• Home
  • Search
  • Solution strategies for multi-stage wafer probing scheduling problem with reentry
  • Cite Icon17
  • https://doi.org/10.1057/palgrave.jors.2602354Copy DOI Icon

Solution strategies for multi-stage wafer probing scheduling problem with reentry

Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

The multi-stage wafer probing scheduling problem (M-WPSP) with reentry is a practical variation of the parallel-machine scheduling problem. Since the M-WPSP involves multiple product families, to be processed on multiple stages, with various job due dates, ready times, reentry, serial and batch operations, sequential-dependent setup time, it is more difficult to solve than the classical parallel-machine scheduling problems. In this paper, we consider two strategies to solve the M-WPSP with reentry, where the total machine workload must be minimized. These two strategies incorporate a global planning mechanism, in advance, to determine the required stage due date of job at each process stage to prevent the due date problems occurring at the final stage. The sequential strategy schedules the jobs at the required stages according to the sequence of manufacturing process. The parallel strategy is designed specifically for the reentrant characteristic. To evaluate the efficiency of the proposed strategies, a set of test problems involving four critical factors, the product family ratio, the temperature-change consideration, the tightness of due dates, and the ready time, are designed to test the quality of solutions under two levels of workload.

Similar Papers
  • Research Article
  • Citations16

Minimizing the total machine workload for the wafer probing scheduling problem

  • Feb 01, 2002
  • IIE Transactions
  • W.L Pearn +2
  • Research Article
  • Citations25

A scheduling problem for PCB assembly: a case with multiple lines

  • Oct 24, 2008
  • The International Journal of Advanced Manufacturing Technology
  • Yongzhong Wu +1
  • Research Article
  • Citations187

Job shop scheduling with modified due dates

  • Nov 01, 1983
  • Journal of Operations Management
  • Kenneth R Baker +1
  • Research Article
  • Citations43

Common due date assignment and scheduling with ready times

  • Jul 30, 2002
  • Computers & Operations Research
  • T.C.E Cheng +2
  • Research Article
  • Citations40

Approximate dynamic programming for an energy-efficient parallel machine scheduling problem

  • Dec 31, 2021
  • European Journal of Operational Research
  • Mojtaba Heydar +2
  • Research Article
  • Citations8

Self-growth learning-based machine scheduler to minimize setup time and tardiness in OLED display semiconductor manufacturing

  • Jul 06, 2023
  • Applied Soft Computing
  • Donghun Lee +2
  • Research Article
  • Citations29

Optimal restricted due date assignment in scheduling

  • Dec 31, 2015
  • European Journal of Operational Research
  • Dvir Shabtay
  • Research Article
  • Citations19

Scheduling Position-Dependent Maintenance Operations

  • Dec 01, 2017
  • Operations Research
  • Maciej Drozdowski +2
  • Conference Article
  • Citations2

Comparisons of three mixed integer programming models for parallel machine scheduling

  • Dec 01, 2016
  • Shan-Hao Yu +1
  • Research Article
  • Citations6

A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights

  • May 25, 2022
  • Asia-Pacific Journal of Operational Research
  • Xinyu Sun +3
  • Research Article
  • Citations444

A survey of problems, solution techniques, and future challenges in scheduling semiconductor manufacturing operations

  • Jan 07, 2011
  • Journal of Scheduling
  • Lars Mönch +4
  • Research Article
  • Citations231

A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines

  • Apr 12, 2002
  • Computers & Operations Research
  • Jeffery K Cochran +2
  • Research Article
  • Citations13

Heuristics to minimize the completion time variance of jobs on a single machine and on identical parallel machines

  • May 26, 2016
  • The International Journal of Advanced Manufacturing Technology
  • Raju Rajkanth +2
  • Conference Article
  • Citations16

A Multi-objective Fuzzy Genetic Algorithm for Job-shop Scheduling Problems

  • Nov 01, 2006
  • Y.J Xing +3
  • Research Article
  • Citations36

On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties

  • Jan 30, 2003
  • Computers & Operations Research
  • Volker Lauff +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.