
  • Search
  • Process management in hospitals: an empirically grounded maturity model
  • Open Access IconOpen Access
  • Cite Icon45
  • https://doi.org/10.1007/s40685-014-0012-xCopy DOI Icon

Process management in hospitals: an empirically grounded maturity model

Show More
  • Abstract
  • Highlights & Summary
  • PDF
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Abstract In order to improve transparency and stabilise health care costs, several countries have decided to reform their healthcare system on the basis of diagnosis-related groups (DRG). DRGs are not only used for classifying medical treatments, but also for case-based reimbursement, hence induce active competition among hospitals, forcing them to become more efficient and effective. In consequence, hospitals are investing considerably in process orientation and management. However, to date there is neither a consensus on what capabilities hospitals need to acquire for becoming process-oriented, nor a general agreement on the sequence of development stages they have to traverse. To this end, this study proposes an empirically grounded conceptualisation of process management capabilities and presents a staged capability maturity model algorithmically derived on the basis of empirical data from 129 acute somatic hospitals in Switzerland. The five capability maturity levels start with ‘encouragement of process orientation’ (level 1), ‘case-by-case handling’ (level 2), and ‘defined processes’ (level 3). Ultimately, hospitals can reach the levels ‘occasional corrective action’ (level 4) and ‘closed loop improvement’ (level 5). The empirically derived model reveals why existing, generic capability maturity models for process management are not applicable in the hospitals context: their comparatively high complexity on the one hand and their strong focus on topics like an adequate IT integration and process automation on the other make them inadequate for solving the problems felt in the hospital sector, which are primarily of cultural and structural nature. We deem the proposed capability maturity model capable to overcome these shortcomings.

Loading PDF

Similar Papers
  • Research Article
  • Citations8

The Software Process - What It Is, And HowTo Improve It

  • Jan 01, 1970
  • WIT Transactions on Information and Communication Technologies
  • Sami Zahran
  • Research Article
  • Citations26

Key process area mapping in the production of an e‐capability maturity model for UK construction organisations

  • Nov 08, 2011
  • Journal of Financial Management of Property and Construction
  • Robert Eadie +2
  • PDF
  • Research Article
  • Citations4

Pursuing sustained competitive advantage through the use of process management

  • May 27, 2024
  • International Journal of Lean Six Sigma
  • Priscilla Huldt Navarro +1
  • Research Article

The application of DRGs technology by the hospital health manage professionals

  • Nov 02, 2015
  • Chinese Journal of Hospital Administration
  • Ying Chen +3
  • PDF
  • Research Article
  • Citations2

Towards the methodology of automation of buildings and structures life cycle

  • Feb 01, 2022
  • The Eurasian Scientific Journal
  • Konstantin Losev +1
  • Conference Article
  • Citations10

Tailoring the software engineering Institute's (SEI) Capability Maturity Model (CMM) to a software sustaining engineering organization

  • Nov 09, 1992
  • D.W Drew
  • Research Article
  • Citations3

Transition to hospital process orientation: The case of regional hospitals in Latvia

  • Dec 13, 2015
  • Journal of Hospital Administration
  • Juris Barzdins +3
  • Research Article

Diagnosis related groups technology as used in hospital management

  • Jan 02, 2017
  • Chinese Journal of Hospital Administration
  • Wei-Rong Li +3
  • Research Article
  • Citations1

Relationship Between Servant Leadership and Total Quality Management Practices: Mediating Effects of Interfunctional Coordination– An Empirical Study Concerning the Information Technology Industry, Hyderabad

  • Dec 30, 2024
  • Management and Production Engineering Review
  • Kdv Prasad +2
  • Front Matter
  • Citations1

Patient Dumping: The Physician's Dilemma

  • Mar 01, 1989
  • Chest
  • Christopher Rose
  • Research Article
  • Citations28

Design of a digital library maturity model (DLMM)

  • Sep 19, 2018
  • The Electronic Library
  • Fatemeh Sheikhshoaei +3
  • Research Article
  • Citations7

A comparative study on asset management capability maturity models

  • Jan 01, 2015
  • International Journal of Strategic Engineering Asset Management
  • Muhammad Nateque Mahmood +4
  • Research Article
  • Citations65

SPICE: a business process diagnostics tool for construction projects

  • Mar 01, 2000
  • Engineering, Construction and Architectural Management
  • M Sarshar +6
  • Book Chapter
  • Citations1

The Adoption and Transformation of Capability Maturity Models in Government

  • Jan 01, 2018
  • Terry F Buss
  • Research Article

How Will The Capability Maturity ModelFare In Europe

  • Jan 01, 1970
  • WIT Transactions on Information and Communication Technologies
  • Andy Bissett +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.