Technical safety requirements control level verification

  • May 21, 1999
  • J.l Stewart
Show More
  • Abstract
  • Literature Map
  • Similar Papers
Abstract

A Technical Safety Requirement (TSR) control level verification process was developed for the Tank Waste Remediation System (TWRS) TSRs at the Hanford Site in Richland, WA, at the direction of the US. Department of Energy, Richland Operations Office (RL). The objective of the effort was to develop a process to ensure that the TWRS TSR controls are designated and managed at the appropriate levels as Safety Limits (SLs), Limiting Control Settings (LCSs), Limiting Conditions for Operation (LCOs), Administrative Controls (ACs), or Design Features. The TSR control level verification process was developed and implemented by a team of contractor personnel with the participation of Fluor Daniel Hanford, Inc. (FDH), the Project Hanford Management Contract (PHMC) integrating contractor, and RL representatives. The team was composed of individuals with the following experience base: nuclear safety analysis; licensing; nuclear industry and DOE-complex TSR preparation/review experience; tank farm operations; FDH policy and compliance; and RL-TWRS oversight. Each TSR control level designation was completed utilizing TSR control logic diagrams and TSR criteria checklists based on DOE Orders, Standards, Contractor TSR policy, and other guidance. The control logic diagrams and criteria checklists were reviewed and modified by team members during team meetings. The TSR control level verification process was used to systematically evaluate 12 LCOs, 22 AC programs, and approximately 100 program key elements identified in the TWRS TSR document. The verification of each TSR control required a team consensus. Based on the results of the process, refinements were identified and the TWRS TSRs were modified as appropriate. A final report documenting key assumptions and the control level designation for each TSR control was prepared and is maintained on file for future reference. The results of the process were used as a reference in the RL review of the final TWRS TSRs and control suite. RL concluded that the TSR control level verification process is clear and logically based upon DOE Order 5480.22, Technical Safety Requirements, and other TSR control selection guidelines. The process provides a documented, traceable basis for TSR level decisions and is a valid reference for preparation of new TSRs.

Similar Papers
  • Single Report

Technical Safety Requirements for the B695 Segment of the Decontamination and Waste Treatment Facility

  • Sep 07, 2007
  • H Larson
  • Single Report

ACCIDENT ANALYSES & CONTROL OPTIONS IN SUPPORT OF THE SLUDGE WATER SYSTEM SAFETY ANALYSIS

  • Nov 15, 2003
  • J.C Williams
  • Single Report
  • Citations1

Technical Safety Requirements for the Waste Storage Facilities May 2014

  • Apr 16, 2014
  • D Laycak
  • Single Report
  • Citations1

Data quality objectives for TWRS privatization phase 1: confirm tank T is an appropriate feed source for low-activity waste feed batch X

  • Jun 01, 1999
  • D.M Nguyen
  • Single Report

Idaho National Laboratory Quarterly Performance An

  • Aug 01, 2013
  • Lisbeth A Mitchell
  • Single Report

Canister Storage Building (CSB) Technical Safety Requirements

  • May 10, 2000
  • D.E Krahn
  • Single Report
  • Citations2

Technical Basis for Chemistry Control Program

  • Mar 29, 2001
  • L A Fort
  • Single Report
  • Citations7

Tank waste remediation system retrieval and disposal mission initial updated baseline summary

  • Jan 09, 1998
  • W.R Swita
  • Single Report

Cold Vacuum Drying (CVD) Facility Technical Safety Requirements

  • Dec 16, 1999
  • D.E Krahn
  • Single Report

References for HNF-SD-WM-TRD-007, ``System specification for the double-shell tank system: HNF-PROs, CFRs, DOE Orders, WACs``

  • Jul 30, 1998
  • C.P Shaw
  • Single Report

Double shell tanks (DST) chemistry control data quality objectives

  • Aug 29, 2001
  • D L Banning
  • Conference Article
  • Citations7

ISO 26262 system level functional safety validation for battery management systems in automobiles

  • Apr 01, 2017
  • 2017 Innovations in Power and Advanced Computing Technologies (i-PACT)
  • Jihas Khan
  • Single Report

Technical basis document for natural event hazards

  • Mar 20, 2003
  • D M Carson
  • Single Report

TECHNICAL BASIS FOR THE NUCLEAR CRITICALITY REPRESENTATIVE ACCIDENT & ASSOCIATED REPRESENTED HAZARDOUS CONDITIONS

  • Mar 03, 2005
  • J M Grigsby
  • Single Report

Control Decisions for Flammable Gas Hazards in Double Contained Receiver Tanks (DCRTs)

  • Jun 28, 2000
  • L.J Kripps
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.