- https://doi.org/10.1049/icp.2025.4464
Solving the multi-cooperative agricultural machinery scheduling problem with soft time windows based on the improved BEVO-PS algorithm
- Jan 1, 2026
- IET conference proceedings.
- Haotian Zhao +2 more
Scheduling of agricultural machinery during the busy season faces the challenges of multi-objective conflict and resource spatio-temporal mismatch, and traditional methods are difficult to balance the operation cost and time span optimisation. To this end, this study proposes an improved BEVO-PS (Bi-objective Energy Valley Optimization with Pareto Selection) algorithm, which incorporates α, β, and γ decay mechanisms to drive the particle swarms' adaptive global exploration, local exploitation, and neighbourhood search by constructing a multi-objective optimization framework, and introduces a Pareto selection strategy to enhance population diversity and convergence efficiency. The model integrates the constraints of soft time window, geographical location, area of operation and agricultural machinery resources of the area to be harvested, with the optimisation objective of minimising the total scheduling cost and time span. Simulation experiments based on 52 to-be-harvested zones with three cooperatives show that the Pareto frontier solution exhibits a significant cost-time span trade-off relationship, the minimum average cost continues to decrease in the iterations, and the cost and time span converge to the near-optimal solution simultaneously. The algorithm provides effective decision support for multi-cooperative agricultural machine scheduling and significantly improves resource synergy efficiency.
- # Agricultural Machinery
- # Soft Time Window
- # Pareto Selection
- # Time Span
- # Local Exploitation
- # Decision Support For Scheduling
- # Area Of Operation
- # Convergence Efficiency
- # Operation Time Span
- # Total Scheduling Time