• Home
  • Search
  • Simulation tool for manpower forecast loading and resource leveling
  • Cite Icon11
  • https://doi.org/10.1109/wsc.2007.4419842Copy DOI Icon

Simulation tool for manpower forecast loading and resource leveling

  • Dec 1, 2007
  • Mikhail Hanna +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

Large scale/mega projects are lengthy complex endeavors that require significant planning by management, engineers and construction personnel to ensure the success of the project. When we examine the state of mega projects today, we are faced with a real crisis. Companies, both client and contractor, are reporting significant cost and schedule overruns. Lack of project scope definition and planning are the primary characteristics of this problem. Computer simulation is a powerful tool for analyzing complex and dynamic scenarios. It provides an appealing approach for the analysis of repetitive processes. Simulation helps decision makers identify different possible options by analyzing enormous amounts of data. Hence, computer simulation can be used effectively to analyze the resource loading and manpower requirements needed to complete a task in a given time frame, based on current progress levels. This paper discusses a special- purpose simulation (SPS) tool for optimization of manpower forecast loading and resource leveling. The simulation model is capable of optimizing resource requirements for a petrochemical project, based on standard discipline requirements and involvements. Tests of this simulation tool have produced exceptional results; currently, the system is being modified to incorporate historical data within the simulation.

Similar Papers
  • Conference Article
  • Citations24

Optimization of Traffic Signal Light Timing Using Simulation

  • Apr 05, 2005
  • K.N Hewage +1
  • Conference Article

The Impact of Regulatory Licensing Processes on U.S. Civilian Nuclear Power Plant Project Performance

  • May 04, 2010
  • Timothy R B Taylor +2
  • Supplementary Content
  • Citations1

The irony of coal mining infrastructure projects: the more talk about cost, the more they cost

  • Jan 06, 2021
  • University of Southern Queensland ePrints (University of Southern Queensland)
  • Benjamin Skerman
  • Conference Article

Modeling, Simulation, and Visualization Environment to Support Independent Verification and Validation of Artemis 1 Separation Events

  • Jul 31, 2023
  • Paul Tartabini +9
  • Research Article
  • Citations10

Thermal and Optical Analyses of a Hybrid Solar Photovoltaic/Thermal (PV/T) Collector with Asymmetric Reflector: Numerical Modeling and Validation with Experimental Results

  • Jun 21, 2023
  • Sustainability
  • Dimitrios N Korres +3
  • Research Article
  • Citations48

Numerical analysis of punching failure in reinforced concrete structures

  • Jan 01, 1994
  • Infoscience (Ecole Polytechnique Fédérale de Lausanne)
  • Philippe Menétrey
  • PDF
  • Research Article
  • Citations16

Schedule overruns as a barrier for liquefied natural gas projects: A review of the literature and research agenda

  • Feb 13, 2019
  • Energy Reports
  • Munmun Basak +2
  • Research Article
  • Citations16

Impact of Public Policy and Societal Risk Perception on U.S. Civilian Nuclear Power Plant Construction

  • Dec 08, 2011
  • Journal of Construction Engineering and Management
  • Timothy R B Taylor +2
  • PDF
  • Research Article
  • Citations3

Application of Systems Simulation for Predicting and Optimising Energy Requirements for HDF Production

  • Oct 07, 2015
  • Journal of Industrial Engineering
  • Cristina Maria Luminea +2
  • Research Article

Addressing the productivity challenge using a build, own, operate, maintain (BOOM) contracting model

  • Jan 01, 2014
  • The APPEA Journal
  • Geoff Bird +1
  • Research Article
  • Citations2

Performance evaluation of multilevel multiphase inverters by piece-wised linearized simulation models

  • May 07, 2024
  • Automatika
  • Jakub Simcak +2
  • PDF
  • Research Article
  • Citations1

GESDB: a platform of simulation resources for genetic epidemiology studies

  • Jan 01, 2016
  • Database: The Journal of Biological Databases and Curation
  • Po-Ju Yao +1
  • Book Chapter
  • Citations8

Multi-scale modeling of biomaterials and tissues

  • Jan 01, 2013
  • Alfonso Gautieri +1
  • Single Report
  • Citations1

INDOT Project Change Orders: Root Causes and Recommendations

  • Jan 01, 2024
  • Suyash Padhye +6
  • Research Article
  • Citations21

Plugging the Gaps’ Between Optimum Bias and Strategic Misrepresentation and Infrastructure Cost Overruns

  • Jan 01, 2011
  • Procedia Engineering
  • P.E.D Love
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.