• Home
  • Search
  • Simulation-based work load and job release control for semiconductor manufacturing
  • Cite Icon3
  • https://doi.org/10.1109/cdc.2015.7403376Copy DOI Icon

Simulation-based work load and job release control for semiconductor manufacturing

  • Dec 1, 2015
  • Keiichiro Urayama +2 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Cycle time and capacity management are two of the most important issues for manufacturing companies, particularly in a dynamic business environment. The goal is to meet customer delivery dates while minimizing manufacturing cost. Semiconductor manufacturing involves a large number of process steps, reentrant process flows and long production cycle times. In addition, technological innovation in the semiconductor industry is rapid, resulting in shorter product life cycles. Thus, semiconductor manufacturing companies must continually invest in order to keep pace with new technology and update their equipment to produce new products. These conditions make cycle time and capacity management more important for semiconductor manufacturing companies. For the purpose of stable control of cycle time and capacity, there have been many studies dealing with semiconductor manufacturing shop floor control. This paper focuses on job release control, which aims to keep the work load stable and meet customer delivery dates in the presence of dynamic demand fluctuations. We introduce a hierarchical control model which consists of two layers: a long-term capacity decision model and a short-term job release control model. Parameters of the proposed linear programming (LP) models are estimated using simulation, which acts as an intermediate layer between the two layers. Numerical experiments on a mini-fab demonstrate the potential gains from using our model, which achieves improved customer delivery and shorter cycle time relative to several conventional job release policies.

Similar Papers
  • Conference Article
  • Citations2

Dynamic average method for cycle time estimator in an IC fab

  • Jun 16, 1998
  • Han-Pang Huang +4
  • Research Article
  • Citations26

Understanding a semiconductor process using a full-scale model

  • May 01, 2002
  • IEEE Transactions on Semiconductor Manufacturing
  • J Hunter +3
  • Conference Article
  • Citations7

Conveyer Belt Model to Analyze Cycle Time Conditions in a Semiconductor Manufacturing Line

  • Sep 01, 2006
  • Toshikazu Inoue +5
  • Research Article

Cycle Time Study in Improving Production Output in the Garment Industry Sewing Line

  • Jun 27, 2024
  • Jurnal Sains dan Aplikasi Keilmuan Teknik Industri (SAKTI)
  • Mayesti Kurnianingtias +4
  • Book Chapter

Nonparametric Inter-Quartile Range for Error Evaluation and Correction of Demand Forecasting Model under Short Product Lifecycle

  • Jan 01, 2009
  • Wen-Rong Li +1
  • Research Article
  • Citations14

Setting defect charts control limits to balance cycle time and yield for a tandem production line

  • Jun 02, 2014
  • Computers & Operations Research
  • Miri Gilenson +2
  • Conference Article
  • Citations16

Modeling and analysis of semiconductor manufacturing plants using time Petri net models: COT business case study

  • Oct 12, 1997
  • Jongwook Kim +1
  • Conference Article
  • Citations2

<title>Integrated manufacturing approach to attain benchmark team performance</title>

  • Sep 16, 1994
  • Proceedings of SPIE, the International Society for Optical Engineering/Proceedings of SPIE
  • Shau-Ron Chen +2
  • Research Article
  • Citations38

Economics of on‐site vs. off‐site fabrication of rebar

  • Nov 01, 2006
  • Construction Management and Economics
  • Gul Polat +3
  • Research Article
  • Citations29

The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing

  • Nov 17, 2004
  • International Journal of Production Economics
  • George Kenyon +2
  • Research Article
  • Citations18

Decomposition without aggregation for performance approximation in queueing network models of semiconductor manufacturing

  • Feb 19, 2019
  • International Journal of Production Research
  • Jinho Shin +3
  • Research Article
  • Citations47

Multiple response optimization in a fully automated FAB: an integrated tool and vehicle dispatching strategy∗

  • Dec 29, 2003
  • Computers & Industrial Engineering
  • Jonah C Tyan +3
  • Conference Article
  • Citations21

Improving the performance of dispatching rules in semiconductor manufacturing by iterative simulation

  • Dec 05, 2004
  • Lars Mönch +1
  • Supplementary Content
  • Citations17

Scheduling setup changes at bottleneck workstations in semiconductor manufacturing

  • Oct 01, 2006
  • Production Planning & Control
  • Z Duwayri +3
  • Book Chapter
  • Citations20

Comparison of Dispatching Rules for Reducing the Mean and Variability of Cycle Times in Semiconductor Manufacturing

  • Jan 01, 2000
  • Manfred Mittler +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.