• Home
  • Search
  • Single machine scheduling with uncertain release times
  • Cite Icon2
  • https://doi.org/10.23919/chicc.2017.8027777Copy DOI Icon

Single machine scheduling with uncertain release times

  • Jul 1, 2017
  • Fan Yue +3 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper establishes a robust optimization model and proposes constraint generation algorithm to solve a robust single machine scheduling problem with random release times. The performance criterion of interest is the maximum waiting time (MWT) over all jobs. Unlike the traditional stochastic programming model which requires exact distributions, our robust optimization model needs only the information of release time intervals. We formulate this uncertain optimization problem as a 0–1 linear programming model with a large number of constraints. To solve the model efficiently, a constraint generation algorithm (CGA) is proposed which generate constraint iteratively to obtain the optimal solution. The robustness of the optimal sequence under various probability distributions of release times is verified by simulation. Extensive computational experiments are implemented to demonstrate the effectiveness and efficiency of the proposed solution method.

Similar Papers
  • Research Article
  • Citations69

A robust optimization framework for energy management of CCHP users with integrated demand response in electricity market

  • Apr 12, 2022
  • International Journal of Electrical Power & Energy Systems
  • Lingmin Chen +4
  • Research Article
  • Citations35

Robust Optimization of Signal Control Parameters for Unsaturated Intersection Based on Tabu Search-Artificial Bee Colony Algorithm

  • Jan 01, 2018
  • IEEE Access
  • Wei Hao +4
  • Research Article
  • Citations25

Distributional robustness and lateral transshipment for disaster relief logistics planning under demand ambiguity

  • Nov 03, 2022
  • International Transactions in Operational Research
  • Duo Wang +3
  • Research Article
  • Citations3

Low‐carbon economic operation of multi‐energy microgrid based on multi‐level robust optimisation

  • Jul 21, 2024
  • IET Energy Systems Integration
  • Wenwen He +5
  • Research Article
  • Citations120

Energy-efficient bi-objective single-machine scheduling with power-down mechanism

  • Apr 12, 2017
  • Computers & Operations Research
  • Ada Che +3
  • Book Chapter
  • Citations2

A Robust Optimization Model for Closed-Loop Supply Chain Network Under Uncertain Returns

  • Jan 01, 2019
  • Changqiong Wang +3
  • Research Article
  • Citations2

Distributionally robust single machine scheduling with release and due dates over Wasserstein balls

  • Nov 12, 2024
  • Computers and Operations Research
  • Haimin Lu +3
  • Research Article
  • Citations15

Coordination of preventive and emergency dispatch in renewable energy integrated power systems under extreme weather

  • Nov 30, 2023
  • IET Renewable Power Generation
  • Rong Junjie +3
  • Research Article

Fuzzy Solution of Z-Number-Based Multi-Objective Linear Programming Models with Different Membership Functions

  • Oct 07, 2025
  • International Journal of Basic and Applied Sciences
  • Pandit Shinde +2
  • Research Article
  • Citations5

Coping with shortages caused by disruptive events in automobile supply chains

  • Mar 15, 2021
  • Naval Research Logistics (NRL)
  • Yi Jiang +2
  • Book Chapter
  • Citations34

Robust Linear Programming with Right-Hand-Side Uncertainty, Duality and Applications

  • Jan 01, 2008
  • Encyclopedia of Optimization
  • Michel Minoux
  • PDF
  • Research Article
  • Citations3

A ROBUST OPTIMIZATION MODEL WITH TWO UNCERTAINTIES APPLIED TO SUPPLIER SELECTION

  • Dec 15, 2022
  • Technological and Economic Development of Economy
  • Z H Che +2
  • Research Article
  • Citations47

A robust dynamic scheduling approach based on release time series forecasting for the steelmaking-continuous casting production

  • Apr 03, 2020
  • Applied Soft Computing
  • Jianyu Long +5
  • Research Article
  • Citations118

Robust optimization and mixed-integer linear programming model for LNG supply chain planning problem

  • Apr 29, 2019
  • Soft Computing
  • Arun Kumar Sangaiah +3
  • Research Article
  • Citations5

Robust optimization of EMU brake module based on interval analysis

  • Oct 05, 2021
  • Multidiscipline Modeling in Materials and Structures
  • Yonghua Li +2
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.