Test Results of a Corrosion Logging Technique Using Electromagnetic Thickness and Pipe Analysis Logging Tools

Show More
  • Abstract
  • Literature Map
  • Citations
  • Similar Papers
Abstract

Summary Recent innovations in subsurface corrosion practices of the Arabian American Oil Co. (ARAMCO) have reduced logging and workover costs substantially and have permitted the detection of corrosion in the outer string of two concentric casing strings. At the request of ARAMCO, Schlumberger conducted test under both simulated and field conditions. Results showed that the data required to evaluate casing corrosion in a 7-in. × 9 5/8 -in. completion can be obtained during a single logging run using a 21.6-in. coil spacing electromagnetic thickness tool (ETT-A TM) sonde (as opposed to two runs with 17.6-in. and 21.6-in. sondes previously used). In addition, corrosion of the outer string of 9 5/8-in. or 13 3/8-in. casing can be detected by using the results of the ETT-A logs and pipe-analysis tool (PAT) logs or caliper logs. To date, the application of this technique has been very successful in ARAMCO's operations. Introduction For several years ARAMCO has used the ETT-A in conjunction with the multifingered caliper (MFC) tool for monitoring casing corrosion in single strings of both 7-in. and 9 5/8-in. casing. The results of these logs were often the basis for workover recommendations in injection wells and to a greater extent, when run in conjunction with workover operations on producing wells, the basis for additional operations to ensure good wellbore integrity. In the past, two separate logging runs were made to evaluate corrosion in each of the 7-in. and 9 5/8-in. casing strings. The 17.6-in. coil spacing ETT-A sonde was used in 7-in. casing while the 21.6-in. coil spacing ETT-A sonde was employed in 9 5/8-in. casing. The obvious disadvantage of this technique is the additional cost incurred in making two separate logging runs. An additional disadvantage is the added workover rig downtime. As corrosion in the near-surface outer string of dual casing strings increased, it became imperative to develop a technique by which corrosion in the outer string could be detected and corrected before complete breakdown of the casing resulted in underground communication or surface leaks. To this end ARAMCO approached Schlumberger to determine whether any of the corrosion monitoring tools (specifically the ETT-A) then in use could be adapted to detect corrosion in the outer string of two strings of pipe and to determine whether an optimal coil spacing existed that could be used in both 7-in. and 9 5/8-in. casing strings. Tests were undertaken by Schlumberger in their AlKhobar. Saudi Arabia, shops to determine the optimal coil spacing of the ETT-A and to confirm that this spacing could respond to the total metal of dual casing strings. Once this optimal spacing was determined, it would then be possible to use the ETT-A to check the total metal present, and when run in conjunction with the PAT or MFC, it would be possible to differentiate the corrosion affecting the inner and outer strings. JPT P. 801^

Similar Papers
  • Conference Article
  • Citations6

Casing Centralization in Irregular Wellbores

  • Jun 25, 2017
  • Hans Joakim Skadsem +2
  • Conference Article
  • Citations1

Casing-Running Analysis in Riserless Topholes

  • Oct 30, 2011
  • Robello Samuel +1
  • Conference Article
  • Citations2

Prediction of Surface Wellhead Deformation Via Calculation of Tubular Growth Due to Thermal Effects

  • May 15, 2023
  • SPE Western Regional Meeting
  • Manuel Alejandro Proano +5
  • Research Article
  • Citations6

Thermal Effects on Subsea-Wellhead Fatigue During Workover Operations

  • Aug 01, 2016
  • Journal of Petroleum Technology
  • Chris Carpenter
  • Conference Article
  • Citations2

Step-Change Performance Improvement in Wellbore Sidetrack Operations: A Kuwait Dual-Casing Exit Case Study

  • Jan 29, 2018
  • Ali Al Khaldy +11
  • Conference Article
  • Citations3

Completion Of Hot Dry Rock Geothermal Well Systems

  • Sep 23, 1979
  • Roland A Pettitt
  • Research Article

Role of Borehole Geophysics in Underground Waste Storage and Artificial Recharge: ABSTRACT

  • Jan 01, 1973
  • AAPG Bulletin
  • W S Keys, R F Brown
  • Research Article
  • Citations5

Analysis of Fluid Input Wells by Shut-In Pressures

  • Jul 01, 1956
  • Journal of Petroleum Technology
  • A.R Groeneman +1
  • Research Article
  • Citations3

On the suitability of premium OCTG tubing connections for CCS CO2 injection wells – a full scale physical evaluation

  • Jan 20, 2023
  • International Journal of Greenhouse Gas Control
  • Egbert Van Riet +5
  • Research Article
  • Citations1

The Fluid Travel Log

  • Aug 01, 1964
  • Journal of Petroleum Technology
  • Terry Walker +3
  • Conference Article
  • Citations3

Field Cases to Demonstrate Application of through Tubing Inflatable Anchoring Packer to Selectively Stimulate Vertical Dump Water Injector Wells with Cross Flowing Zones

  • Oct 18, 2004
  • A M Al-Dubais +5
  • Research Article
  • Citations20

A Production Logging Tool With Simultaneous Measurements

  • Feb 01, 1980
  • Journal of Petroleum Technology
  • R.A Anderson +3
  • Conference Article
  • Citations17

Buckling of Tubing inside Casing

  • Mar 06, 2012
  • Robert F Mitchell
  • Research Article
  • Citations17

Buckling of Tubing Inside Casing

  • Nov 16, 2012
  • SPE Drilling & Completion
  • Robert F Mitchell
  • Conference Article
  • Citations8

Drilling and Workover Experiences in the Greater Ekofisk Area

  • Mar 15, 1987
  • H K Anvik +1
Cactus Communications logo

Copyright 2026 Cactus Communications. All rights reserved.