  • Solving a Production Scheduling Problem by Means of Two Biobjective Metaheuristic Procedures
  • https://doi.org/10.1063/1.3273673Copy DOI Icon

Solving a Production Scheduling Problem by Means of Two Biobjective Metaheuristic Procedures

Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

Production planning and scheduling problems emphasize the need for the availability of management tools that can help to assure proper service levels to customers, maintaining, at the same time, the production costs at acceptable levels and maximizing the utilization of the production facilities. In this case, a production scheduling problem that arises in the context of the activities of a company dedicated to the manufacturing of furniture for children and teenagers is addressed. Two bicriteria metaheuristic procedures are proposed to solve the sequencing problem in a production equipment that constitutes the bottleneck of the production process of the company. The production scheduling problem can be characterized as a general flow shop with sequence dependant setup times and additional inventory constraints. Two objectives are simultaneously taken into account when the quality of the candidate solutions is evaluated: the minimization of completion time of all jobs, or makespan, and the minimization of the total flow time of all jobs. Both procedures are based on a local search strategy that responds to the structure of the simulated annealing metaheuristic. In this case, both metaheuristic approaches generate a set of solutions that provides an approximation to the optimal Pareto front. In order to evaluate the performance of the proposed techniques a series of experiments was conducted. After analyzing the results, it can be said that the solutions provided by both approaches are adequate from the viewpoint of the quality as well as the computational effort involved in their generation. Nevertheless, a further refinement of the proposed procedures should be implemented with the aim of facilitating a quasi‐automatic definition of the solution parameters.

Similar Papers
  • Research Article
  • Citations2

Near optimal and optimal solutions for an integrated employee timetabling and production scheduling problem

  • Jan 01, 2009
  • IFAC Proceedings Volumes
  • O Guyon +3
  • Research Article
  • Citations1

Solving production scheduling problems using advanced model checking tools

  • Jan 01, 2006
  • International Journal of Computer Applications in Technology
  • Dimitrios Panopoulos +1
  • Research Article
  • Citations28

A developed genetic algorithm for solving the multi-objective supply chain scheduling problem

  • Jan 09, 2018
  • Kybernetes
  • Ali Borumand +1
  • Research Article
  • Citations2

Augmented ɛ ‐constraint‐based matheuristic methodology for Bi‐objective production scheduling problems

  • Oct 09, 2024
  • IET Collaborative Intelligent Manufacturing
  • Jiaxin Fan
  • Research Article

Robustness price of open-pit mine production scheduling

  • Dec 01, 2020
  • SHILAP Revista de lepidopterología
  • Aref Alipour +3
  • Research Article
  • Citations12

Production scheduling problem in a factory of automobile component primer painting

  • Jan 02, 2020
  • Journal of Intelligent Manufacturing
  • Ivan Kristianto Singgih +4
  • Research Article
  • Citations10

Multi‐objective flow shop scheduling using hybrid simulated annealing

  • Aug 31, 2010
  • Measuring Business Excellence
  • Ashwani Dhingra +1
  • Research Article
  • Citations25

A two-stage coupled algorithm for an integrated maintenance planning and flowshop scheduling problem with deteriorating machines

  • Jan 20, 2015
  • Journal of Scheduling
  • Maliheh Aramon Bajestani +1
  • Research Article
  • Citations11

An enhanced MPS solution for FMS using GAs

  • Sep 01, 2001
  • Integrated Manufacturing Systems
  • K.W Keung +2
  • Research Article
  • Citations19

Optimization based scheduling for a class of production systems with integral constraints

  • Dec 01, 2009
  • Science in China Series E: Technological Sciences
  • Xiaohong Guan +3
  • Conference Article
  • Citations2

Lean production and transportation scheduling for dynamic supply chain management

  • Jul 01, 2010
  • Yoshitaka Tanimizu +4
  • Research Article
  • Citations30

An artificial immune system for solving production scheduling problems: a review

  • Jun 03, 2011
  • Artificial Intelligence Review
  • Ahmad Shahrizal Muhamad +1
  • Research Article
  • Citations7

Detailed scheduling of batch production in a cell with parallel facilities and common renewable resources

  • Oct 01, 1995
  • Computers & Industrial Engineering
  • Khalil S Hindi +1
  • Research Article
  • Citations45

The impact of lot sizing and sequencing on manufacturing performance in a two-stage hybrid flow shop

  • Nov 01, 1996
  • International Journal of Production Research
  • H Tsubone∗ +2
  • Research Article
  • Citations224

A Linear Programming Approach to Production and Employment Scheduling

  • Jan 01, 1960
  • Management Science
  • Fred Hanssmann +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.