• Home
  • Search
  • Programme For Standardization Of Subsea Equipment
  • Cite Icon7
  • https://doi.org/10.4043/7242-msCopy DOI Icon

Programme For Standardization Of Subsea Equipment

  • May 3, 1993
  • C.a.s Paulo +1 more
Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

ABSTRACT Since the first subsea well started producing in Brazil, Campos Basin has turned out into a big laboratory where innovations and different concepts ranging from one-atmosphere chambers to diverless guidelineless wet Christmas trees have been tested. Supported by the operational experience acquired throughout the years, motivated by the large number of subsea wells to be drilled and completed in the new fields and pressed by the need of some rationalization to deal with rigs, tools, risers, wellheads, trees and spare parts for more than two hundred wells, PETROBAS started its own efforts on standardization of subsea equipment. To achieve the desired interchangeability with equipments manufactured in different occasions and even by different suppliers, it is necessary to define not only functional and performance requirements, normally found on API Specs, but also some crucial geometry and dimensions, mostly of interfaces. This paper describes the experience with some standardization made in the past, the programme being carried out in the present, the equipments and interfaces being standardized and how far PETROBAS is going into equipment definition. INTRODUCTION After hundreds of wells drilled in Brazilian waters, more than 170 wet x-mas trees installed in water depths from 70 to 781 meters, 10 floating production systems and 14 fixed platforms installed, and a considerable mileage of flowlines and umbilicals laid, the experience obtained with these offshore operations performed in Campos Basin has made it possible to evaluate the pros and cons of standardization of subsea equipment. The simple conclusion was that standardization really brings considerable benefits. The resulting operational flexibility associated to the use of proven equipment and procedures saves rig time and can reduce production loss during workovers. Savings can also be detected from the reduction of the number of spare parts and tools, but the savings in values related to the operations exceed considerably those ones connected to equipment acquisition and store. So the great benefit is the operational flexibility. On the other hand, non-standardized equipment serves as an open door to continuous modifications of equipment design, which is welcome when the equipment is not satisfying customer's requirements. But once the equipment is properly tested and proven, unnecessary proliferation of slightly differing designs need to be avoided. FIRST STEPS ON STANDARDIZATION The first significant interface adopted as a standard by PETROBAS in the early 1980's, was the subsea wellhead external profile and the sealing area for VX/Ax rings. At that time, the various rigs contracted to drill in Brazilian waters had BOPS provided with H4 connectors of different sizes: 21.1/4", 18.3/4", 16.3/4" and 13.5/8", leading to the use of different wellhead systems and x-mas trees connectors. PETROBR&3 then defined the 18.3/4" H4 profile as the standard external profile for all high pressure housings, and the BOPS were equipped with appropriate connectors. More recently, this definition had to be divided in accordance to the drilling system type:

Similar Papers
  • Conference Article
  • Citations5

Use of Pressure-Activated Sealant to Cure Leaks in Subsea Wells—A Case Study in Campos Basin

  • Oct 09, 2005
  • V F Rodrigues +3
  • Conference Article

Enhanced Safety With New Subsea Intervention BOP for Horizontal Wells

  • May 04, 1992
  • Gunnar Eriksen +2
  • Conference Article

Risk-Based Integrity Analysis and Production Management: A Practical Case Study of DHSV Strategies in Subsea Wells, Past and Future

  • Apr 27, 2026
  • R S Roman +5
  • Conference Article
  • Citations6

Ormen Lange Subsea Production System

  • Apr 30, 2007
  • Thomas Bernt +1
  • Conference Article
  • Citations2

Holistic Annulus Investigation as a Tool to Assure Well Integrity in a Deep Water Environment

  • Aug 05, 2014
  • Ayotunde Ajayi +5
  • Conference Article
  • Citations1

Wellhead for Rigless Cable-Deployed ESP

  • Mar 06, 2017
  • D F Darmawan +3
  • Conference Article

A New Approach to Completing a Previously Drilled Subsea Well

  • Apr 27, 1987
  • J.E Hed +1
  • Conference Article
  • Citations2

Major Technical and Regulatory Issues for Monohull Floating Production Systems in the Gulf of Mexico.

  • May 03, 1999
  • Richard D&Apos;Souza
  • Conference Article
  • Citations1

Standardized Swivel System for Lufeng 22-1 FPSO

  • May 05, 1997
  • Atle B Ingebrigtsen
  • Conference Article
  • Citations19

Permanent Downhole Gauges: A Key To Optimize Deepsea Production

  • May 04, 1992
  • M.F.C Bezerra +2
  • Conference Article
  • Citations1

Subsea Manifolds Optimization - The combination of Mature and New Technologies

  • May 06, 1996
  • C.A.S Paulo
  • Research Article
  • Citations6

Practical example of data integration in a PRM environment, BC-10, Brazil

  • Feb 01, 2017
  • First Break
  • Hesham Ebaid +5
  • Conference Article

Market Dynamics and Opportunities in Decommissioning in Brazil

  • Oct 21, 2025
  • OTC Brasil
  • Kowarski Clarissa +3
  • Conference Article
  • Citations2

The Who Dat Development: Evolution of a Project from Lease Sale to First Production

  • Apr 30, 2012
  • Richard Lee Fowler +11
  • Conference Article

Gullfaks A Subsea Wells System Development, Completion, and Production Startup

  • Apr 27, 1987
  • O Inderberg +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.