• Home
  • Search
  • SETTING SAFETY LEADTIMES FOR PURCHASED COMPONENTS IN ASSEMBLY SYSTEMS
  • Cite Icon59
  • https://doi.org/10.1080/07408179308964272Copy DOI Icon

SETTING SAFETY LEADTIMES FOR PURCHASED COMPONENTS IN ASSEMBLY SYSTEMS

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

We consider the problem of setting appropriate safety leadtimes in an assembly system where all components are purchased and the only manufacturing operation is final assembly. First, we describe two formulations of this problem: (1) minimize total inventory carrying and tardiness costs and (2) minimize inventory carrying costs subject to a service constraint. Second, we discuss how these formulations sometimes fail to adequately provide a decision maker with sufficient information to establish leadtimes when applied independently but how they can be used together to provide a useful decision support system. Finally, we describe a procedure similar to ABC analysis that allows us to solve a much smaller related problem whose solution provides a good approximation to the solution of the original problem. We conclude the paper with numerical examples and a discussion of an actual implementation.

Similar Papers
  • Conference Article

Scheduling optimization of capacitated lot sizing problem based on immune complement algorithm

  • Jun 01, 2010
  • Zhihong Cheng +3
  • Research Article
  • Citations122

Multiple-method analysis of logistics costs

  • Jan 25, 2012
  • International Journal of Production Economics
  • Janne Engblom +3
  • Single Book
  • Citations52

Applied Decision Support with Soft Computing

  • Jan 01, 2003
  • Xinghuo Yu +1
  • Research Article
  • Citations3

Research on automatic assembly technology for final assembly of helicopter fuselage

  • Oct 01, 2019
  • IOP Conference Series: Materials Science and Engineering
  • Q D Xiao +3
  • Book Chapter

Decision-Maker Modeling for Decision Support Application

  • Jan 01, 2014
  • Frontiers in artificial intelligence and applications
  • ÖLmez Manuela +1
  • Conference Article
  • Citations2

Statistical Method for Error Prediction in Decision Support and Control Systems

  • Mar 14, 2017
  • Manuel Aghito
  • Research Article
  • Citations20

A new method for automatic shaft-hole assembly of aircraft components

  • Feb 06, 2017
  • Assembly Automation
  • Junxia Jiang +2
  • Research Article
  • Citations3

Decision Support System Research and Development Network for Agricultural and Natural Resource Management in Thailand: A TRF-DSS Experience

  • Jan 01, 2012
  • Southeast Asian studies
  • Attachai Jintrawet +21
  • Research Article

Drivers and barriers to DSS adoption in European crop protection: insights from a machine learning analysis of farmer and advisor surveys

  • Mar 26, 2026
  • Frontiers in Sustainable Food Systems
  • Margherita Furiosi +5
  • Research Article
  • Citations2

Naturally Grouped Assembly Work and New Product Structures

  • Oct 08, 2017
  • International Journal of Technology Management
  • Tomas Engström +1
  • Research Article
  • Citations11

TOPSIS for mobile based group and personal decision support system

  • Feb 15, 2021
  • Register: Jurnal Ilmiah Teknologi Sistem Informasi
  • Ratih Kartika Dewi +4
  • Research Article
  • Citations455

Changing systems for supporting farmers' decisions: problems, paradigms, and prospects

  • Apr 19, 2002
  • Agricultural Systems
  • R.L Mccown
  • PDF
  • Research Article
  • Citations7

Evaluating the Effectiveness of Decision Support System: Findings and Comparison

  • Jan 01, 2018
  • International Journal of Advanced Computer Science and Applications
  • Ayman G Fayoumi
  • Research Article
  • Citations2

Normative or Confirmative: Effects of Information Quality and Redundancy in Decision Support Systems

  • Nov 27, 2024
  • Human Factors
  • Yoav Ben Yaakov +3
  • PDF
  • Research Article
  • Citations29

Do decision support systems influence variation in prescription?

  • Jan 30, 2009
  • BMC Health Services Research
  • Judith D De Jong +4
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.