• Home
  • Search
  • Relationships between System Loading and Cycle Time in a Residential Construction Production System
  • Cite Icon3
  • https://doi.org/10.1061/40671(2003)40Copy DOI Icon

Relationships between System Loading and Cycle Time in a Residential Construction Production System

  • Mar 14, 2003
  • Howard H Bashford +2 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Production home building possesses characteristics similar to manufacturing processes (such as the construction of more or less similar houses repeatedly and a growing demand for mass customization of homes). Home builders generally utilize critical path method scheduling, cost estimating, and earned value analysis management tools to manage their production process. However, these tools are not responsive to many undesirable situations that arise during the production process, such as increasing cycle time and increasing amounts of work in process, both of which increase capital investment, decrease company financial performance, and slow product delivery to customers. This study examines relationships between cycle time, work in process, system throughput, new construction starts, and production system capacity using building permit data for new single family homes in Chandler, Arizona. The applicability of Little's Law, a basic equation used in factory production system design, to a residential production system is examined. This study shows a definite, predictable relationship between cycle time, work in process, and production system throughput. This study provides for further study of production system characteristics that have historically not been considered in construction management models, with the expectation of developing a new construction management system that will account for more of the characteristics of construction production systems that affect project performance and company financial performance.

Similar Papers
  • Research Article
  • Citations47

Production System Loading–Cycle Time Relationship in Residential Construction

  • Jan 01, 2005
  • Journal of Construction Engineering and Management
  • Howard H Bashford +2
  • Research Article
  • Citations1

공공건설사업의 건설사업관리방식 선정 방법에 관한 연구

  • Sep 30, 2013
  • Korean Journal of Construction Engineering and Management
  • Kwan-Su Kim +2
  • Research Article
  • Citations64

Investigation of temperature effects from LCO2 with different cycle parameters on the coal pore variation based on infrared thermal imagery and low-field nuclear magnetic resonance

  • Nov 28, 2017
  • Fuel
  • Jizhao Xu +4
  • Research Article
  • Citations85

Simple performance models for integrated processing tools

  • Jan 01, 1996
  • IEEE Transactions on Semiconductor Manufacturing
  • S.C Wood
  • PDF
  • Research Article
  • Citations19

Industrial-Scale Experimental Study on the Thermal Oxidation of Ventilation Air Methane and the Heat Recovery in a Multibed Thermal Flow-Reversal Reactor

  • Jun 15, 2018
  • Energies
  • Bo Lan +3
  • Research Article
  • Citations8

Phenotypic relationships between maternal energy metabolism and lamb body weight development during lactation for pure- and crossbred sheep populations in low and high input production systems

  • Dec 10, 2019
  • Small Ruminant Research
  • J Reintke +5
  • Research Article
  • Citations4

Production systems with cycle overrun: modelling, analysis, improvability and bottlenecks

  • Aug 31, 2021
  • International Journal of Production Research
  • Yongsoon Eun +2
  • Book Chapter

The Smart City Production System

  • Jun 30, 2017
  • Smart Cities
  • Gary Graham +3
  • Research Article
  • Citations2

Application of System Dynamics Simulation to Assess System Productivity of Forest Harvesting Systems: A Case Study from Japan

  • Apr 25, 2025
  • Forests
  • Tetsuhiko Yoshimura +2
  • Research Article
  • Citations10

Insights into the digitalization-performance relationship: the role of flexibility and quality enhancing organizational practices

  • Jan 18, 2024
  • Production Planning & Control
  • Alba Manresa +3
  • Conference Article
  • Citations5

Applications of on-product diffraction-based focus metrology in logic high volume manufacturing

  • Mar 08, 2016
  • Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE
  • Ben F Noyes +7
  • Research Article
  • Citations11

General structure and characteristics of quick response production system

  • Dec 01, 1998
  • Computers & Industrial Engineering
  • M Kuroda +1
  • Research Article
  • Citations1

Construction Management Performance Under Dual Services Agreements

  • Dec 01, 1987
  • Journal of Construction Engineering and Management
  • C E Haltenhoff
  • Research Article
  • Citations11

Study of problems caused by oversized boulders in a mine production system: A case study

  • Jan 01, 1997
  • International Journal of Surface Mining, Reclamation and Environment
  • Uday Kumar
  • PDF
  • Book Chapter
  • Citations1

Production and Quality Management for SDGs

  • Dec 03, 2022
  • Kenichi Nakashima
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.