• Home
  • Search
  • Test Case Generation and Optimization for Critical Path Testing Using Genetic Algorithm
  • Cite Icon15
  • https://doi.org/10.1007/978-981-13-1595-4_6Copy DOI Icon

Test Case Generation and Optimization for Critical Path Testing Using Genetic Algorithm

  • Oct 31, 2018
  • Deepti Bala Mishra +3 more
Show More
  • Abstract
  • Literature Map
  • References
  • Citations
  • Similar Papers
Abstract

This paper presents a method for path testing by generating the test data automatically and optimizing the test data to test the critical paths for a software under test (SUT), using real-coded genetic algorithm. Real encoding is used for automatic test data generation, and a representative test suite, which achieves 100% path coverage, is found as an optimum result. In this paper, the proposed real-coded genetic algorithm for path coverage (RCGAPC) generates a set of inputs for testing a specific software and outperforms by giving effective and efficient results in terms of less number of test data generation counts. In the proposed approach, one-to-one injective mapping scheme is used for mapping the test data to the corresponding path and the most critical path is covered during path testing of a specific software. It seems to be faster than the traditional GA in covering critical path. The proposed method can reduce the number of test data generation required for path testing of a SUT and give an optimized Test suite that covers 100% path for specific software.

Similar Papers
  • Book Chapter
  • Citations4

White Box Testing Using Genetic Algorithm—An Extensive Study

  • Jan 01, 2020
  • Deepti Bala Mishra +2
  • Conference Article
  • Citations6

Generating test data using ant Colony Optimization (ACO) algorithm and UML state machine diagram in gray box testing approach

  • Aug 01, 2016
  • Siska Arifiani +1
  • Research Article
  • Citations5

Critical components testing using hybrid genetic algorithm

  • Aug 26, 2013
  • ACM SIGSOFT Software Engineering Notes
  • D Jeya Mala +2
  • Research Article
  • Citations7

Crow Search Algorithm with Improved Objective Function for Test Case Generation and Optimization

  • Jan 01, 2022
  • Intelligent Automation & Soft Computing
  • Meena Sharma +1
  • Research Article
  • Citations14

Diversity-Oriented Test Suite Generation for EFSM Model

  • Feb 28, 2020
  • IEEE Transactions on Reliability
  • Ruilian Zhao +3
  • Research Article

Software Test Data Generation based on Path Testing using Genetic Algorithms

  • Mar 30, 2020
  • International Journal of Recent Technology and Engineering (IJRTE)
  • Tina Sachdeva* +1
  • Research Article
  • Citations6

Test Data Generation Based on Test Path Discovery Using Intelligent Water Drop

  • Apr 01, 2012
  • International Journal of Applied Metaheuristic Computing
  • Praveen Ranjan Srivastava +3
  • PDF
  • Research Article
  • Citations18

Optimal path test data generation based on hybrid negative selection algorithm and genetic algorithm

  • Nov 30, 2020
  • PLoS ONE
  • Shayma Mustafa Mohi-Aldeen +2
  • Book Chapter
  • Citations3

Genetic Algorithm-Based Approach for Adequate Test Data Generation

  • Jan 01, 2014
  • Swagatika Swain +1
  • PDF
  • Research Article

Comparative Performance Evaluation of �BA-TPF� Technique for Regression Test Case Optimization

  • Dec 01, 2018
  • Indian Journal of Science and Technology
  • Sandeep Dalal +2
  • Research Article
  • Citations10

Evolutionary algorithms for path coverage test data generation and optimization: a review

  • Jul 01, 2019
  • Indonesian Journal of Electrical Engineering and Computer Science
  • Deepti Bala Mishra +2
  • Research Article
  • Citations8

A feedback-directed method of evolutionary test data generation for parallel programs

  • Apr 22, 2020
  • Information and Software Technology
  • Dunwei Gong +4
  • Conference Article

Test Case Generation for Vulnerability Detection Using Genetic Algorithm

  • Jan 01, 2016
  • Bo Shuai +4
  • Research Article
  • Citations46

Multiple-path testing for cross site scripting using genetic algorithms

  • Nov 26, 2015
  • Journal of Systems Architecture
  • Moataz A Ahmed +1
  • Conference Article
  • Citations56

Test Data Generation from UML State Machine Diagrams using GAs

  • Aug 01, 2007
  • Chartchai Doungsa-Ard +3
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.