Project Control Based on a Mutual Application of Pert and Earned Value Management Methods

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Project Control Based on a Mutual Application of Pert and Earned Value Management Methods

Similar Papers
  • Research Article

Critical Path Identification and Time Estimation in Construction: Application of PDM and PERT

  • Nov 24, 2024
  • Jurnal Sipakatau: Inovasi Pengabdian Masyarakat
  • Gufran Darma Dirawan +5
  • Research Article
  • Citations1

A Comparative Analysis of the CPM and PERT Methods in Project Time Management for a High-Rise Building Construction Project in Yogyakarta

  • May 01, 2025
  • Sustainable Civil Building Management and Engineering Journal
  • Fazabella Wijaya Santoso +2
  • Research Article
  • Citations2

Mitigation Strategies for Overcoming Delays in High-Rise Construction Projects: A Comprehensive Literature Review

  • Oct 01, 2024
  • Tuijin Jishu/Journal of Propulsion Technology
  • Kevinkumar D Patel
  • Research Article

Enhancing programevaluation and review technique (PERT) for construction project scheduling with Bayesian updating and appropriate probability distributions

  • Dec 25, 2024
  • Journal of Science and Technology in Civil Engineering (JSTCE) - HUCE
  • Nguyen Anh Duc
  • Research Article
  • Citations1

ANALISIS PELAKSANAAN PENJADWALAN PROYEK PEMBANGUNAN GEDUNG CLUBHOUSE DENGAN PENDEKATAN CPM DAN PERT PADA PT. XY

  • Apr 30, 2018
  • JKIE (Journal Knowledge Industrial Engineering)
  • Kasid Kasid +1
  • Research Article
  • Citations23

A dependent project evaluation and review technique: A Bayesian network approach

  • Jul 30, 2019
  • European Journal of Operational Research
  • Johan René Van Dorp
  • Research Article
  • Citations24

RPERT: Repetitive-Projects Evaluation and Review Technique

  • Sep 12, 2013
  • Alexandria Engineering Journal
  • Remon Fayek Aziz
  • Conference Article
  • Citations8

Engineering, procurement and construction (EPC) project management for reducing cost and time: A case study of petrochemical plant

  • May 01, 2018
  • Supakan Sangroungrai +2
  • Research Article
  • Citations2

Scheduling The Construction of Low-Income Community Houses in Palu City Using the Probabilistic Duration Method

  • Jun 01, 2024
  • IOP Conference Series: Earth and Environmental Science
  • A Setiawan +2
  • Research Article

Improving Project Time Estimation in Game Development: Rayleigh Distribution and Program Evaluation and Review Technique Approach

  • Jan 20, 2025
  • Jurnal sosial dan sains
  • Mochamad Haikal Ghiffari +1
  • Book Chapter
  • Citations6

Stochastic Project Network Scheduling Technique for Construction Projects Using GERT

  • Jan 01, 2022
  • K Pregina +1
  • Research Article
  • Citations27

New Method for Calculating Path Float in Program Evaluation and Review Technique (PERT)

  • Sep 15, 2003
  • Journal of Construction Engineering and Management
  • Deng Hua Zhong +1
  • Research Article

Penjadwalan Waktu Menggunakan Metode Program Evaluation and Review Technique (PERT)

  • Mar 31, 2024
  • Surya Beton : Jurnal Ilmu Teknik Sipil
  • Ferdi Novanto +2
  • Conference Article
  • Citations2

Random Simulation Method for the PERT Network Based on the CrystalBall and Excel Environment

  • Sep 01, 2011
  • Hongxiang Ouyang +1
  • Book Chapter

Suggestions for implementing geotechnical risk management

  • Jun 01, 2009
  • Martin Th Van Staveren
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.