Abstract The objective of this research and development program is to qualify for 3000 mWD the chemical injection pump, one of the main key components of the subsea chemical storage and injection station (SCS&I). The development of the SCS&I system responds to the need to develop oil and gas reservoirs at deeper water depths and further distances from host or from shore and to reduce CAPEX and GHG released associated. Indeed, one of the high CAPEX of a subsea project and a weak point during operation is the umbilical chemical lines. Storing the chemicals close to the wells will reduce the umbilical cross section and cost and avoid plugging of those lines. The development of the SCS&I is an enabler for "all electrical" simplified architecture, reducing both costs and GHG emissions. This qualification is a first for a high dosage chemical pump under subsea environmental conditions. The HAMPRO® 70V injection pump from Hammelmann was selected as the most promising pump for marinization and qualification for 3000 mWD. Its big advantage is that the contact between the oil used for lubrication and cooling of the pump and motor is separated from the chemical pumped fluid by sealed bellows. The other advantage is that its duty allows the injection of high rate, batch injected chemical products like methanol, and at the same time its design allows reducing the piston diameters and stroke giving the flexibility to inject low dosage chemical products. The pump has been modified for its marinization. For installation subsea, it is capital to ensure its robustness regarding the high external pressure and discharge pressure, but also reliability of the chemically exposed parts, the pump and motor rotating parts and the impact of lubricant performance, the reliability of the electrical components and finally the impact of transient behaviors on the pressure compensation system. To assure all these aspects, a complete R&D qualification program has been launched. This program includes short term batch operation with high flow rate and high differential pressure, long term continuous operation with low or high differential pressure and finally, transient operation with large variation in differential pressure but also different strokes imposed to the pump. The program is to be completed with a hyperbaric performance test and specific endurance tests performed to ensure the bellows robustness. For endurance testing, the pumps have already been running for more than 2000 hours. This paper will describe the main findings and support the qualification required for subsea use.

Similar Papers
  • Research Article
  • Citations54

Spectroscopic Study on Vibrational Nonequilibrium of a Microwave Discharge Nitrogen Plasma

  • Aug 01, 2004
  • Japanese Journal of Applied Physics
  • Shuji Koike +4
  • Conference Article

Test Campaign and Application Study for a High Pressure Compressor With Modular Rotor

  • Jun 26, 2023
  • Rainer Kurz +3
  • Conference Article
  • Citations2

Horizontal Underbalanced Drilling of Gas Wells with Coiled Tubing Challenges and Experiences

  • Mar 04, 1997
  • R Cox +2
  • Research Article
  • Citations2

Mass spectroscopic measuring of SiCln (n = 0–2) radicals in SiCl4 RF glow discharge plasma

  • Dec 01, 2007
  • Journal of Materials Science
  • Zhaokui Wang +1
  • Conference Article
  • Citations1

Exploring the Relevance of Corrosion Inhibitor Micelles to Improve Corrosion Management

  • Jun 18, 2018
  • A Osnowski +3
  • Research Article
  • Citations36

Laboratory evaluation of nitrogen injection for enhanced oil recovery: Effects of pressure and induced fractures

  • May 17, 2019
  • Fuel
  • Mehdi Fahandezhsaadi +5
  • Conference Article
  • Citations1

Synergy of Intelligent Wireline Formation Testing Platform Together with Drill Stem Testing to Unlock Hydrocarbon Potential in Asia Greenfield

  • May 12, 2025
  • D Ling +19
  • Research Article
  • Citations3

Successful Flow Testing of a Gas Reservoir in 3,500 ft of Water

  • Jul 01, 1992
  • Journal of Petroleum Technology
  • J.M Shaughnessy +3
  • Conference Article

Mitigation of Gas Condensate Banking Using an Integrated Chemical Approach

  • Dec 09, 2021
  • Amjed Mohammed Hassan +2
  • Conference Article

Looking for gas….in all the tight places

  • Jan 01, 2007
  • Mark Downey
  • Research Article
  • Citations4

Enhancing the energy efficiency of land vehicles air conditioning units through a new evaporative membrane cooler

  • Mar 22, 2024
  • Applied Thermal Engineering
  • Carlo Isetti +1
  • Conference Article

Digitalization and Remote Monitoring for CP and Chemical Injection in Gas Asset to Enhance Facilities Integrity

  • Nov 09, 2020
  • Mohamed Mubarak Al-Ghaferi +9
  • Conference Article
  • Citations3

Extended Reach Analysis of Coiled Tubing Assisted Radial Jet Drilling

  • Mar 16, 2020
  • Xing Qin +4
  • Conference Article
  • Citations1

Probabilistic Approach of Advanced Decline Curve Analysis for Tight Gas Reserves Estimation Obtained from Public Data Base

  • May 17, 2017
  • E T Jiménez +3
  • Research Article
  • Citations1

The Precise Prediction of the Turbulence Coefficient Based on Neural Network Modeling

  • Jan 01, 2013
  • Petroleum Science and Technology
  • M Mansoorifar +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.