• Home
  • Search
  • SIP messages delay analysis in heterogeneous network
  • Cite Icon9
  • https://doi.org/10.1109/icwcsc.2010.5415913Copy DOI Icon

SIP messages delay analysis in heterogeneous network

  • Jan 1, 2010
  • Rashid Mahmood +1 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The performance of signaling protocols in circuit and packet switching networks is a significant parameter to evaluate the performance of any telecom operator. Today, users demand continuous high data rate, service availability, network reliability, mobility, QoS and minimum service initialization time. IP Multimedia Subsystem (IMS) standardized Session Initiation Protocol (SIP), which categorize as a signaling protocol for management and maintenance of new multimedia IP-based services. Session setup time for the interactive and real-time application has become major QoS parameter to assess the performance of these applications. In the context of this communication application, in this paper, we analyze the performance of session setup time of SIP protocol over IMS network with different access networks (GSM, WLAN and PSTN). We measure and compare mean delay of each SIP message during session setup over these access networks. We also measure the mean delay with respect to distance of nodes in the network. Our results show that SIP message size, processing, transmission, queuing delay, transition from packet to switched network, node mobility and wireless channel have a consequence on the reliability, performance and efficiency of the protocol.

Similar Papers
  • Research Article
  • Citations3

IMS network signaling peering: Challenges and proposal

  • Feb 27, 2008
  • Bell Labs Technical Journal
  • Jean-Philippe Joseph
  • Conference Article
  • Citations7

An analysis of session setup time in internet multimedia subsystem (IMS) with EV-DO (rev. a) wireless links

  • Feb 13, 2006
  • M Melnyk +1
  • Conference Article
  • Citations3

Congestion avoidance in S-CSCF selection in an IMS network

  • Sep 01, 2010
  • Plarent Tirana +1
  • Conference Article
  • Citations1

Analysis of intra-cell handover procedures into the power consumption during a voice LTE call over IMS network

  • Dec 12, 2022
  • Caio Bruno Bezerra De Souza +5
  • Conference Article

Tensor model of IMS network

  • Oct 01, 2012
  • Dmitriy Ponomarev
  • Conference Article
  • Citations3

Dimensioning traffic performance in IMS network

  • Oct 01, 2014
  • B A Alassane +1
  • Research Article
  • Citations21

Distributed intrusion detection scheme for next generation networks

  • Aug 26, 2019
  • Journal of Network and Computer Applications
  • Jamila Manan +4
  • Conference Article
  • Citations5

Call and messaging performance comparison between IMS and SIP networks

  • Dec 01, 2010
  • Jari Kellokoski +4
  • Conference Article
  • Citations5

A Group Based Service Triggering Algorithm for IMS Network

  • Jun 01, 2009
  • Z Xun +4
  • Book Chapter
  • Citations3

Wireless Multimedia in 3G Networks

  • Jul 15, 2005
  • George Xylomenos +1
  • Conference Article
  • Citations2

A Dynamic Routing Algorithm for Managing CSCF Agents in the IMS Network

  • Jan 01, 2009
  • Ji-Hyun Hwang +2
  • Research Article
  • Citations4

Domain management of IMS

  • Mar 07, 2006
  • Bell Labs Technical Journal
  • Denise M Ward +5
  • Research Article
  • Citations7

IMS management and monitoring with eTOM framework and composite web service

  • Jan 01, 2011
  • International Journal of Multimedia Intelligence and Security
  • Raouyane Brahim +3
  • Conference Article
  • Citations9

New Joint Dual Mobile Service Discovery-Exposure Model using Bipartite Graph

  • Nov 01, 2015
  • Walid El Ayeb +1
  • Conference Article
  • Citations42

"IMS in a Bottle": Initial Experiences from an OpenSER-based Prototype Implementation of the 3GPP IP Multimedia Subsystem

  • Dec 01, 2006
  • Joachim Fabini
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.