A decision framework is introduced to assist municipal engineers and planners to optimize decisions regarding the renewal of large infrastructure assets such as water transmission pipes, trunk sewers, or other assets with high costs of failure, inspection, and condition assessment. The proposed decision framework identifies a need for immediate intervention or, alternatively, enables optimization of the scheduling of the next inspection and condition assessment. The deterioration of the asset is modeled as a semi-Markov process and is thereby discretized into condition states. The waiting times in each state are assumed to be random variables with “known” probability distributions. If pertinent data are scarce (as is typical in most municipalities) these probability distributions can be initially derived based on expert opinion. These distributions will then be continually updated as observed deterioration data are collected over time. Monte Carlo simulation is used to calculate the distributions of the cumulative waiting times. Conditional survival probabilities are used to compile age-dependent transition probability matrices in the various states. The expected discounted total cost associated with an asset (including cost of intervention, inspection, and failure) is computed as a function of time. The time to schedule the next inspection/condition assessment is when the total expected discounted cost is minimum. Immediate intervention should be planned if the time of minimum cost is less than a threshold period (2 to 3 years) away. A computer program is prepared for demonstration and proof of concept. The decision framework lends itself to a computer application fairly easily. Although usable in its current form, this paper identifies some issues that require as yet unavailable data as well as more research in order to develop the framework into a comprehensive application tool.

Similar Papers
  • Research Article
  • Citations6

Decision-Making Framework, Enhanced by Mutual Inspection for First-Stage Dam Construction Diversion Scheme Selection

  • Jan 01, 2020
  • Water Resources Management
  • Zida Song +2
  • Research Article
  • Citations52

Failure prediction and optimal scheduling of replacements in asbestos cement water pipes

  • Jun 01, 2008
  • Journal of Water Supply: Research and Technology-Aqua
  • Paul Davis +5
  • Research Article
  • Citations16

Fuzzy Markov development for buried transportation bridges

  • Oct 29, 2019
  • International Journal of Structural Integrity
  • Koorosh Gharehbaghi +4
  • Dissertation
  • Citations2

Investigation of data centric diagnostic techniques for transformer condition assessment

  • Jun 03, 2016
  • The University of Queensland
  • Yi Cui
  • PDF
  • Research Article
  • Citations20

Monte Carlo methods for improper target distributions

  • Jan 01, 2014
  • Electronic Journal of Statistics
  • Krishna B Athreya +1
  • Research Article
  • Citations34

Predictive Assessment of Fish Health and Fish Kills in the Neuse River Estuary Using Elicited Expert Judgment

  • Apr 01, 2004
  • Human and Ecological Risk Assessment: An International Journal
  • Mark E Borsuk
  • Research Article
  • Citations69

Optimal Inspection Scheduling of Steel Bridges Using Nondestructive Testing Techniques

  • May 01, 2006
  • Journal of Bridge Engineering
  • Hsin-Yang Chung +2
  • Conference Article
  • Citations7

Condition assessment and maintenance scheduling for distribution reclosers

  • Jan 01, 2010
  • Joe Warner +2
  • Conference Article
  • Citations1

Machine Learning-based Structural Health Monitoring and Condition Assessment for Long-span Bridges

  • Jan 01, 2020
  • Report
  • Yang Xu +5
  • Research Article
  • Citations7

Development of a new fuzzy exposure model

  • Aug 19, 2009
  • Progress in Nuclear Energy
  • Wagner Eustaquio De Vasconcelos +2
  • Conference Article
  • Citations2

Evaluation on radiant characteristics of a honeycombed surface by Monte Carlo simulation

  • Oct 01, 2010
  • Hong Zhang +1
  • Research Article
  • Citations6

Monte Carlo simulation in a financial strategy for urban development using land value capture

  • May 10, 2019
  • Journal of Property Investment & Finance
  • David M Vetter +1
  • PDF
  • Research Article
  • Citations28

Monte Carlo vs. Fuzzy Monte Carlo Simulation for Uncertainty and Global Sensitivity Analysis

  • Mar 31, 2017
  • Sustainability
  • Young-Jin Kim
  • Research Article
  • Citations55

A Monte Carlo method for calculating Bayesian uncertainties in internal dosimetry

  • Aug 04, 2008
  • Radiation Protection Dosimetry
  • M Puncher +1
  • Research Article
  • Citations32

Modeling data envelopment analysis by chance method in hybrid uncertain environments

  • Nov 13, 2009
  • Mathematics and Computers in Simulation
  • Rui Qin +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.