Single-machine two-agent scheduling involving a just-in-time criterion

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

We study a set of single-machine two-agent scheduling problems where the performance measure of the first agent, , is the weighted number of jobs completed exactly at the due date, i.e. completed in a just-in-time mode. The performance measure of the second agent, , is either the makespan, the total completion times or the weighted number of jobs completed exactly at the due date. For each combination of performance measures of the two agents, we study four different variations of the problem. We show that all four-problem variations are strongly -hard for when the performance measure of the second agent is either the makespan or the total completion time, even if all of the first agent’s weights are equal. We also study the special case of these problems where the job processing times of the second agent are all equal. For this special case, we prove that three variations of this problem are ordinary -hard with respect to the instance size, while all four problem variations are polynomial solvable with respect to the number of jobs. For the problem where the performance measure of both agents is the weighted number of jobs completed at the due date, we show that one problem variation is solvable in polynomial time, while all other three variations are ordinary -hard.

Similar Papers
  • Research Article
  • Citations70

Single-machine scheduling with past-sequence-dependent setup times and effects of deterioration and learning

  • May 08, 2008
  • The International Journal of Advanced Manufacturing Technology
  • Ji-Bo Wang +2
  • Research Article
  • Citations19

Solving the single machine scheduling problem with general job-dependent past-sequence-dependent setup times and learning effects

  • Jan 01, 2012
  • European J. of Industrial Engineering
  • H.M Soroush
  • Research Article
  • Citations14

Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work

  • Jun 28, 2023
  • Omega
  • Yao-Wen Sang +3
  • Conference Article
  • Citations5

Scheduling jobs with multitasking and asymmetric switching costs

  • Oct 01, 2017
  • Kevin I.-J Ho +1
  • Research Article
  • Citations23

Two-agent scheduling problems under rejection budget constraints

  • Jul 23, 2020
  • Omega
  • Daniel Oron
  • Research Article
  • Citations52

Single-machine scheduling against due dates with past-sequence-dependent setup times

  • Dec 01, 2008
  • European Journal of Operational Research
  • Dirk Biskup +1
  • Research Article
  • Citations10

Single machine scheduling with deadlines, release and due dates

  • Jan 01, 1997
  • Optimization
  • Valery Gordon +2
  • Research Article
  • Citations20

Scheduling with controllable release dates and processing times: Total completion time minimization

  • Dec 01, 2006
  • European Journal of Operational Research
  • T.C Edwin Cheng +2
  • Research Article
  • Citations29

Optimal restricted due date assignment in scheduling

  • Dec 31, 2015
  • European Journal of Operational Research
  • Dvir Shabtay
  • Research Article
  • Citations2

Distributionally robust single machine scheduling with release and due dates over Wasserstein balls

  • Nov 12, 2024
  • Computers and Operations Research
  • Haimin Lu +3
  • Research Article
  • Citations5

Methods for virtual machine scheduling with uncertain execution times in cloud computing

  • Sep 07, 2017
  • International Journal of Machine Learning and Cybernetics
  • Haiyan Xu +1
  • Research Article
  • Citations6

Proportionate Flow Shop Scheduling with Multi-agents to Maximize Total Gains of JIT Jobs

  • Oct 26, 2017
  • Arabian Journal for Science and Engineering
  • Shi-Sheng Li +2
  • Research Article
  • Citations40

Impact of learning and fatigue factors on single machine scheduling with penalties for tardy jobs

  • Mar 01, 1998
  • European Journal of Operational Research
  • V Reddy Dondeti +1
  • Research Article
  • Citations120

Energy-efficient bi-objective single-machine scheduling with power-down mechanism

  • Apr 12, 2017
  • Computers & Operations Research
  • Ada Che +3
  • Research Article
  • Citations91

Single machine scheduling and due date assignment with positionally dependent processing times

  • Oct 01, 2009
  • European Journal of Operational Research
  • Valery S Gordon +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.